<?xml version='1.0' encoding='ISO-8859-1'?><?xml-stylesheet type='text/xsl' href='alltravelinfo.xsl'?><travelerinformation>
  <workzones>
    <DESIGNATION>BU</DESIGNATION>
    <TRAVELWAY_NAME>36</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>.14 MILES BEFORE CST MITCHELL AVE N                                                                 </START_PT>
    <END_PT>AT CST MITCHELL AVE N                                                                               </END_PT>
    <START_DATE>11-JUN-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>SHOULDER WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>00</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.14 MILES BEFORE CST MITCHELL AVE N                                                                 </BEG_REF_PT>
    <END_REF_PT>AT CST MITCHELL AVE N                                                                               </END_REF_PT>
    <CLOSURE_LOCATION>NONE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.14 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>CST MITCHELL AVE N</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>CST MITCHELL AVE N</END_REF_PT2>
    <COUNTY>LIVINGSTON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>BU</DESIGNATION>
    <TRAVELWAY_NAME>36</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>.06 MILES BEFORE US 36 W                                                                            </START_PT>
    <END_PT>.01 MILES BEFORE US 36 W                                                                            </END_PT>
    <START_DATE>23-JUN-09</START_DATE>
    <END_DATE>21-JUL-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>2000</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.06 MILES BEFORE US 36 W                                                                            </BEG_REF_PT>
    <END_REF_PT>.01 MILES BEFORE US 36 W                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.06 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>US 36 W</BEG_REF_PT2>
    <END_REF_PT1>.01 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>US 36 W</END_REF_PT2>
    <COUNTY>MACON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>BU</DESIGNATION>
    <TRAVELWAY_NAME>36</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>.01 MILES AFTER US 36 E                                                                             </START_PT>
    <END_PT>.06 MILES AFTER US 36 E                                                                             </END_PT>
    <START_DATE>23-JUN-09</START_DATE>
    <END_DATE>21-JUL-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>2000</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.01 MILES AFTER US 36 E                                                                             </BEG_REF_PT>
    <END_REF_PT>.06 MILES AFTER US 36 E                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.01 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>US 36 E</BEG_REF_PT2>
    <END_REF_PT1>.06 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>US 36 E</END_REF_PT2>
    <COUNTY>MACON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>BU</DESIGNATION>
    <TRAVELWAY_NAME>60</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>.22 MILES AFTER CST 438 W                                                                           </START_PT>
    <END_PT>AT CST THREE RIVERS BLVD S                                                                          </END_PT>
    <START_DATE>26-JAN-09</START_DATE>
    <END_DATE>31-JUL-09</END_DATE>
    <WORK_TYPE>PRIVATE / UTILITY CONTRACT WORK IN AREA</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0800</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.22 MILES AFTER CST 438 W                                                                           </BEG_REF_PT>
    <END_REF_PT>AT CST THREE RIVERS BLVD S                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.22 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>CST 438 W</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>CST THREE RIVERS BLVD S</END_REF_PT2>
    <COUNTY>BUTLER</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>BU</DESIGNATION>
    <TRAVELWAY_NAME>60</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>AT CST THREE RIVERS BLVD S                                                                          </START_PT>
    <END_PT>.22 MILES BEFORE CST 438 E                                                                          </END_PT>
    <START_DATE>26-JAN-09</START_DATE>
    <END_DATE>31-JUL-09</END_DATE>
    <WORK_TYPE>PRIVATE / UTILITY CONTRACT WORK IN AREA</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0800</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT CST THREE RIVERS BLVD S                                                                          </BEG_REF_PT>
    <END_REF_PT>.22 MILES BEFORE CST 438 E                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>CST THREE RIVERS BLVD S</BEG_REF_PT2>
    <END_REF_PT1>.22 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>CST 438 E</END_REF_PT2>
    <COUNTY>BUTLER</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>CRD</DESIGNATION>
    <TRAVELWAY_NAME>OLD HWY 21</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>AT CRD GOLDMAN RD SPUR E                                                                            </START_PT>
    <END_PT>.51 MILES AFTER CRD GOLDMAN RD SPUR W                                                               </END_PT>
    <START_DATE>01-JUN-09</START_DATE>
    <END_DATE>03-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0100</START_TIME>
    <END_TIME>2400</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT CRD GOLDMAN RD SPUR E                                                                            </BEG_REF_PT>
    <END_REF_PT>.51 MILES AFTER CRD GOLDMAN RD SPUR W                                                               </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>CRD GOLDMAN RD SPUR E</BEG_REF_PT2>
    <END_REF_PT1>.51 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>CRD GOLDMAN RD SPUR W</END_REF_PT2>
    <COUNTY>JEFFERSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>CST</DESIGNATION>
    <TRAVELWAY_NAME>BRENTWOOD BLVD</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>.19 MILES BEFORE CST EAGER RD W                                                                     </START_PT>
    <END_PT>AT CST EAGER RD W                                                                                   </END_PT>
    <START_DATE>01-JUL-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0900</START_TIME>
    <END_TIME>1200</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.19 MILES BEFORE CST EAGER RD W                                                                     </BEG_REF_PT>
    <END_REF_PT>AT CST EAGER RD W                                                                                   </END_REF_PT>
    <CLOSURE_LOCATION>LEFT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.19 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>CST EAGER RD W</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>CST EAGER RD W</END_REF_PT2>
    <COUNTY>ST. LOUIS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>CST</DESIGNATION>
    <TRAVELWAY_NAME>EWING AVE</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>AT US 24 E                                                                                          </START_PT>
    <END_PT>.08 MILES AFTER US 24 W                                                                             </END_PT>
    <START_DATE>26-MAY-09</START_DATE>
    <END_DATE>11-SEP-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0900</START_TIME>
    <END_TIME>1200</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT US 24 E                                                                                          </BEG_REF_PT>
    <END_REF_PT>.08 MILES AFTER US 24 W                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>US 24 E</BEG_REF_PT2>
    <END_REF_PT1>.08 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>US 24 W</END_REF_PT2>
    <COUNTY>JACKSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>CST</DESIGNATION>
    <TRAVELWAY_NAME>EWING AVE</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>.08 MILES BEFORE US 24 E                                                                            </START_PT>
    <END_PT>AT US 24 E                                                                                          </END_PT>
    <START_DATE>26-MAY-09</START_DATE>
    <END_DATE>11-SEP-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0900</START_TIME>
    <END_TIME>1200</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.08 MILES BEFORE US 24 E                                                                            </BEG_REF_PT>
    <END_REF_PT>AT US 24 E                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.08 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>US 24 E</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>US 24 E</END_REF_PT2>
    <COUNTY>JACKSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>CST</DESIGNATION>
    <TRAVELWAY_NAME>HANLEY RD</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>AT CST LOVELLA AVE W                                                                                </START_PT>
    <END_PT>.1 MILES AFTER US 40 W                                                                              </END_PT>
    <START_DATE>29-DEC-08</START_DATE>
    <END_DATE>29-JUL-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0500</START_TIME>
    <END_TIME>0500</END_TIME>
    <NUMBER_LANES_CLOSED>03</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT CST LOVELLA AVE W                                                                                </BEG_REF_PT>
    <END_REF_PT>.1 MILES AFTER US 40 W                                                                              </END_REF_PT>
    <CLOSURE_LOCATION>NONE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>CST LOVELLA AVE W</BEG_REF_PT2>
    <END_REF_PT1>.1 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>US 40 W</END_REF_PT2>
    <COUNTY>ST. LOUIS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>CST</DESIGNATION>
    <TRAVELWAY_NAME>HANLEY RD</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>AT CST HANLEY RD S                                                                                  </START_PT>
    <END_PT>AT IS 64 E                                                                                          </END_PT>
    <START_DATE>14-DEC-08</START_DATE>
    <END_DATE>31-DEC-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>1600</START_TIME>
    <END_TIME>0500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT CST HANLEY RD S                                                                                  </BEG_REF_PT>
    <END_REF_PT>AT IS 64 E                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>NONE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>CST HANLEY RD S</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>IS 64 E</END_REF_PT2>
    <COUNTY>ST. LOUIS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>CST</DESIGNATION>
    <TRAVELWAY_NAME>HANLEY RD</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>AT CST LOVELLA AVE W                                                                                </START_PT>
    <END_PT>.1 MILES AFTER US 40 W                                                                              </END_PT>
    <START_DATE>29-DEC-08</START_DATE>
    <END_DATE>29-JUL-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0500</START_TIME>
    <END_TIME>0500</END_TIME>
    <NUMBER_LANES_CLOSED>03</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT CST LOVELLA AVE W                                                                                </BEG_REF_PT>
    <END_REF_PT>.1 MILES AFTER US 40 W                                                                              </END_REF_PT>
    <CLOSURE_LOCATION>NONE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>CST LOVELLA AVE W</BEG_REF_PT2>
    <END_REF_PT1>.1 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>US 40 W</END_REF_PT2>
    <COUNTY>ST. LOUIS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>CST</DESIGNATION>
    <TRAVELWAY_NAME>MC KNIGHT RD</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>.07 MILES BEFORE IS 64 E                                                                            </START_PT>
    <END_PT>.07 MILES AFTER US 40 W                                                                             </END_PT>
    <START_DATE>30-JUN-09</START_DATE>
    <END_DATE>06-JUL-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.07 MILES BEFORE IS 64 E                                                                            </BEG_REF_PT>
    <END_REF_PT>.07 MILES AFTER US 40 W                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.07 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>IS 64 E</BEG_REF_PT2>
    <END_REF_PT1>.07 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>US 40 W</END_REF_PT2>
    <COUNTY>ST. LOUIS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>CST</DESIGNATION>
    <TRAVELWAY_NAME>MC KNIGHT RD</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>.07 MILES BEFORE IS 64 E                                                                            </START_PT>
    <END_PT>.07 MILES AFTER US 40 W                                                                             </END_PT>
    <START_DATE>01-JUL-09</START_DATE>
    <END_DATE>03-JUL-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>NIGHT</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>1800</START_TIME>
    <END_TIME>0600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.07 MILES BEFORE IS 64 E                                                                            </BEG_REF_PT>
    <END_REF_PT>.07 MILES AFTER US 40 W                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.07 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>IS 64 E</BEG_REF_PT2>
    <END_REF_PT1>.07 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>US 40 W</END_REF_PT2>
    <COUNTY>ST. LOUIS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>CST</DESIGNATION>
    <TRAVELWAY_NAME>OAKLAND AVE</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT CST SKINKER BLVD S                                                                               </START_PT>
    <END_PT>.2 MILES AFTER US 40 E                                                                              </END_PT>
    <START_DATE>14-DEC-08</START_DATE>
    <END_DATE>31-DEC-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>1600</START_TIME>
    <END_TIME>0500</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT CST SKINKER BLVD S                                                                               </BEG_REF_PT>
    <END_REF_PT>.2 MILES AFTER US 40 E                                                                              </END_REF_PT>
    <CLOSURE_LOCATION>NONE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>CST SKINKER BLVD S</BEG_REF_PT2>
    <END_REF_PT1>.2 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>US 40 E</END_REF_PT2>
    <COUNTY>ST. LOUIS CITY</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>CST</DESIGNATION>
    <TRAVELWAY_NAME>OAKLAND AVE</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>AT CST MACKLIND AVE S                                                                               </START_PT>
    <END_PT>AT CST CLAYTON AVE W                                                                                </END_PT>
    <START_DATE>01-JUL-09</START_DATE>
    <END_DATE>06-JUL-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0900</START_TIME>
    <END_TIME>1500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT CST MACKLIND AVE S                                                                               </BEG_REF_PT>
    <END_REF_PT>AT CST CLAYTON AVE W                                                                                </END_REF_PT>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>CST MACKLIND AVE S</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>CST CLAYTON AVE W</END_REF_PT2>
    <COUNTY>ST. LOUIS CITY</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>CST</DESIGNATION>
    <TRAVELWAY_NAME>OAKLAND AVE</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>.2 MILES BEFORE IS 64 E                                                                             </START_PT>
    <END_PT>AT CST SKINKER BLVD S                                                                               </END_PT>
    <START_DATE>14-DEC-08</START_DATE>
    <END_DATE>31-DEC-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>1600</START_TIME>
    <END_TIME>0500</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.2 MILES BEFORE IS 64 E                                                                             </BEG_REF_PT>
    <END_REF_PT>AT CST SKINKER BLVD S                                                                               </END_REF_PT>
    <CLOSURE_LOCATION>NONE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.2 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>IS 64 E</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>CST SKINKER BLVD S</END_REF_PT2>
    <COUNTY>ST. LOUIS CITY</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>CST</DESIGNATION>
    <TRAVELWAY_NAME>PICKETT RD</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>.02 MILES BEFORE US 71 S                                                                            </START_PT>
    <END_PT>LESS THAN .01 MILES AFTER IS 29 N                                                                   </END_PT>
    <START_DATE>16-JUN-09</START_DATE>
    <END_DATE>19-AUG-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.02 MILES BEFORE US 71 S                                                                            </BEG_REF_PT>
    <END_REF_PT>LESS THAN .01 MILES AFTER IS 29 N                                                                   </END_REF_PT>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.02 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>US 71 S</BEG_REF_PT2>
    <END_REF_PT1>LESS THAN .01 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>IS 29 N</END_REF_PT2>
    <COUNTY>BUCHANAN</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>CST</DESIGNATION>
    <TRAVELWAY_NAME>PICKETT RD</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>LESS THAN .01 MILES BEFORE US 71 N                                                                  </START_PT>
    <END_PT>.02 MILES AFTER IS 29 S                                                                             </END_PT>
    <START_DATE>17-JUN-09</START_DATE>
    <END_DATE>19-AUG-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>LESS THAN .01 MILES BEFORE US 71 N                                                                  </BEG_REF_PT>
    <END_REF_PT>.02 MILES AFTER IS 29 S                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>LESS THAN .01 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>US 71 N</BEG_REF_PT2>
    <END_REF_PT1>.02 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>IS 29 S</END_REF_PT2>
    <COUNTY>BUCHANAN</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>CST</DESIGNATION>
    <TRAVELWAY_NAME>PICKETT RD</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>LESS THAN .01 MILES BEFORE US 71 N                                                                  </START_PT>
    <END_PT>.02 MILES AFTER IS 29 S                                                                             </END_PT>
    <START_DATE>16-JUN-09</START_DATE>
    <END_DATE>01-NOV-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>LESS THAN .01 MILES BEFORE US 71 N                                                                  </BEG_REF_PT>
    <END_REF_PT>.02 MILES AFTER IS 29 S                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>LESS THAN .01 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>US 71 N</BEG_REF_PT2>
    <END_REF_PT1>.02 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>IS 29 S</END_REF_PT2>
    <COUNTY>BUCHANAN</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>CST</DESIGNATION>
    <TRAVELWAY_NAME>RUDDER RD</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>.55 MILES AFTER CST LARKIN WILLIAMS RD E                                                            </START_PT>
    <END_PT>AT CST YARNELL RD N                                                                                 </END_PT>
    <START_DATE>29-JUN-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>PAVEMENT MARKING</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.55 MILES AFTER CST LARKIN WILLIAMS RD E                                                            </BEG_REF_PT>
    <END_REF_PT>AT CST YARNELL RD N                                                                                 </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.55 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>CST LARKIN WILLIAMS RD E</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>CST YARNELL RD N</END_REF_PT2>
    <COUNTY>ST. LOUIS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>CST</DESIGNATION>
    <TRAVELWAY_NAME>VAN DE POPULIER RD</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>.23 MILES AFTER IS 635 S                                                                            </START_PT>
    <END_PT>AT MO 9 N                                                                                           </END_PT>
    <START_DATE>09-SEP-08</START_DATE>
    <END_DATE>16-AUG-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0800</START_TIME>
    <END_TIME>2400</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.23 MILES AFTER IS 635 S                                                                            </BEG_REF_PT>
    <END_REF_PT>AT MO 9 N                                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.23 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>IS 635 S</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>MO 9 N</END_REF_PT2>
    <COUNTY>PLATTE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>CST</DESIGNATION>
    <TRAVELWAY_NAME>VAN DE POPULIER RD</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>AT MO 9 N                                                                                           </START_PT>
    <END_PT>.23 MILES BEFORE IS 635 S                                                                           </END_PT>
    <START_DATE>09-SEP-08</START_DATE>
    <END_DATE>16-AUG-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0800</START_TIME>
    <END_TIME>2400</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT MO 9 N                                                                                           </BEG_REF_PT>
    <END_REF_PT>.23 MILES BEFORE IS 635 S                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>MO 9 N</BEG_REF_PT2>
    <END_REF_PT1>.23 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>IS 635 S</END_REF_PT2>
    <COUNTY>PLATTE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>CST</DESIGNATION>
    <TRAVELWAY_NAME>YARNELL RD</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>AT CST RUDDER RD E                                                                                  </START_PT>
    <END_PT>AT CRD SOCCER PARK RD W                                                                             </END_PT>
    <START_DATE>29-JUN-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>PAVEMENT MARKING</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT CST RUDDER RD E                                                                                  </BEG_REF_PT>
    <END_REF_PT>AT CRD SOCCER PARK RD W                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>CST RUDDER RD E</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>CRD SOCCER PARK RD W</END_REF_PT2>
    <COUNTY>ST. LOUIS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>CST</DESIGNATION>
    <TRAVELWAY_NAME>YARNELL RD</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>AT CRD SOCCER PARK RD W                                                                             </START_PT>
    <END_PT>AT CST RUDDER RD E                                                                                  </END_PT>
    <START_DATE>29-JUN-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>PAVEMENT MARKING</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT CRD SOCCER PARK RD W                                                                             </BEG_REF_PT>
    <END_REF_PT>AT CST RUDDER RD E                                                                                  </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>CRD SOCCER PARK RD W</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>CST RUDDER RD E</END_REF_PT2>
    <COUNTY>ST. LOUIS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>170</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>LESS THAN .01 MILES BEFORE CST CLAYTON RD W                                                         </START_PT>
    <END_PT>AT CST EAGER RD W                                                                                   </END_PT>
    <START_DATE>01-JAN-08</START_DATE>
    <END_DATE>31-DEC-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>2200</START_TIME>
    <END_TIME>2400</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>LESS THAN .01 MILES BEFORE CST CLAYTON RD W                                                         </BEG_REF_PT>
    <END_REF_PT>AT CST EAGER RD W                                                                                   </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>LESS THAN .01 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>CST CLAYTON RD W</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>CST EAGER RD W</END_REF_PT2>
    <COUNTY>ST. LOUIS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>229</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>AT IS 29 N                                                                                          </START_PT>
    <END_PT>1.75 MILES AFTER CST HIGHLAND AVE E                                                                 </END_PT>
    <START_DATE>11-FEB-09</START_DATE>
    <END_DATE>31-DEC-09</END_DATE>
    <WORK_TYPE>SWEEPING AND FLUSHING PAVEMENT SURFACE</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1400</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT IS 29 N                                                                                          </BEG_REF_PT>
    <END_REF_PT>1.75 MILES AFTER CST HIGHLAND AVE E                                                                 </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>IS 29 N</BEG_REF_PT2>
    <END_REF_PT1>1.75 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>CST HIGHLAND AVE E</END_REF_PT2>
    <COUNTY>BUCHANAN</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>229</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>1.76 MILES BEFORE CST HIGHLAND AVE W                                                                </START_PT>
    <END_PT>AT IS 29 S                                                                                          </END_PT>
    <START_DATE>11-FEB-09</START_DATE>
    <END_DATE>31-DEC-09</END_DATE>
    <WORK_TYPE>SWEEPING AND FLUSHING PAVEMENT SURFACE</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1400</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.76 MILES BEFORE CST HIGHLAND AVE W                                                                </BEG_REF_PT>
    <END_REF_PT>AT IS 29 S                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.76 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>CST HIGHLAND AVE W</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>IS 29 S</END_REF_PT2>
    <COUNTY>BUCHANAN</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>270</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>.02 MILES BEFORE CST BELLEFONTAINE RD S                                                             </START_PT>
    <END_PT>.13 MILES AFTER RT H S                                                                              </END_PT>
    <START_DATE>30-JUN-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>PAVEMENT REPAIR OF CONCRETE PAVEMENT</WORK_TYPE>
    <WORK_HOURS>NIGHT</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>1800</START_TIME>
    <END_TIME>0500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.02 MILES BEFORE CST BELLEFONTAINE RD S                                                             </BEG_REF_PT>
    <END_REF_PT>.13 MILES AFTER RT H S                                                                              </END_REF_PT>
    <CLOSURE_LOCATION>LEFT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.02 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>CST BELLEFONTAINE RD S</BEG_REF_PT2>
    <END_REF_PT1>.13 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT H S</END_REF_PT2>
    <COUNTY>ST. LOUIS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>270</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>.19 MILES BEFORE CST DORSETT RD E                                                                   </START_PT>
    <END_PT>.02 MILES BEFORE CST DORSETT RD E                                                                   </END_PT>
    <START_DATE>02-JUL-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>MILLING AND RESURFACING ASPHALT PAVEMENT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0900</START_TIME>
    <END_TIME>1300</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.19 MILES BEFORE CST DORSETT RD E                                                                   </BEG_REF_PT>
    <END_REF_PT>.02 MILES BEFORE CST DORSETT RD E                                                                   </END_REF_PT>
    <CLOSURE_LOCATION>LEFT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.19 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>CST DORSETT RD E</BEG_REF_PT2>
    <END_REF_PT1>.02 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>CST DORSETT RD E</END_REF_PT2>
    <COUNTY>ST. LOUIS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>29</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>.19 MILES BEFORE CST GUINOTTE AVE E                                                                 </START_PT>
    <END_PT>.06 MILES AFTER CST GUINOTTE AVE W                                                                  </END_PT>
    <START_DATE>11-AUG-08</START_DATE>
    <END_DATE>31-AUG-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0800</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.19 MILES BEFORE CST GUINOTTE AVE E                                                                 </BEG_REF_PT>
    <END_REF_PT>.06 MILES AFTER CST GUINOTTE AVE W                                                                  </END_REF_PT>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.19 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>CST GUINOTTE AVE E</BEG_REF_PT2>
    <END_REF_PT1>.06 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>CST GUINOTTE AVE W</END_REF_PT2>
    <COUNTY>JACKSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>29</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>.34 MILES AFTER CST RIVER FRONT RD E                                                                </START_PT>
    <END_PT>AT MO 210 W                                                                                         </END_PT>
    <START_DATE>07-JUL-08</START_DATE>
    <END_DATE>31-DEC-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0800</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.34 MILES AFTER CST RIVER FRONT RD E                                                                </BEG_REF_PT>
    <END_REF_PT>AT MO 210 W                                                                                         </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.34 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>CST RIVER FRONT RD E</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>MO 210 W</END_REF_PT2>
    <COUNTY>CLAY</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>29</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>AT IS 229 N                                                                                         </START_PT>
    <END_PT>.22 MILES AFTER US 169 S                                                                            </END_PT>
    <START_DATE>11-FEB-09</START_DATE>
    <END_DATE>31-DEC-09</END_DATE>
    <WORK_TYPE>SWEEPING AND FLUSHING PAVEMENT SURFACE</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1400</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT IS 229 N                                                                                         </BEG_REF_PT>
    <END_REF_PT>.22 MILES AFTER US 169 S                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>IS 229 N</BEG_REF_PT2>
    <END_REF_PT1>.22 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>US 169 S</END_REF_PT2>
    <COUNTY>BUCHANAN</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>29</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>.2 MILES BEFORE US 59 N                                                                             </START_PT>
    <END_PT>.15 MILES AFTER RT CC S                                                                             </END_PT>
    <START_DATE>11-FEB-09</START_DATE>
    <END_DATE>31-DEC-09</END_DATE>
    <WORK_TYPE>SWEEPING AND FLUSHING PAVEMENT SURFACE</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1400</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.2 MILES BEFORE US 59 N                                                                             </BEG_REF_PT>
    <END_REF_PT>.15 MILES AFTER RT CC S                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.2 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>US 59 N</BEG_REF_PT2>
    <END_REF_PT1>.15 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT CC S</END_REF_PT2>
    <COUNTY>ANDREW</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>29</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>.16 MILES BEFORE RT K S                                                                             </START_PT>
    <END_PT>.19 MILES AFTER US 59 N                                                                             </END_PT>
    <START_DATE>11-FEB-09</START_DATE>
    <END_DATE>31-DEC-09</END_DATE>
    <WORK_TYPE>SWEEPING AND FLUSHING PAVEMENT SURFACE</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1400</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.16 MILES BEFORE RT K S                                                                             </BEG_REF_PT>
    <END_REF_PT>.19 MILES AFTER US 59 N                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.16 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>RT K S</BEG_REF_PT2>
    <END_REF_PT1>.19 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>US 59 N</END_REF_PT2>
    <COUNTY>ANDREW</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>29</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>.22 MILES BEFORE US 169 N                                                                           </START_PT>
    <END_PT>.08 MILES AFTER IS 229 S                                                                            </END_PT>
    <START_DATE>11-FEB-09</START_DATE>
    <END_DATE>31-DEC-09</END_DATE>
    <WORK_TYPE>SWEEPING AND FLUSHING PAVEMENT SURFACE</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1400</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.22 MILES BEFORE US 169 N                                                                           </BEG_REF_PT>
    <END_REF_PT>.08 MILES AFTER IS 229 S                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.22 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>US 169 N</BEG_REF_PT2>
    <END_REF_PT1>.08 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>IS 229 S</END_REF_PT2>
    <COUNTY>BUCHANAN</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>29</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>AT IS 435 S                                                                                         </START_PT>
    <END_PT>AT IS 435 S                                                                                         </END_PT>
    <START_DATE>19-JUN-09</START_DATE>
    <END_DATE>03-JUL-09</END_DATE>
    <WORK_TYPE>PAVEMENT REPAIR OF CONCRETE PAVEMENT</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>1900</START_TIME>
    <END_TIME>0600</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT IS 435 S                                                                                         </BEG_REF_PT>
    <END_REF_PT>AT IS 435 S                                                                                         </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>IS 435 S</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>IS 435 S</END_REF_PT2>
    <COUNTY>PLATTE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>29</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>AT CST TIFFANY SPRINGS PKWY W                                                                       </START_PT>
    <END_PT>AT US 69 N                                                                                          </END_PT>
    <START_DATE>30-JUN-09</START_DATE>
    <END_DATE>03-JUL-09</END_DATE>
    <WORK_TYPE>RESURFACING WITH HOT-MIX ASPHALT</WORK_TYPE>
    <WORK_HOURS>NIGHT</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>1900</START_TIME>
    <END_TIME>0600</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT CST TIFFANY SPRINGS PKWY W                                                                       </BEG_REF_PT>
    <END_REF_PT>AT US 69 N                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>CST TIFFANY SPRINGS PKWY W</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>US 69 N</END_REF_PT2>
    <COUNTY>PLATTE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>29</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>AT MO 210 W                                                                                         </START_PT>
    <END_PT>.35 MILES BEFORE CST RIVER FRONT RD E                                                               </END_PT>
    <START_DATE>07-JUL-08</START_DATE>
    <END_DATE>31-DEC-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0800</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT MO 210 W                                                                                         </BEG_REF_PT>
    <END_REF_PT>.35 MILES BEFORE CST RIVER FRONT RD E                                                               </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>MO 210 W</BEG_REF_PT2>
    <END_REF_PT1>.35 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>CST RIVER FRONT RD E</END_REF_PT2>
    <COUNTY>CLAY</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>29</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>.13 MILES BEFORE CST FRONT ST W                                                                     </START_PT>
    <END_PT>AT MO 9 S                                                                                           </END_PT>
    <START_DATE>27-OCT-08</START_DATE>
    <END_DATE>30-OCT-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>SATURDAY</WEEKEND>
    <START_TIME>0900</START_TIME>
    <END_TIME>1500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.13 MILES BEFORE CST FRONT ST W                                                                     </BEG_REF_PT>
    <END_REF_PT>AT MO 9 S                                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.13 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>CST FRONT ST W</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>MO 9 S</END_REF_PT2>
    <COUNTY>JACKSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>35</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>.48 MILES AFTER MO 116 W                                                                            </START_PT>
    <END_PT>1.69 MILES BEFORE LP 35 S                                                                           </END_PT>
    <START_DATE>14-MAY-09</START_DATE>
    <END_DATE>25-NOV-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0100</START_TIME>
    <END_TIME>2400</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.48 MILES AFTER MO 116 W                                                                            </BEG_REF_PT>
    <END_REF_PT>1.69 MILES BEFORE LP 35 S                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.48 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>MO 116 W</BEG_REF_PT2>
    <END_REF_PT1>1.69 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>LP 35 S</END_REF_PT2>
    <COUNTY>CLINTON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>35</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>1.69 MILES AFTER CST EVERGREEN ST E                                                                 </START_PT>
    <END_PT>.48 MILES BEFORE MO 116 E                                                                           </END_PT>
    <START_DATE>11-MAR-09</START_DATE>
    <END_DATE>25-NOV-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0100</START_TIME>
    <END_TIME>2400</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.69 MILES AFTER CST EVERGREEN ST E                                                                 </BEG_REF_PT>
    <END_REF_PT>.48 MILES BEFORE MO 116 E                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.69 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>CST EVERGREEN ST E</BEG_REF_PT2>
    <END_REF_PT1>.48 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>MO 116 E</END_REF_PT2>
    <COUNTY>CLINTON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>435</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>.07 MILES BEFORE US 24 E                                                                            </START_PT>
    <END_PT>.95 MILES BEFORE MO 210 E                                                                           </END_PT>
    <START_DATE>29-JUN-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>RESURFACING WITH HOT-MIX ASPHALT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0900</START_TIME>
    <END_TIME>1500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.07 MILES BEFORE US 24 E                                                                            </BEG_REF_PT>
    <END_REF_PT>.95 MILES BEFORE MO 210 E                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.07 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>US 24 E</BEG_REF_PT2>
    <END_REF_PT1>.95 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>MO 210 E</END_REF_PT2>
    <COUNTY>JACKSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>435</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>.96 MILES AFTER MO 210 E                                                                            </START_PT>
    <END_PT>.07 MILES AFTER US 24 E                                                                             </END_PT>
    <START_DATE>29-JUN-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>RESURFACING WITH HOT-MIX ASPHALT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0900</START_TIME>
    <END_TIME>1500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.96 MILES AFTER MO 210 E                                                                            </BEG_REF_PT>
    <END_REF_PT>.07 MILES AFTER US 24 E                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.96 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>MO 210 E</BEG_REF_PT2>
    <END_REF_PT1>.07 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>US 24 E</END_REF_PT2>
    <COUNTY>JACKSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>44</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>.42 MILES BEFORE MO 39 S                                                                            </START_PT>
    <END_PT>.08 MILES AFTER MO 39 N                                                                             </END_PT>
    <START_DATE>24-APR-09</START_DATE>
    <END_DATE>25-NOV-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1800</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.42 MILES BEFORE MO 39 S                                                                            </BEG_REF_PT>
    <END_REF_PT>.08 MILES AFTER MO 39 N                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.42 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>MO 39 S</BEG_REF_PT2>
    <END_REF_PT1>.08 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>MO 39 N</END_REF_PT2>
    <COUNTY>LAWRENCE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>44</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT MO 39 S                                                                                          </START_PT>
    <END_PT>1.1 MILES AFTER RT O N                                                                              </END_PT>
    <START_DATE>15-JUN-09</START_DATE>
    <END_DATE>15-JUL-09</END_DATE>
    <WORK_TYPE>RESURFACING WITH HOT-MIX ASPHALT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>2000</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT MO 39 S                                                                                          </BEG_REF_PT>
    <END_REF_PT>1.1 MILES AFTER RT O N                                                                              </END_REF_PT>
    <CLOSURE_LOCATION>LEFT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>MO 39 S</BEG_REF_PT2>
    <END_REF_PT1>1.1 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT O N</END_REF_PT2>
    <COUNTY>LAWRENCE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>44</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>.73 MILES AFTER RT J E                                                                              </START_PT>
    <END_PT>2.07 MILES BEFORE RT A N                                                                            </END_PT>
    <START_DATE>02-JUL-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>PRIVATE / UTILITY CONTRACT WORK IN AREA</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.73 MILES AFTER RT J E                                                                              </BEG_REF_PT>
    <END_REF_PT>2.07 MILES BEFORE RT A N                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>LEFT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.73 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>RT J E</BEG_REF_PT2>
    <END_REF_PT1>2.07 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>RT A N</END_REF_PT2>
    <COUNTY>LACLEDE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>44</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT LP 44 W                                                                                          </START_PT>
    <END_PT>AT MO 28 W                                                                                          </END_PT>
    <START_DATE>01-JUL-09</START_DATE>
    <END_DATE>01-SEP-09</END_DATE>
    <WORK_TYPE>PAVEMENT REPAIR OF CONCRETE PAVEMENT</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>SATURDAY</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1900</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT LP 44 W                                                                                          </BEG_REF_PT>
    <END_REF_PT>AT MO 28 W                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>LP 44 W</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>MO 28 W</END_REF_PT2>
    <COUNTY>PULASKI</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>44</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>.04 MILES BEFORE US 50 E                                                                            </START_PT>
    <END_PT>.15 MILES AFTER US 50 E                                                                             </END_PT>
    <START_DATE>01-JUL-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>NIGHT</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>1900</START_TIME>
    <END_TIME>0500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.04 MILES BEFORE US 50 E                                                                            </BEG_REF_PT>
    <END_REF_PT>.15 MILES AFTER US 50 E                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.04 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>US 50 E</BEG_REF_PT2>
    <END_REF_PT1>.15 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>US 50 E</END_REF_PT2>
    <COUNTY>FRANKLIN</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>44</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>.5 MILES BEFORE CRD LEWIS RD S                                                                      </START_PT>
    <END_PT>.5 MILES AFTER CRD LEWIS RD N                                                                       </END_PT>
    <START_DATE>15-JUN-09</START_DATE>
    <END_DATE>15-SEP-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>1900</START_TIME>
    <END_TIME>2400</END_TIME>
    <NUMBER_LANES_CLOSED>00</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.5 MILES BEFORE CRD LEWIS RD S                                                                      </BEG_REF_PT>
    <END_REF_PT>.5 MILES AFTER CRD LEWIS RD N                                                                       </END_REF_PT>
    <CLOSURE_LOCATION>NONE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.5 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>CRD LEWIS RD S</BEG_REF_PT2>
    <END_REF_PT1>.5 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>CRD LEWIS RD N</END_REF_PT2>
    <COUNTY>ST. LOUIS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>44</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>.5 MILES BEFORE CRD LEWIS RD S                                                                      </START_PT>
    <END_PT>.25 MILES AFTER CRD LEWIS RD N                                                                      </END_PT>
    <START_DATE>01-JUL-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>NIGHT</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>1900</START_TIME>
    <END_TIME>0500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.5 MILES BEFORE CRD LEWIS RD S                                                                      </BEG_REF_PT>
    <END_REF_PT>.25 MILES AFTER CRD LEWIS RD N                                                                      </END_REF_PT>
    <CLOSURE_LOCATION>LEFT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.5 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>CRD LEWIS RD S</BEG_REF_PT2>
    <END_REF_PT1>.25 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>CRD LEWIS RD N</END_REF_PT2>
    <COUNTY>ST. LOUIS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>44</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>.08 MILES BEFORE MO 39 S                                                                            </START_PT>
    <END_PT>.42 MILES AFTER MO 39 N                                                                             </END_PT>
    <START_DATE>24-APR-09</START_DATE>
    <END_DATE>25-NOV-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1800</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.08 MILES BEFORE MO 39 S                                                                            </BEG_REF_PT>
    <END_REF_PT>.42 MILES AFTER MO 39 N                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.08 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>MO 39 S</BEG_REF_PT2>
    <END_REF_PT1>.42 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>MO 39 N</END_REF_PT2>
    <COUNTY>LAWRENCE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>470</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT CST WOODS CHAPEL RD E                                                                            </START_PT>
    <END_PT>AT IS 70 W                                                                                          </END_PT>
    <START_DATE>08-JUN-09</START_DATE>
    <END_DATE>17-JUL-09</END_DATE>
    <WORK_TYPE>GUARD RAIL WORK</WORK_TYPE>
    <WORK_HOURS>NIGHT</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>1800</START_TIME>
    <END_TIME>0600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT CST WOODS CHAPEL RD E                                                                            </BEG_REF_PT>
    <END_REF_PT>AT IS 70 W                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>LEFT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>CST WOODS CHAPEL RD E</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>IS 70 W</END_REF_PT2>
    <COUNTY>JACKSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>470</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT IS 70 W                                                                                          </START_PT>
    <END_PT>AT US 24 E                                                                                          </END_PT>
    <START_DATE>30-JUN-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>PAVEMENT STRIPING</WORK_TYPE>
    <WORK_HOURS>NIGHT</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>2000</START_TIME>
    <END_TIME>0600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT IS 70 W                                                                                          </BEG_REF_PT>
    <END_REF_PT>AT US 24 E                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>LEFT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>IS 70 W</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>US 24 E</END_REF_PT2>
    <COUNTY>JACKSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>55</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>1.49 MILES AFTER RT E E                                                                             </START_PT>
    <END_PT>AT US 61 N                                                                                          </END_PT>
    <START_DATE>30-JUN-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>PAVEMENT REPAIR OF CONCRETE PAVEMENT</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1400</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.49 MILES AFTER RT E E                                                                             </BEG_REF_PT>
    <END_REF_PT>AT US 61 N                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.49 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>RT E E</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>US 61 N</END_REF_PT2>
    <COUNTY>PEMISCOT</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>55</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>.23 MILES BEFORE RT TT S                                                                            </START_PT>
    <END_PT>AT RT TT S                                                                                          </END_PT>
    <START_DATE>04-MAY-09</START_DATE>
    <END_DATE>06-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.23 MILES BEFORE RT TT S                                                                            </BEG_REF_PT>
    <END_REF_PT>AT RT TT S                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>LEFT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.23 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>RT TT S</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>RT TT S</END_REF_PT2>
    <COUNTY>STE. GENEVIEVE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>55</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>.19 MILES BEFORE US 61 N                                                                            </START_PT>
    <END_PT>.01 MILES BEFORE US 61 N                                                                            </END_PT>
    <START_DATE>04-MAY-09</START_DATE>
    <END_DATE>06-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.19 MILES BEFORE US 61 N                                                                            </BEG_REF_PT>
    <END_REF_PT>.01 MILES BEFORE US 61 N                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>LEFT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.19 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>US 61 N</BEG_REF_PT2>
    <END_REF_PT1>.01 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>US 61 N</END_REF_PT2>
    <COUNTY>JEFFERSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>55</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>.4 MILES AFTER CRD IMPERIAL MAIN ST W                                                               </START_PT>
    <END_PT>LESS THAN .01 MILES BEFORE US 50 W                                                                  </END_PT>
    <START_DATE>12-MAY-09</START_DATE>
    <END_DATE>18-JUL-09</END_DATE>
    <WORK_TYPE>PAVEMENT STRIPING</WORK_TYPE>
    <WORK_HOURS>NIGHT</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>1900</START_TIME>
    <END_TIME>0500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.4 MILES AFTER CRD IMPERIAL MAIN ST W                                                               </BEG_REF_PT>
    <END_REF_PT>LESS THAN .01 MILES BEFORE US 50 W                                                                  </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.4 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>CRD IMPERIAL MAIN ST W</BEG_REF_PT2>
    <END_REF_PT1>LESS THAN .01 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>US 50 W</END_REF_PT2>
    <COUNTY>JEFFERSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>55</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>.4 MILES AFTER CRD IMPERIAL MAIN ST W                                                               </START_PT>
    <END_PT>LESS THAN .01 MILES BEFORE US 50 W                                                                  </END_PT>
    <START_DATE>12-MAY-09</START_DATE>
    <END_DATE>18-JUL-09</END_DATE>
    <WORK_TYPE>PAVEMENT STRIPING</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0900</START_TIME>
    <END_TIME>1300</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.4 MILES AFTER CRD IMPERIAL MAIN ST W                                                               </BEG_REF_PT>
    <END_REF_PT>LESS THAN .01 MILES BEFORE US 50 W                                                                  </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.4 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>CRD IMPERIAL MAIN ST W</BEG_REF_PT2>
    <END_REF_PT1>LESS THAN .01 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>US 50 W</END_REF_PT2>
    <COUNTY>JEFFERSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>55</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>.31 MILES AFTER US 67 N                                                                             </START_PT>
    <END_PT>AT CST GREEN PARK RD W                                                                              </END_PT>
    <START_DATE>02-JUL-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>SHOULDER WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0900</START_TIME>
    <END_TIME>1500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.31 MILES AFTER US 67 N                                                                             </BEG_REF_PT>
    <END_REF_PT>AT CST GREEN PARK RD W                                                                              </END_REF_PT>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.31 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>US 67 N</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>CST GREEN PARK RD W</END_REF_PT2>
    <COUNTY>ST. LOUIS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>55</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>.39 MILES BEFORE CST POTOMAC ST N                                                                   </START_PT>
    <END_PT>.03 MILES BEFORE IS 44 E                                                                            </END_PT>
    <START_DATE>10-JUN-09</START_DATE>
    <END_DATE>20-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>0700</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.39 MILES BEFORE CST POTOMAC ST N                                                                   </BEG_REF_PT>
    <END_REF_PT>.03 MILES BEFORE IS 44 E                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.39 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>CST POTOMAC ST N</BEG_REF_PT2>
    <END_REF_PT1>.03 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>IS 44 E</END_REF_PT2>
    <COUNTY>ST. LOUIS CITY</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>55</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>LESS THAN .01 MILES AFTER IS 44 E                                                                   </START_PT>
    <END_PT>.01 MILES AFTER CST WHARF ST S                                                                      </END_PT>
    <START_DATE>01-JUL-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0900</START_TIME>
    <END_TIME>1400</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>LESS THAN .01 MILES AFTER IS 44 E                                                                   </BEG_REF_PT>
    <END_REF_PT>.01 MILES AFTER CST WHARF ST S                                                                      </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>LESS THAN .01 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>IS 44 E</BEG_REF_PT2>
    <END_REF_PT1>.01 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>CST WHARF ST S</END_REF_PT2>
    <COUNTY>ST. LOUIS CITY</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>55</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>.05 MILES BEFORE CST LAFAYETTE AVE W                                                                </START_PT>
    <END_PT>.03 MILES BEFORE CST POTOMAC ST N                                                                   </END_PT>
    <START_DATE>11-JUN-09</START_DATE>
    <END_DATE>21-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>0700</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.05 MILES BEFORE CST LAFAYETTE AVE W                                                                </BEG_REF_PT>
    <END_REF_PT>.03 MILES BEFORE CST POTOMAC ST N                                                                   </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.05 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>CST LAFAYETTE AVE W</BEG_REF_PT2>
    <END_REF_PT1>.03 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>CST POTOMAC ST N</END_REF_PT2>
    <COUNTY>ST. LOUIS CITY</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>55</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>.01 MILES AFTER US 61 S                                                                             </START_PT>
    <END_PT>.19 MILES AFTER US 61 S                                                                             </END_PT>
    <START_DATE>04-MAY-09</START_DATE>
    <END_DATE>04-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.01 MILES AFTER US 61 S                                                                             </BEG_REF_PT>
    <END_REF_PT>.19 MILES AFTER US 61 S                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>LEFT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.01 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>US 61 S</BEG_REF_PT2>
    <END_REF_PT1>.19 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>US 61 S</END_REF_PT2>
    <COUNTY>JEFFERSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>55</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>AT RT TT S                                                                                          </START_PT>
    <END_PT>.22 MILES AFTER RT TT N                                                                             </END_PT>
    <START_DATE>04-MAY-09</START_DATE>
    <END_DATE>06-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT RT TT S                                                                                          </BEG_REF_PT>
    <END_REF_PT>.22 MILES AFTER RT TT N                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>LEFT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>RT TT S</BEG_REF_PT2>
    <END_REF_PT1>.22 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT TT N</END_REF_PT2>
    <COUNTY>JEFFERSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>57</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>AT US 60 W                                                                                          </START_PT>
    <END_PT>4.73 MILES AFTER RT J S                                                                             </END_PT>
    <START_DATE>08-JUN-09</START_DATE>
    <END_DATE>02-NOV-09</END_DATE>
    <WORK_TYPE>UNBONDED CONCRETE OVERLAY</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1900</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT US 60 W                                                                                          </BEG_REF_PT>
    <END_REF_PT>4.73 MILES AFTER RT J S                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>LEFT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>US 60 W</BEG_REF_PT2>
    <END_REF_PT1>4.73 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT J S</END_REF_PT2>
    <COUNTY>MISSISSIPPI</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>57</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>4.72 MILES BEFORE RT J N                                                                            </START_PT>
    <END_PT>.01 MILES BEFORE US 60 W                                                                            </END_PT>
    <START_DATE>08-JUN-09</START_DATE>
    <END_DATE>02-NOV-09</END_DATE>
    <WORK_TYPE>UNBONDED CONCRETE OVERLAY</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1900</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>4.72 MILES BEFORE RT J N                                                                            </BEG_REF_PT>
    <END_REF_PT>.01 MILES BEFORE US 60 W                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>LEFT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>4.72 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>RT J N</BEG_REF_PT2>
    <END_REF_PT1>.01 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>US 60 W</END_REF_PT2>
    <COUNTY>MISSISSIPPI</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>635</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>AT IS 29 S                                                                                          </START_PT>
    <END_PT>.34 MILES BEFORE MO 9 N                                                                             </END_PT>
    <START_DATE>06-JUN-09</START_DATE>
    <END_DATE>31-JUL-09</END_DATE>
    <WORK_TYPE>SHOULDER WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1800</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT IS 29 S                                                                                          </BEG_REF_PT>
    <END_REF_PT>.34 MILES BEFORE MO 9 N                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>IS 29 S</BEG_REF_PT2>
    <END_REF_PT1>.34 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>MO 9 N</END_REF_PT2>
    <COUNTY>PLATTE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>64</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT CST SPOEDE RD N                                                                                  </START_PT>
    <END_PT>AT CST CLAYTON RD E                                                                                 </END_PT>
    <START_DATE>29-JUN-09</START_DATE>
    <END_DATE>10-JUL-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0900</START_TIME>
    <END_TIME>1800</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT CST SPOEDE RD N                                                                                  </BEG_REF_PT>
    <END_REF_PT>AT CST CLAYTON RD E                                                                                 </END_REF_PT>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>CST SPOEDE RD N</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>CST CLAYTON RD E</END_REF_PT2>
    <COUNTY>ST. LOUIS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>64</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>.08 MILES AFTER CST TAYLOR AVE N                                                                    </START_PT>
    <END_PT>AT CST BRENTWOOD BLVD S                                                                             </END_PT>
    <START_DATE>13-DEC-08</START_DATE>
    <END_DATE>31-DEC-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>0500</END_TIME>
    <NUMBER_LANES_CLOSED>04</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.08 MILES AFTER CST TAYLOR AVE N                                                                    </BEG_REF_PT>
    <END_REF_PT>AT CST BRENTWOOD BLVD S                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>NONE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.08 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>CST TAYLOR AVE N</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>CST BRENTWOOD BLVD S</END_REF_PT2>
    <COUNTY>ST. LOUIS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>64</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT CST EWING AVE S                                                                                  </START_PT>
    <END_PT>AT CST 14TH ST N                                                                                    </END_PT>
    <START_DATE>30-JUN-09</START_DATE>
    <END_DATE>10-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>NIGHT</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>1900</START_TIME>
    <END_TIME>0500</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT CST EWING AVE S                                                                                  </BEG_REF_PT>
    <END_REF_PT>AT CST 14TH ST N                                                                                    </END_REF_PT>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>CST EWING AVE S</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>CST 14TH ST N</END_REF_PT2>
    <COUNTY>ST. LOUIS CITY</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>64</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>.16 MILES AFTER CST S GRAND AVE S                                                                   </START_PT>
    <END_PT>.08 MILES AFTER CST TAYLOR AVE S                                                                    </END_PT>
    <START_DATE>14-DEC-08</START_DATE>
    <END_DATE>31-DEC-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>1600</START_TIME>
    <END_TIME>0500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.16 MILES AFTER CST S GRAND AVE S                                                                   </BEG_REF_PT>
    <END_REF_PT>.08 MILES AFTER CST TAYLOR AVE S                                                                    </END_REF_PT>
    <CLOSURE_LOCATION>LEFT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.16 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>CST S GRAND AVE S</BEG_REF_PT2>
    <END_REF_PT1>.08 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>CST TAYLOR AVE S</END_REF_PT2>
    <COUNTY>ST. LOUIS CITY</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>64</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>.08 MILES AFTER CST TAYLOR AVE N                                                                    </START_PT>
    <END_PT>AT CST BRENTWOOD BLVD S                                                                             </END_PT>
    <START_DATE>13-DEC-08</START_DATE>
    <END_DATE>31-DEC-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>0500</END_TIME>
    <NUMBER_LANES_CLOSED>04</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.08 MILES AFTER CST TAYLOR AVE N                                                                    </BEG_REF_PT>
    <END_REF_PT>AT CST BRENTWOOD BLVD S                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>NONE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.08 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>CST TAYLOR AVE N</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>CST BRENTWOOD BLVD S</END_REF_PT2>
    <COUNTY>ST. LOUIS CITY</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>64</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>.04 MILES BEFORE IS 170 W                                                                           </START_PT>
    <END_PT>.36 MILES AFTER CST SPOEDE RD S                                                                     </END_PT>
    <START_DATE>01-JUN-09</START_DATE>
    <END_DATE>10-JUL-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>NIGHT</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>1800</START_TIME>
    <END_TIME>0600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.04 MILES BEFORE IS 170 W                                                                           </BEG_REF_PT>
    <END_REF_PT>.36 MILES AFTER CST SPOEDE RD S                                                                     </END_REF_PT>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.04 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>IS 170 W</BEG_REF_PT2>
    <END_REF_PT1>.36 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>CST SPOEDE RD S</END_REF_PT2>
    <COUNTY>ST. LOUIS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>70</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>.15 MILES AFTER CST PROSPECT AVE N                                                                  </START_PT>
    <END_PT>.31 MILES AFTER CST JACKSON AVE S                                                                   </END_PT>
    <START_DATE>30-JUN-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>SCRUB SEALING</WORK_TYPE>
    <WORK_HOURS>NIGHT</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>2100</START_TIME>
    <END_TIME>0400</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.15 MILES AFTER CST PROSPECT AVE N                                                                  </BEG_REF_PT>
    <END_REF_PT>.31 MILES AFTER CST JACKSON AVE S                                                                   </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.15 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>CST PROSPECT AVE N</BEG_REF_PT2>
    <END_REF_PT1>.31 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>CST JACKSON AVE S</END_REF_PT2>
    <COUNTY>JACKSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>70</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>1 MILE AFTER RT F N                                                                                 </START_PT>
    <END_PT>1.26 MILES AFTER MO 131 N                                                                           </END_PT>
    <START_DATE>15-JUN-09</START_DATE>
    <END_DATE>16-SEP-09</END_DATE>
    <WORK_TYPE>MILLING AND RESURFACING ASPHALT PAVEMENT</WORK_TYPE>
    <WORK_HOURS>NIGHT</WORK_HOURS>
    <WEEKEND>SATURDAY</WEEKEND>
    <START_TIME>2100</START_TIME>
    <END_TIME>0900</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1 MILE AFTER RT F N                                                                                 </BEG_REF_PT>
    <END_REF_PT>1.26 MILES AFTER MO 131 N                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1 MILE AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>RT F N</BEG_REF_PT2>
    <END_REF_PT1>1.26 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>MO 131 N</END_REF_PT2>
    <COUNTY>LAFAYETTE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>70</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>1.16 MILES AFTER RT F N                                                                             </START_PT>
    <END_PT>1.26 MILES AFTER MO 131 N                                                                           </END_PT>
    <START_DATE>15-JUN-09</START_DATE>
    <END_DATE>16-SEP-09</END_DATE>
    <WORK_TYPE>MILLING AND RESURFACING ASPHALT PAVEMENT</WORK_TYPE>
    <WORK_HOURS>NIGHT</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>2000</START_TIME>
    <END_TIME>0500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.16 MILES AFTER RT F N                                                                             </BEG_REF_PT>
    <END_REF_PT>1.26 MILES AFTER MO 131 N                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.16 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>RT F N</BEG_REF_PT2>
    <END_REF_PT1>1.26 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>MO 131 N</END_REF_PT2>
    <COUNTY>LAFAYETTE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>70</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>.01 MILES BEFORE RT UU E                                                                            </START_PT>
    <END_PT>.94 MILES AFTER CRD ST CHARLES RD E                                                                 </END_PT>
    <START_DATE>14-JUN-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>PAVEMENT REPAIR OF CONCRETE PAVEMENT</WORK_TYPE>
    <WORK_HOURS>NIGHT</WORK_HOURS>
    <WEEKEND>SUNDAY</WEEKEND>
    <START_TIME>1900</START_TIME>
    <END_TIME>0600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.01 MILES BEFORE RT UU E                                                                            </BEG_REF_PT>
    <END_REF_PT>.94 MILES AFTER CRD ST CHARLES RD E                                                                 </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.01 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>RT UU E</BEG_REF_PT2>
    <END_REF_PT1>.94 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>CRD ST CHARLES RD E</END_REF_PT2>
    <COUNTY>BOONE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>70</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>.36 MILES BEFORE RT J N                                                                             </START_PT>
    <END_PT>.04 MILES AFTER RT J S                                                                              </END_PT>
    <START_DATE>22-JUN-09</START_DATE>
    <END_DATE>16-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>0700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.36 MILES BEFORE RT J N                                                                             </BEG_REF_PT>
    <END_REF_PT>.04 MILES AFTER RT J S                                                                              </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.36 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>RT J N</BEG_REF_PT2>
    <END_REF_PT1>.04 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT J S</END_REF_PT2>
    <COUNTY>CALLAWAY</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>70</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>3.35 MILES BEFORE RT A N                                                                            </START_PT>
    <END_PT>3.34 MILES BEFORE RT A N                                                                            </END_PT>
    <START_DATE>04-JUN-09</START_DATE>
    <END_DATE>01-AUG-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>3.35 MILES BEFORE RT A N                                                                            </BEG_REF_PT>
    <END_REF_PT>3.34 MILES BEFORE RT A N                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>3.35 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>RT A N</BEG_REF_PT2>
    <END_REF_PT1>3.34 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>RT A N</END_REF_PT2>
    <COUNTY>CALLAWAY</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>70</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>3.34 MILES AFTER RT A S                                                                             </START_PT>
    <END_PT>3.36 MILES AFTER RT A S                                                                             </END_PT>
    <START_DATE>04-JUN-09</START_DATE>
    <END_DATE>01-AUG-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>3.34 MILES AFTER RT A S                                                                             </BEG_REF_PT>
    <END_REF_PT>3.36 MILES AFTER RT A S                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>3.34 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>RT A S</BEG_REF_PT2>
    <END_REF_PT1>3.36 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT A S</END_REF_PT2>
    <COUNTY>CALLAWAY</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>70</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>.04 MILES BEFORE RT J N                                                                             </START_PT>
    <END_PT>.36 MILES AFTER RT DD N                                                                             </END_PT>
    <START_DATE>22-JUN-09</START_DATE>
    <END_DATE>16-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>0700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.04 MILES BEFORE RT J N                                                                             </BEG_REF_PT>
    <END_REF_PT>.36 MILES AFTER RT DD N                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.04 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>RT J N</BEG_REF_PT2>
    <END_REF_PT1>.36 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT DD N</END_REF_PT2>
    <COUNTY>CALLAWAY</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>70</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>.94 MILES BEFORE CRD ST CHARLES RD W                                                                </START_PT>
    <END_PT>AT RT UU E                                                                                          </END_PT>
    <START_DATE>14-JUN-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>PAVEMENT REPAIR OF CONCRETE PAVEMENT</WORK_TYPE>
    <WORK_HOURS>NIGHT</WORK_HOURS>
    <WEEKEND>SUNDAY</WEEKEND>
    <START_TIME>1900</START_TIME>
    <END_TIME>0600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.94 MILES BEFORE CRD ST CHARLES RD W                                                                </BEG_REF_PT>
    <END_REF_PT>AT RT UU E                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.94 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>CRD ST CHARLES RD W</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>RT UU E</END_REF_PT2>
    <COUNTY>BOONE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>70</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>.94 MILES BEFORE RT B S                                                                             </START_PT>
    <END_PT>2.1 MILES BEFORE RT J N                                                                             </END_PT>
    <START_DATE>08-JUN-09</START_DATE>
    <END_DATE>30-SEP-09</END_DATE>
    <WORK_TYPE>MILLING AND RESURFACING ASPHALT PAVEMENT</WORK_TYPE>
    <WORK_HOURS>NIGHT</WORK_HOURS>
    <WEEKEND>SATURDAY</WEEKEND>
    <START_TIME>1800</START_TIME>
    <END_TIME>0700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.94 MILES BEFORE RT B S                                                                             </BEG_REF_PT>
    <END_REF_PT>2.1 MILES BEFORE RT J N                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.94 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>RT B S</BEG_REF_PT2>
    <END_REF_PT1>2.1 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>RT J N</END_REF_PT2>
    <COUNTY>COOPER</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>70</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>1.26 MILES BEFORE MO 131 S                                                                          </START_PT>
    <END_PT>1.18 MILES BEFORE RT F S                                                                            </END_PT>
    <START_DATE>15-JUN-09</START_DATE>
    <END_DATE>16-SEP-09</END_DATE>
    <WORK_TYPE>MILLING AND RESURFACING ASPHALT PAVEMENT</WORK_TYPE>
    <WORK_HOURS>NIGHT</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>1700</START_TIME>
    <END_TIME>0500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.26 MILES BEFORE MO 131 S                                                                          </BEG_REF_PT>
    <END_REF_PT>1.18 MILES BEFORE RT F S                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.26 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>MO 131 S</BEG_REF_PT2>
    <END_REF_PT1>1.18 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>RT F S</END_REF_PT2>
    <COUNTY>LAFAYETTE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>70</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>1.26 MILES BEFORE MO 131 S                                                                          </START_PT>
    <END_PT>1.18 MILES BEFORE RT F S                                                                            </END_PT>
    <START_DATE>15-JUN-09</START_DATE>
    <END_DATE>16-SEP-09</END_DATE>
    <WORK_TYPE>MILLING AND RESURFACING ASPHALT PAVEMENT</WORK_TYPE>
    <WORK_HOURS>NIGHT</WORK_HOURS>
    <WEEKEND>SATURDAY</WEEKEND>
    <START_TIME>2100</START_TIME>
    <END_TIME>0900</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.26 MILES BEFORE MO 131 S                                                                          </BEG_REF_PT>
    <END_REF_PT>1.18 MILES BEFORE RT F S                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.26 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>MO 131 S</BEG_REF_PT2>
    <END_REF_PT1>1.18 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>RT F S</END_REF_PT2>
    <COUNTY>LAFAYETTE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>70</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>1 MILE BEFORE RT F S                                                                                </START_PT>
    <END_PT>AT US 24 W                                                                                          </END_PT>
    <START_DATE>28-JUN-09</START_DATE>
    <END_DATE>09-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>NIGHT</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>2000</START_TIME>
    <END_TIME>0400</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1 MILE BEFORE RT F S                                                                                </BEG_REF_PT>
    <END_REF_PT>AT US 24 W                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1 MILE BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>RT F S</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>US 24 W</END_REF_PT2>
    <COUNTY>JACKSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>100</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>1.52 MILES BEFORE RT N N                                                                            </START_PT>
    <END_PT>2.5 MILES AFTER MO 19 N                                                                             </END_PT>
    <START_DATE>17-JUN-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>SHOULDER WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0800</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.52 MILES BEFORE RT N N                                                                            </BEG_REF_PT>
    <END_REF_PT>2.5 MILES AFTER MO 19 N                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.52 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>RT N N</BEG_REF_PT2>
    <END_REF_PT1>2.5 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>MO 19 N</END_REF_PT2>
    <COUNTY>GASCONADE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>100</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>2.5 MILES BEFORE MO 19 N                                                                            </START_PT>
    <END_PT>1.52 MILES AFTER RT N S                                                                             </END_PT>
    <START_DATE>17-JUN-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>SHOULDER WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0800</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>2.5 MILES BEFORE MO 19 N                                                                            </BEG_REF_PT>
    <END_REF_PT>1.52 MILES AFTER RT N S                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>2.5 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>MO 19 N</BEG_REF_PT2>
    <END_REF_PT1>1.52 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT N S</END_REF_PT2>
    <COUNTY>GASCONADE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>11</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>AT MO 11 S                                                                                          </START_PT>
    <END_PT>AT RT C W                                                                                           </END_PT>
    <START_DATE>25-JUN-09</START_DATE>
    <END_DATE>10-JUL-09</END_DATE>
    <WORK_TYPE>MILLING AND RESURFACING ASPHALT PAVEMENT</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1800</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT MO 11 S                                                                                          </BEG_REF_PT>
    <END_REF_PT>AT RT C W                                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>MO 11 S</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>RT C W</END_REF_PT2>
    <COUNTY>LINN</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>126</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT US 71 N                                                                                          </START_PT>
    <END_PT>AT RT T S                                                                                           </END_PT>
    <START_DATE>22-JUN-09</START_DATE>
    <END_DATE>01-DEC-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0100</START_TIME>
    <END_TIME>2400</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT US 71 N                                                                                          </BEG_REF_PT>
    <END_REF_PT>AT RT T S                                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>US 71 N</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>RT T S</END_REF_PT2>
    <COUNTY>BARTON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>126</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>AT RT T S                                                                                           </START_PT>
    <END_PT>AT US 71 N                                                                                          </END_PT>
    <START_DATE>22-JUN-09</START_DATE>
    <END_DATE>01-DEC-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0100</START_TIME>
    <END_TIME>2400</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT RT T S                                                                                           </BEG_REF_PT>
    <END_REF_PT>AT US 71 N                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>RT T S</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>US 71 N</END_REF_PT2>
    <COUNTY>BARTON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>129</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>AT RT C W                                                                                           </START_PT>
    <END_PT>AT MO 11 S                                                                                          </END_PT>
    <START_DATE>25-JUN-09</START_DATE>
    <END_DATE>10-JUL-09</END_DATE>
    <WORK_TYPE>MILLING AND RESURFACING ASPHALT PAVEMENT</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1800</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT RT C W                                                                                           </BEG_REF_PT>
    <END_REF_PT>AT MO 11 S                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>RT C W</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>MO 11 S</END_REF_PT2>
    <COUNTY>SULLIVAN</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>13</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>AT MO 744 E                                                                                         </START_PT>
    <END_PT>AT OR 44 W                                                                                          </END_PT>
    <START_DATE>23-JUN-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>SATURDAY</WEEKEND>
    <START_TIME>0900</START_TIME>
    <END_TIME>2000</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT MO 744 E                                                                                         </BEG_REF_PT>
    <END_REF_PT>AT OR 44 W                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>MO 744 E</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>OR 44 W</END_REF_PT2>
    <COUNTY>GREENE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>13</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>AT MO 10 E                                                                                          </START_PT>
    <END_PT>.26 MILES BEFORE US 24 W                                                                            </END_PT>
    <START_DATE>23-JUN-09</START_DATE>
    <END_DATE>03-JUL-09</END_DATE>
    <WORK_TYPE>PAVEMENT STRIPING</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0100</START_TIME>
    <END_TIME>2400</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT MO 10 E                                                                                          </BEG_REF_PT>
    <END_REF_PT>.26 MILES BEFORE US 24 W                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>MO 10 E</BEG_REF_PT2>
    <END_REF_PT1>.26 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>US 24 W</END_REF_PT2>
    <COUNTY>RAY</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>13</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>AT OR 44 W                                                                                          </START_PT>
    <END_PT>LESS THAN .01 MILES BEFORE MO 744 E                                                                 </END_PT>
    <START_DATE>23-JUN-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>SATURDAY</WEEKEND>
    <START_TIME>0900</START_TIME>
    <END_TIME>2000</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT OR 44 W                                                                                          </BEG_REF_PT>
    <END_REF_PT>LESS THAN .01 MILES BEFORE MO 744 E                                                                 </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>OR 44 W</BEG_REF_PT2>
    <END_REF_PT1>LESS THAN .01 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>MO 744 E</END_REF_PT2>
    <COUNTY>GREENE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>13</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>AT OR 44 W                                                                                          </START_PT>
    <END_PT>.1 MILES AFTER IS 44 E                                                                              </END_PT>
    <START_DATE>12-JAN-09</START_DATE>
    <END_DATE>10-JUL-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>SATURDAY</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1900</END_TIME>
    <NUMBER_LANES_CLOSED>00</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT OR 44 W                                                                                          </BEG_REF_PT>
    <END_REF_PT>.1 MILES AFTER IS 44 E                                                                              </END_REF_PT>
    <CLOSURE_LOCATION>NONE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>OR 44 W</BEG_REF_PT2>
    <END_REF_PT1>.1 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>IS 44 E</END_REF_PT2>
    <COUNTY>GREENE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>131</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>4.51 MILES AFTER US 50 E                                                                            </START_PT>
    <END_PT>2.67 MILES BEFORE MO 58 E                                                                           </END_PT>
    <START_DATE>30-JUN-09</START_DATE>
    <END_DATE>10-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>4.51 MILES AFTER US 50 E                                                                            </BEG_REF_PT>
    <END_REF_PT>2.67 MILES BEFORE MO 58 E                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>4.51 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>US 50 E</BEG_REF_PT2>
    <END_REF_PT1>2.67 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>MO 58 E</END_REF_PT2>
    <COUNTY>JOHNSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>131</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>2.99 MILES BEFORE MO 58 E                                                                           </START_PT>
    <END_PT>.99 MILES BEFORE MO 58 E                                                                            </END_PT>
    <START_DATE>30-JUN-09</START_DATE>
    <END_DATE>23-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0800</START_TIME>
    <END_TIME>1500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>2.99 MILES BEFORE MO 58 E                                                                           </BEG_REF_PT>
    <END_REF_PT>.99 MILES BEFORE MO 58 E                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>2.99 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>MO 58 E</BEG_REF_PT2>
    <END_REF_PT1>.99 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>MO 58 E</END_REF_PT2>
    <COUNTY>JOHNSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>141</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>AT MO 30 W                                                                                          </START_PT>
    <END_PT>.3 MILES BEFORE CST OLD WOODS MILL RD S                                                             </END_PT>
    <START_DATE>10-JUN-09</START_DATE>
    <END_DATE>18-JUL-09</END_DATE>
    <WORK_TYPE>PAVEMENT STRIPING</WORK_TYPE>
    <WORK_HOURS>NIGHT</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>1900</START_TIME>
    <END_TIME>0500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT MO 30 W                                                                                          </BEG_REF_PT>
    <END_REF_PT>.3 MILES BEFORE CST OLD WOODS MILL RD S                                                             </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>MO 30 W</BEG_REF_PT2>
    <END_REF_PT1>.3 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>CST OLD WOODS MILL RD S</END_REF_PT2>
    <COUNTY>ST. LOUIS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>141</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>AT MO 30 W                                                                                          </START_PT>
    <END_PT>.3 MILES BEFORE CST OLD WOODS MILL RD S                                                             </END_PT>
    <START_DATE>11-JUN-09</START_DATE>
    <END_DATE>18-JUL-09</END_DATE>
    <WORK_TYPE>PAVEMENT STRIPING</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0900</START_TIME>
    <END_TIME>1500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT MO 30 W                                                                                          </BEG_REF_PT>
    <END_REF_PT>.3 MILES BEFORE CST OLD WOODS MILL RD S                                                             </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>MO 30 W</BEG_REF_PT2>
    <END_REF_PT1>.3 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>CST OLD WOODS MILL RD S</END_REF_PT2>
    <COUNTY>ST. LOUIS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>141</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>.3 MILES AFTER CST OLD WOODS MILL RD N                                                              </START_PT>
    <END_PT>LESS THAN .01 MILES AFTER MO 30 W                                                                   </END_PT>
    <START_DATE>11-JUN-09</START_DATE>
    <END_DATE>18-JUL-09</END_DATE>
    <WORK_TYPE>PAVEMENT STRIPING</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0900</START_TIME>
    <END_TIME>1500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.3 MILES AFTER CST OLD WOODS MILL RD N                                                              </BEG_REF_PT>
    <END_REF_PT>LESS THAN .01 MILES AFTER MO 30 W                                                                   </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.3 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>CST OLD WOODS MILL RD N</BEG_REF_PT2>
    <END_REF_PT1>LESS THAN .01 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>MO 30 W</END_REF_PT2>
    <COUNTY>ST. LOUIS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>150</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT OR 71 N                                                                                          </START_PT>
    <END_PT>.3 MILES BEFORE CST BYARS RD N                                                                      </END_PT>
    <START_DATE>18-JUN-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>TRAFFIC CONTROL SIGNING OR LIGHT SIGNALS</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0900</START_TIME>
    <END_TIME>1500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT OR 71 N                                                                                          </BEG_REF_PT>
    <END_REF_PT>.3 MILES BEFORE CST BYARS RD N                                                                      </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>OR 71 N</BEG_REF_PT2>
    <END_REF_PT1>.3 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>CST BYARS RD N</END_REF_PT2>
    <COUNTY>JACKSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>150</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>.27 MILES AFTER CST BYARS RD S                                                                      </START_PT>
    <END_PT>AT OR 71 S                                                                                          </END_PT>
    <START_DATE>18-JUN-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>TRAFFIC CONTROL SIGNING OR LIGHT SIGNALS</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0900</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.27 MILES AFTER CST BYARS RD S                                                                      </BEG_REF_PT>
    <END_REF_PT>AT OR 71 S                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.27 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>CST BYARS RD S</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>OR 71 S</END_REF_PT2>
    <COUNTY>JACKSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>156</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>3.6 MILES AFTER MO 149 N                                                                            </START_PT>
    <END_PT>4 MILES AFTER MO 149 N                                                                              </END_PT>
    <START_DATE>18-MAY-09</START_DATE>
    <END_DATE>14-AUG-09</END_DATE>
    <WORK_TYPE>PATCHING OF ASPHALT PAVEMENT</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>2400</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>3.6 MILES AFTER MO 149 N                                                                            </BEG_REF_PT>
    <END_REF_PT>4 MILES AFTER MO 149 N                                                                              </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>3.6 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>MO 149 N</BEG_REF_PT2>
    <END_REF_PT1>4 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>MO 149 N</END_REF_PT2>
    <COUNTY>MACON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>156</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>4 MILES BEFORE MO 149 S                                                                             </START_PT>
    <END_PT>3.6 MILES BEFORE MO 149 S                                                                           </END_PT>
    <START_DATE>18-MAY-09</START_DATE>
    <END_DATE>14-AUG-09</END_DATE>
    <WORK_TYPE>PATCHING OF ASPHALT PAVEMENT</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>2400</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>4 MILES BEFORE MO 149 S                                                                             </BEG_REF_PT>
    <END_REF_PT>3.6 MILES BEFORE MO 149 S                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>4 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>MO 149 S</BEG_REF_PT2>
    <END_REF_PT1>3.6 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>MO 149 S</END_REF_PT2>
    <COUNTY>MACON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>163</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>AT RT AC E                                                                                          </START_PT>
    <END_PT>AT CST GREEN MEADOWS RD E                                                                           </END_PT>
    <START_DATE>09-MAR-09</START_DATE>
    <END_DATE>31-AUG-09</END_DATE>
    <WORK_TYPE>SHOULDER WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>2000</END_TIME>
    <NUMBER_LANES_CLOSED>00</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT RT AC E                                                                                          </BEG_REF_PT>
    <END_REF_PT>AT CST GREEN MEADOWS RD E                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>NONE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>RT AC E</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>CST GREEN MEADOWS RD E</END_REF_PT2>
    <COUNTY>BOONE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>163</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>.19 MILES BEFORE CST PROVIDENCE POINT DR E                                                          </START_PT>
    <END_PT>AT CST STADIUM BLVD W                                                                               </END_PT>
    <START_DATE>18-MAY-09</START_DATE>
    <END_DATE>03-JUL-09</END_DATE>
    <WORK_TYPE>MEDIAN OR SHOULDER WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>2000</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.19 MILES BEFORE CST PROVIDENCE POINT DR E                                                          </BEG_REF_PT>
    <END_REF_PT>AT CST STADIUM BLVD W                                                                               </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.19 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>CST PROVIDENCE POINT DR E</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>CST STADIUM BLVD W</END_REF_PT2>
    <COUNTY>BOONE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>163</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>AT CST STADIUM BLVD W                                                                               </START_PT>
    <END_PT>.19 MILES AFTER CST PROVIDENCE POINT DR W                                                           </END_PT>
    <START_DATE>18-MAY-09</START_DATE>
    <END_DATE>03-JUL-09</END_DATE>
    <WORK_TYPE>MEDIAN OR SHOULDER WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>2000</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT CST STADIUM BLVD W                                                                               </BEG_REF_PT>
    <END_REF_PT>.19 MILES AFTER CST PROVIDENCE POINT DR W                                                           </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>CST STADIUM BLVD W</BEG_REF_PT2>
    <END_REF_PT1>.19 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>CST PROVIDENCE POINT DR W</END_REF_PT2>
    <COUNTY>BOONE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>17</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>1.14 MILES BEFORE MO 142 W                                                                          </START_PT>
    <END_PT>7.85 MILES AFTER MO 142 E                                                                           </END_PT>
    <START_DATE>22-JUN-09</START_DATE>
    <END_DATE>06-JUL-09</END_DATE>
    <WORK_TYPE>SHOULDER WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0800</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.14 MILES BEFORE MO 142 W                                                                          </BEG_REF_PT>
    <END_REF_PT>7.85 MILES AFTER MO 142 E                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.14 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>MO 142 W</BEG_REF_PT2>
    <END_REF_PT1>7.85 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>MO 142 E</END_REF_PT2>
    <COUNTY>HOWELL</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>17</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>2.7 MILES AFTER LP 44 E                                                                             </START_PT>
    <END_PT>2.72 MILES AFTER LP 44 E                                                                            </END_PT>
    <START_DATE>18-MAY-09</START_DATE>
    <END_DATE>15-DEC-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1900</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>2.7 MILES AFTER LP 44 E                                                                             </BEG_REF_PT>
    <END_REF_PT>2.72 MILES AFTER LP 44 E                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>2.7 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>LP 44 E</BEG_REF_PT2>
    <END_REF_PT1>2.72 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>LP 44 E</END_REF_PT2>
    <COUNTY>PULASKI</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>17</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>.74 MILES AFTER MO 133 N                                                                            </START_PT>
    <END_PT>.05 MILES BEFORE RT U N                                                                             </END_PT>
    <START_DATE>30-DEC-08</START_DATE>
    <END_DATE>31-DEC-09</END_DATE>
    <WORK_TYPE>SHOULDER WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.74 MILES AFTER MO 133 N                                                                            </BEG_REF_PT>
    <END_REF_PT>.05 MILES BEFORE RT U N                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.74 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>MO 133 N</BEG_REF_PT2>
    <END_REF_PT1>.05 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>RT U N</END_REF_PT2>
    <COUNTY>PULASKI</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>17</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>3.82 MILES BEFORE RT C S                                                                            </START_PT>
    <END_PT>AT US 54 E                                                                                          </END_PT>
    <START_DATE>15-JUN-09</START_DATE>
    <END_DATE>10-JUL-09</END_DATE>
    <WORK_TYPE>RESURFACING WITH HOT-MIX ASPHALT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1900</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>3.82 MILES BEFORE RT C S                                                                            </BEG_REF_PT>
    <END_REF_PT>AT US 54 E                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>3.82 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>RT C S</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>US 54 E</END_REF_PT2>
    <COUNTY>MILLER</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>17</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>.39 MILES AFTER MO 52 W                                                                             </START_PT>
    <END_PT>.42 MILES AFTER MO 52 W                                                                             </END_PT>
    <START_DATE>06-APR-09</START_DATE>
    <END_DATE>28-MAY-10</END_DATE>
    <WORK_TYPE>SHOULDER WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1800</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.39 MILES AFTER MO 52 W                                                                             </BEG_REF_PT>
    <END_REF_PT>.42 MILES AFTER MO 52 W                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.39 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>MO 52 W</BEG_REF_PT2>
    <END_REF_PT1>.42 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>MO 52 W</END_REF_PT2>
    <COUNTY>MILLER</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>17</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>AT US 54 E                                                                                          </START_PT>
    <END_PT>3.82 MILES AFTER RT C N                                                                             </END_PT>
    <START_DATE>15-JUN-09</START_DATE>
    <END_DATE>10-JUL-09</END_DATE>
    <WORK_TYPE>RESURFACING WITH HOT-MIX ASPHALT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1900</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT US 54 E                                                                                          </BEG_REF_PT>
    <END_REF_PT>3.82 MILES AFTER RT C N                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>US 54 E</BEG_REF_PT2>
    <END_REF_PT1>3.82 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT C N</END_REF_PT2>
    <COUNTY>COLE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>17</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>.42 MILES BEFORE MO 17 N                                                                            </START_PT>
    <END_PT>.39 MILES BEFORE MO 17 N                                                                            </END_PT>
    <START_DATE>06-APR-09</START_DATE>
    <END_DATE>28-MAY-10</END_DATE>
    <WORK_TYPE>SHOULDER WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1800</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.42 MILES BEFORE MO 17 N                                                                            </BEG_REF_PT>
    <END_REF_PT>.39 MILES BEFORE MO 17 N                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.42 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>MO 17 N</BEG_REF_PT2>
    <END_REF_PT1>.39 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>MO 17 N</END_REF_PT2>
    <COUNTY>MILLER</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>17</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>2.72 MILES BEFORE LP 44 W                                                                           </START_PT>
    <END_PT>2.7 MILES BEFORE LP 44 W                                                                            </END_PT>
    <START_DATE>18-MAY-09</START_DATE>
    <END_DATE>15-DEC-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1900</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>2.72 MILES BEFORE LP 44 W                                                                           </BEG_REF_PT>
    <END_REF_PT>2.7 MILES BEFORE LP 44 W                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>2.72 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>LP 44 W</BEG_REF_PT2>
    <END_REF_PT1>2.7 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>LP 44 W</END_REF_PT2>
    <COUNTY>PULASKI</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>17</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>7.85 MILES BEFORE MO 142 W                                                                          </START_PT>
    <END_PT>1.14 MILES AFTER MO 142 E                                                                           </END_PT>
    <START_DATE>22-JUN-09</START_DATE>
    <END_DATE>06-JUL-09</END_DATE>
    <WORK_TYPE>SHOULDER WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0800</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>7.85 MILES BEFORE MO 142 W                                                                          </BEG_REF_PT>
    <END_REF_PT>1.14 MILES AFTER MO 142 E                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>7.85 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>MO 142 W</BEG_REF_PT2>
    <END_REF_PT1>1.14 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>MO 142 E</END_REF_PT2>
    <COUNTY>HOWELL</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>179</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>2.86 MILES AFTER RT N E                                                                             </START_PT>
    <END_PT>4.61 MILES AFTER MO 87 N                                                                            </END_PT>
    <START_DATE>29-JUN-09</START_DATE>
    <END_DATE>17-JUL-09</END_DATE>
    <WORK_TYPE>PAVEMENT REPAIR OF CONCRETE PAVEMENT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0800</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>2.86 MILES AFTER RT N E                                                                             </BEG_REF_PT>
    <END_REF_PT>4.61 MILES AFTER MO 87 N                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>2.86 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>RT N E</BEG_REF_PT2>
    <END_REF_PT1>4.61 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>MO 87 N</END_REF_PT2>
    <COUNTY>MONITEAU</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>179</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>4.61 MILES BEFORE MO 87 S                                                                           </START_PT>
    <END_PT>2.86 MILES BEFORE RT N W                                                                            </END_PT>
    <START_DATE>29-JUN-09</START_DATE>
    <END_DATE>17-JUL-09</END_DATE>
    <WORK_TYPE>PAVEMENT REPAIR OF CONCRETE PAVEMENT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0800</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>4.61 MILES BEFORE MO 87 S                                                                           </BEG_REF_PT>
    <END_REF_PT>2.86 MILES BEFORE RT N W                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>4.61 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>MO 87 S</BEG_REF_PT2>
    <END_REF_PT1>2.86 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>RT N W</END_REF_PT2>
    <COUNTY>MONITEAU</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>185</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>.61 MILES AFTER RT N E                                                                              </START_PT>
    <END_PT>.65 MILES AFTER RT N E                                                                              </END_PT>
    <START_DATE>01-JUN-09</START_DATE>
    <END_DATE>17-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.61 MILES AFTER RT N E                                                                              </BEG_REF_PT>
    <END_REF_PT>.65 MILES AFTER RT N E                                                                              </END_REF_PT>
    <CLOSURE_LOCATION>MIDDLE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.61 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>RT N E</BEG_REF_PT2>
    <END_REF_PT1>.65 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT N E</END_REF_PT2>
    <COUNTY>WASHINGTON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>185</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>.61 MILES AFTER RT N E                                                                              </START_PT>
    <END_PT>.65 MILES AFTER RT N E                                                                              </END_PT>
    <START_DATE>01-JUN-09</START_DATE>
    <END_DATE>17-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.61 MILES AFTER RT N E                                                                              </BEG_REF_PT>
    <END_REF_PT>.65 MILES AFTER RT N E                                                                              </END_REF_PT>
    <CLOSURE_LOCATION>MIDDLE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.61 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>RT N E</BEG_REF_PT2>
    <END_REF_PT1>.65 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT N E</END_REF_PT2>
    <COUNTY>WASHINGTON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>19</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>AT RT DD S                                                                                          </START_PT>
    <END_PT>AT RT F N                                                                                           </END_PT>
    <START_DATE>15-JUN-09</START_DATE>
    <END_DATE>01-SEP-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1900</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT RT DD S                                                                                          </BEG_REF_PT>
    <END_REF_PT>AT RT F N                                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>RT DD S</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>RT F N</END_REF_PT2>
    <COUNTY>CRAWFORD</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>19</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>AT RT F N                                                                                           </START_PT>
    <END_PT>AT RT DD S                                                                                          </END_PT>
    <START_DATE>15-JUN-09</START_DATE>
    <END_DATE>01-SEP-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1900</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT RT F N                                                                                           </BEG_REF_PT>
    <END_REF_PT>AT RT DD S                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>RT F N</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>RT DD S</END_REF_PT2>
    <COUNTY>CRAWFORD</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>21</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>AT MO 47 N                                                                                          </START_PT>
    <END_PT>AT MO 104 E                                                                                         </END_PT>
    <START_DATE>08-JUN-09</START_DATE>
    <END_DATE>03-AUG-09</END_DATE>
    <WORK_TYPE>RESURFACING WITH HOT-MIX ASPHALT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>2000</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT MO 47 N                                                                                          </BEG_REF_PT>
    <END_REF_PT>AT MO 104 E                                                                                         </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>MO 47 N</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>MO 104 E</END_REF_PT2>
    <COUNTY>WASHINGTON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>21</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>.21 MILES AFTER MO 141 N                                                                            </START_PT>
    <END_PT>.54 MILES AFTER MO 141 N                                                                            </END_PT>
    <START_DATE>27-MAY-09</START_DATE>
    <END_DATE>29-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0900</START_TIME>
    <END_TIME>1500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.21 MILES AFTER MO 141 N                                                                            </BEG_REF_PT>
    <END_REF_PT>.54 MILES AFTER MO 141 N                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.21 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>MO 141 N</BEG_REF_PT2>
    <END_REF_PT1>.54 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>MO 141 N</END_REF_PT2>
    <COUNTY>JEFFERSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>21</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>.76 MILES AFTER CRD HAGEMANN DR N                                                                   </START_PT>
    <END_PT>.23 MILES BEFORE MO 141 N                                                                           </END_PT>
    <START_DATE>27-MAY-09</START_DATE>
    <END_DATE>29-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0900</START_TIME>
    <END_TIME>1500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.76 MILES AFTER CRD HAGEMANN DR N                                                                   </BEG_REF_PT>
    <END_REF_PT>.23 MILES BEFORE MO 141 N                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>LEFT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.76 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>CRD HAGEMANN DR N</BEG_REF_PT2>
    <END_REF_PT1>.23 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>MO 141 N</END_REF_PT2>
    <COUNTY>ST. LOUIS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>21</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>AT MO 141 N                                                                                         </START_PT>
    <END_PT>AT CRD OLD HWY 21 S                                                                                 </END_PT>
    <START_DATE>29-JUN-09</START_DATE>
    <END_DATE>30-JUL-09</END_DATE>
    <WORK_TYPE>ROADSIDE MAINTENANCE</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1800</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT MO 141 N                                                                                         </BEG_REF_PT>
    <END_REF_PT>AT CRD OLD HWY 21 S                                                                                 </END_REF_PT>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>MO 141 N</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>CRD OLD HWY 21 S</END_REF_PT2>
    <COUNTY>JEFFERSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>21</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>1.68 MILES BEFORE RT A E                                                                            </START_PT>
    <END_PT>.91 MILES BEFORE RT A E                                                                             </END_PT>
    <START_DATE>02-JUL-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>SHOULDER WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.68 MILES BEFORE RT A E                                                                            </BEG_REF_PT>
    <END_REF_PT>.91 MILES BEFORE RT A E                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.68 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>RT A E</BEG_REF_PT2>
    <END_REF_PT1>.91 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>RT A E</END_REF_PT2>
    <COUNTY>JEFFERSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>21</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>AT MO 104 E                                                                                         </START_PT>
    <END_PT>AT MO 47 N                                                                                          </END_PT>
    <START_DATE>08-JUN-09</START_DATE>
    <END_DATE>03-AUG-09</END_DATE>
    <WORK_TYPE>RESURFACING WITH HOT-MIX ASPHALT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>2000</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT MO 104 E                                                                                         </BEG_REF_PT>
    <END_REF_PT>AT MO 47 N                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>MO 104 E</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>MO 47 N</END_REF_PT2>
    <COUNTY>WASHINGTON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>21</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>AT RT N N                                                                                           </START_PT>
    <END_PT>1.19 MILES BEFORE MO 49 N                                                                           </END_PT>
    <START_DATE>03-JUN-09</START_DATE>
    <END_DATE>09-JUL-09</END_DATE>
    <WORK_TYPE>PATCHING OF ASPHALT PAVEMENT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT RT N N                                                                                           </BEG_REF_PT>
    <END_REF_PT>1.19 MILES BEFORE MO 49 N                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>RT N N</BEG_REF_PT2>
    <END_REF_PT1>1.19 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>MO 49 N</END_REF_PT2>
    <COUNTY>IRON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>210</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>.01 MILES AFTER MO 291 N                                                                            </START_PT>
    <END_PT>AT RT EE N                                                                                          </END_PT>
    <START_DATE>25-JUN-09</START_DATE>
    <END_DATE>10-JUL-09</END_DATE>
    <WORK_TYPE>SHOULDER WORK</WORK_TYPE>
    <WORK_HOURS>NIGHT</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>1900</START_TIME>
    <END_TIME>0600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.01 MILES AFTER MO 291 N                                                                            </BEG_REF_PT>
    <END_REF_PT>AT RT EE N                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.01 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>MO 291 N</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>RT EE N</END_REF_PT2>
    <COUNTY>JACKSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>210</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>.57 MILES AFTER MO 291 N                                                                            </START_PT>
    <END_PT>.95 MILES AFTER MO 291 N                                                                            </END_PT>
    <START_DATE>02-JUL-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>UNDERSEALING/MUDJACKING</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.57 MILES AFTER MO 291 N                                                                            </BEG_REF_PT>
    <END_REF_PT>.95 MILES AFTER MO 291 N                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.57 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>MO 291 N</BEG_REF_PT2>
    <END_REF_PT1>.95 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>MO 291 N</END_REF_PT2>
    <COUNTY>JACKSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>210</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>AT RT EE N                                                                                          </START_PT>
    <END_PT>.76 MILES BEFORE MO 291 N                                                                           </END_PT>
    <START_DATE>26-JUN-09</START_DATE>
    <END_DATE>10-JUL-09</END_DATE>
    <WORK_TYPE>SHOULDER WORK</WORK_TYPE>
    <WORK_HOURS>NIGHT</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>1900</START_TIME>
    <END_TIME>0600</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT RT EE N                                                                                          </BEG_REF_PT>
    <END_REF_PT>.76 MILES BEFORE MO 291 N                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>RT EE N</BEG_REF_PT2>
    <END_REF_PT1>.76 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>MO 291 N</END_REF_PT2>
    <COUNTY>CLAY</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>210</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>.95 MILES BEFORE MO 291 N                                                                           </START_PT>
    <END_PT>.57 MILES BEFORE MO 291 N                                                                           </END_PT>
    <START_DATE>02-JUL-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>UNDERSEALING/MUDJACKING</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.95 MILES BEFORE MO 291 N                                                                           </BEG_REF_PT>
    <END_REF_PT>.57 MILES BEFORE MO 291 N                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.95 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>MO 291 N</BEG_REF_PT2>
    <END_REF_PT1>.57 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>MO 291 N</END_REF_PT2>
    <COUNTY>CLAY</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>240</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>.45 MILES BEFORE MO 87 S                                                                            </START_PT>
    <END_PT>.04 MILES BEFORE MO 87 S                                                                            </END_PT>
    <START_DATE>04-AUG-08</START_DATE>
    <END_DATE>15-SEP-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>00</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.45 MILES BEFORE MO 87 S                                                                            </BEG_REF_PT>
    <END_REF_PT>.04 MILES BEFORE MO 87 S                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>LEFT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.45 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>MO 87 S</BEG_REF_PT2>
    <END_REF_PT1>.04 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>MO 87 S</END_REF_PT2>
    <COUNTY>SALINE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>240</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>.04 MILES AFTER MO 5 S                                                                              </START_PT>
    <END_PT>.45 MILES AFTER MO 5 S                                                                              </END_PT>
    <START_DATE>04-AUG-08</START_DATE>
    <END_DATE>15-SEP-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>00</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.04 MILES AFTER MO 5 S                                                                              </BEG_REF_PT>
    <END_REF_PT>.45 MILES AFTER MO 5 S                                                                              </END_REF_PT>
    <CLOSURE_LOCATION>LEFT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.04 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>MO 5 S</BEG_REF_PT2>
    <END_REF_PT1>.45 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>MO 5 S</END_REF_PT2>
    <COUNTY>HOWARD</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>28</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT RT O N                                                                                           </START_PT>
    <END_PT>2.35 MILES AFTER RT C W                                                                             </END_PT>
    <START_DATE>22-JUN-09</START_DATE>
    <END_DATE>09-JUL-09</END_DATE>
    <WORK_TYPE>SHOULDER WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT RT O N                                                                                           </BEG_REF_PT>
    <END_REF_PT>2.35 MILES AFTER RT C W                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>RT O N</BEG_REF_PT2>
    <END_REF_PT1>2.35 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT C W</END_REF_PT2>
    <COUNTY>PULASKI</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>28</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>2.35 MILES BEFORE RT C E                                                                            </START_PT>
    <END_PT>AT RT O N                                                                                           </END_PT>
    <START_DATE>22-JUN-09</START_DATE>
    <END_DATE>09-JUL-09</END_DATE>
    <WORK_TYPE>SHOULDER WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>2.35 MILES BEFORE RT C E                                                                            </BEG_REF_PT>
    <END_REF_PT>AT RT O N                                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>2.35 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>RT C E</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>RT O N</END_REF_PT2>
    <COUNTY>PULASKI</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>291</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>.98 MILES BEFORE MO 150 W                                                                           </START_PT>
    <END_PT>AT US 50 E                                                                                          </END_PT>
    <START_DATE>28-JUN-09</START_DATE>
    <END_DATE>03-JUL-09</END_DATE>
    <WORK_TYPE>PAVEMENT STRIPING</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0100</START_TIME>
    <END_TIME>2400</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.98 MILES BEFORE MO 150 W                                                                           </BEG_REF_PT>
    <END_REF_PT>AT US 50 E                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.98 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>MO 150 W</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>US 50 E</END_REF_PT2>
    <COUNTY>JACKSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>291</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>AT US 24 E                                                                                          </START_PT>
    <END_PT>LESS THAN .01 MILES AFTER IS 70 W                                                                   </END_PT>
    <START_DATE>30-JUN-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>PAVEMENT STRIPING</WORK_TYPE>
    <WORK_HOURS>NIGHT</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>2000</START_TIME>
    <END_TIME>0600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT US 24 E                                                                                          </BEG_REF_PT>
    <END_REF_PT>LESS THAN .01 MILES AFTER IS 70 W                                                                   </END_REF_PT>
    <CLOSURE_LOCATION>LEFT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>US 24 E</BEG_REF_PT2>
    <END_REF_PT1>LESS THAN .01 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>IS 70 W</END_REF_PT2>
    <COUNTY>JACKSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>291</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>.22 MILES BEFORE CST CHIPMAN RD W                                                                   </START_PT>
    <END_PT>.22 MILES BEFORE CST CHIPMAN RD W                                                                   </END_PT>
    <START_DATE>15-JUN-09</START_DATE>
    <END_DATE>03-JUL-09</END_DATE>
    <WORK_TYPE>PRIVATE / UTILITY CONTRACT WORK IN AREA</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0900</START_TIME>
    <END_TIME>1500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.22 MILES BEFORE CST CHIPMAN RD W                                                                   </BEG_REF_PT>
    <END_REF_PT>.22 MILES BEFORE CST CHIPMAN RD W                                                                   </END_REF_PT>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.22 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>CST CHIPMAN RD W</BEG_REF_PT2>
    <END_REF_PT1>.22 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>CST CHIPMAN RD W</END_REF_PT2>
    <COUNTY>JACKSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>291</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>AT US 50 E                                                                                          </START_PT>
    <END_PT>.98 MILES AFTER MO 150 E                                                                            </END_PT>
    <START_DATE>28-JUN-09</START_DATE>
    <END_DATE>03-JUL-09</END_DATE>
    <WORK_TYPE>PAVEMENT STRIPING</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0100</START_TIME>
    <END_TIME>2400</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT US 50 E                                                                                          </BEG_REF_PT>
    <END_REF_PT>.98 MILES AFTER MO 150 E                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>US 50 E</BEG_REF_PT2>
    <END_REF_PT1>.98 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>MO 150 E</END_REF_PT2>
    <COUNTY>JACKSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>30</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>.9 MILES BEFORE RT Y S                                                                              </START_PT>
    <END_PT>AT RT B S                                                                                           </END_PT>
    <START_DATE>22-JUN-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>SHOULDER WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0500</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.9 MILES BEFORE RT Y S                                                                              </BEG_REF_PT>
    <END_REF_PT>AT RT B S                                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.9 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>RT Y S</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>RT B S</END_REF_PT2>
    <COUNTY>JEFFERSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>30</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>LESS THAN .01 MILES BEFORE RT B S                                                                   </START_PT>
    <END_PT>.9 MILES AFTER RT Y N                                                                               </END_PT>
    <START_DATE>22-JUN-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>SHOULDER WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0500</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>LESS THAN .01 MILES BEFORE RT B S                                                                   </BEG_REF_PT>
    <END_REF_PT>.9 MILES AFTER RT Y N                                                                               </END_REF_PT>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>LESS THAN .01 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>RT B S</BEG_REF_PT2>
    <END_REF_PT1>.9 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT Y N</END_REF_PT2>
    <COUNTY>JEFFERSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>32</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT RT H N                                                                                           </START_PT>
    <END_PT>1.83 MILES AFTER RT H S                                                                             </END_PT>
    <START_DATE>20-MAY-09</START_DATE>
    <END_DATE>19-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0100</START_TIME>
    <END_TIME>2400</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT RT H N                                                                                           </BEG_REF_PT>
    <END_REF_PT>1.83 MILES AFTER RT H S                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>RT H N</BEG_REF_PT2>
    <END_REF_PT1>1.83 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT H S</END_REF_PT2>
    <COUNTY>DALLAS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>32</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT RT KK N                                                                                          </START_PT>
    <END_PT>AT MO 21 S                                                                                          </END_PT>
    <START_DATE>03-JUN-09</START_DATE>
    <END_DATE>10-JUL-09</END_DATE>
    <WORK_TYPE>PATCHING OF ASPHALT PAVEMENT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1400</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT RT KK N                                                                                          </BEG_REF_PT>
    <END_REF_PT>AT MO 21 S                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>RT KK N</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>MO 21 S</END_REF_PT2>
    <COUNTY>IRON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>32</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>AT RT H N                                                                                           </START_PT>
    <END_PT>1.83 MILES AFTER RT H S                                                                             </END_PT>
    <START_DATE>20-MAY-09</START_DATE>
    <END_DATE>19-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0100</START_TIME>
    <END_TIME>2400</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT RT H N                                                                                           </BEG_REF_PT>
    <END_REF_PT>1.83 MILES AFTER RT H S                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>RT H N</BEG_REF_PT2>
    <END_REF_PT1>1.83 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT H S</END_REF_PT2>
    <COUNTY>DALLAS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>39</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>.11 MILES BEFORE IS 44 E                                                                            </START_PT>
    <END_PT>.1 MILES AFTER IS 44 W                                                                              </END_PT>
    <START_DATE>19-JAN-09</START_DATE>
    <END_DATE>25-NOV-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1800</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.11 MILES BEFORE IS 44 E                                                                            </BEG_REF_PT>
    <END_REF_PT>.1 MILES AFTER IS 44 W                                                                              </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.11 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>IS 44 E</BEG_REF_PT2>
    <END_REF_PT1>.1 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>IS 44 W</END_REF_PT2>
    <COUNTY>LAWRENCE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>39</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>.1 MILES BEFORE IS 44 W                                                                             </START_PT>
    <END_PT>.11 MILES AFTER IS 44 E                                                                             </END_PT>
    <START_DATE>19-JAN-09</START_DATE>
    <END_DATE>25-NOV-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1800</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.1 MILES BEFORE IS 44 W                                                                             </BEG_REF_PT>
    <END_REF_PT>.11 MILES AFTER IS 44 E                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.1 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>IS 44 W</BEG_REF_PT2>
    <END_REF_PT1>.11 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>IS 44 E</END_REF_PT2>
    <COUNTY>LAWRENCE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>41</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>1.67 MILES AFTER RT F E                                                                             </START_PT>
    <END_PT>1.72 MILES AFTER RT F E                                                                             </END_PT>
    <START_DATE>24-JUN-09</START_DATE>
    <END_DATE>16-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0800</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.67 MILES AFTER RT F E                                                                             </BEG_REF_PT>
    <END_REF_PT>1.72 MILES AFTER RT F E                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.67 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>RT F E</BEG_REF_PT2>
    <END_REF_PT1>1.72 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT F E</END_REF_PT2>
    <COUNTY>CARROLL</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>41</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>1.72 MILES BEFORE RT F W                                                                            </START_PT>
    <END_PT>1.67 MILES BEFORE RT F W                                                                            </END_PT>
    <START_DATE>24-JUN-09</START_DATE>
    <END_DATE>16-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0800</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.72 MILES BEFORE RT F W                                                                            </BEG_REF_PT>
    <END_REF_PT>1.67 MILES BEFORE RT F W                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.72 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>RT F W</BEG_REF_PT2>
    <END_REF_PT1>1.67 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>RT F W</END_REF_PT2>
    <COUNTY>CARROLL</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>46</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT CST 1ST ST E                                                                                     </START_PT>
    <END_PT>AT US 71 N                                                                                          </END_PT>
    <START_DATE>01-APR-09</START_DATE>
    <END_DATE>31-AUG-09</END_DATE>
    <WORK_TYPE>PAVEMENT STRIPING</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>SATURDAY</WEEKEND>
    <START_TIME>0500</START_TIME>
    <END_TIME>2200</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT CST 1ST ST E                                                                                     </BEG_REF_PT>
    <END_REF_PT>AT US 71 N                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>CST 1ST ST E</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>US 71 N</END_REF_PT2>
    <COUNTY>NODAWAY</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>46</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>AT US 71 N                                                                                          </START_PT>
    <END_PT>AT CST 1ST ST E                                                                                     </END_PT>
    <START_DATE>01-APR-09</START_DATE>
    <END_DATE>31-AUG-09</END_DATE>
    <WORK_TYPE>PAVEMENT STRIPING</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>SATURDAY</WEEKEND>
    <START_TIME>0500</START_TIME>
    <END_TIME>2200</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT US 71 N                                                                                          </BEG_REF_PT>
    <END_REF_PT>AT CST 1ST ST E                                                                                     </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>US 71 N</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>CST 1ST ST E</END_REF_PT2>
    <COUNTY>NODAWAY</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>47</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>AT CST FIFTH ST E                                                                                   </START_PT>
    <END_PT>.55 MILES AFTER CST 3RD PKWY W                                                                      </END_PT>
    <START_DATE>26-MAR-09</START_DATE>
    <END_DATE>11-DEC-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>SATURDAY</WEEKEND>
    <START_TIME>0800</START_TIME>
    <END_TIME>1800</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT CST FIFTH ST E                                                                                   </BEG_REF_PT>
    <END_REF_PT>.55 MILES AFTER CST 3RD PKWY W                                                                      </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>CST FIFTH ST E</BEG_REF_PT2>
    <END_REF_PT1>.55 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>CST 3RD PKWY W</END_REF_PT2>
    <COUNTY>FRANKLIN</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>5</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>.2 MILES AFTER CST BRICE ST W                                                                       </START_PT>
    <END_PT>.38 MILES AFTER CST HARRIS LN E                                                                     </END_PT>
    <START_DATE>22-JUN-09</START_DATE>
    <END_DATE>31-JUL-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0100</START_TIME>
    <END_TIME>2400</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.2 MILES AFTER CST BRICE ST W                                                                       </BEG_REF_PT>
    <END_REF_PT>.38 MILES AFTER CST HARRIS LN E                                                                     </END_REF_PT>
    <CLOSURE_LOCATION>LEFT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.2 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>CST BRICE ST W</BEG_REF_PT2>
    <END_REF_PT1>.38 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>CST HARRIS LN E</END_REF_PT2>
    <COUNTY>LACLEDE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>5</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>.5 MILES BEFORE US 40 E                                                                             </START_PT>
    <END_PT>.4 MILES BEFORE US 40 E                                                                             </END_PT>
    <START_DATE>26-JUN-09</START_DATE>
    <END_DATE>10-JUL-09</END_DATE>
    <WORK_TYPE>PRIVATE / UTILITY CONTRACT WORK IN AREA</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.5 MILES BEFORE US 40 E                                                                             </BEG_REF_PT>
    <END_REF_PT>.4 MILES BEFORE US 40 E                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.5 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>US 40 E</BEG_REF_PT2>
    <END_REF_PT1>.4 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>US 40 E</END_REF_PT2>
    <COUNTY>COOPER</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>5</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>LESS THAN .01 MILES AFTER IS 70 W                                                                   </START_PT>
    <END_PT>AT US 40 E                                                                                          </END_PT>
    <START_DATE>02-JUN-09</START_DATE>
    <END_DATE>07-AUG-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1800</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>LESS THAN .01 MILES AFTER IS 70 W                                                                   </BEG_REF_PT>
    <END_REF_PT>AT US 40 E                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>LESS THAN .01 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>IS 70 W</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>US 40 E</END_REF_PT2>
    <COUNTY>COOPER</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>5</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>.4 MILES AFTER US 40 E                                                                              </START_PT>
    <END_PT>.5 MILES AFTER US 40 E                                                                              </END_PT>
    <START_DATE>26-JUN-09</START_DATE>
    <END_DATE>10-JUL-09</END_DATE>
    <WORK_TYPE>PRIVATE / UTILITY CONTRACT WORK IN AREA</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.4 MILES AFTER US 40 E                                                                              </BEG_REF_PT>
    <END_REF_PT>.5 MILES AFTER US 40 E                                                                              </END_REF_PT>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.4 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>US 40 E</BEG_REF_PT2>
    <END_REF_PT1>.5 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>US 40 E</END_REF_PT2>
    <COUNTY>COOPER</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>51</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>.7 MILES AFTER RT FF N                                                                              </START_PT>
    <END_PT>AT US 60 E                                                                                          </END_PT>
    <START_DATE>05-MAY-09</START_DATE>
    <END_DATE>01-AUG-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.7 MILES AFTER RT FF N                                                                              </BEG_REF_PT>
    <END_REF_PT>AT US 60 E                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>NONE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.7 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>RT FF N</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>US 60 E</END_REF_PT2>
    <COUNTY>STODDARD</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>51</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>AT MO 72 W                                                                                          </START_PT>
    <END_PT>.09 MILES BEFORE IS 55 S                                                                            </END_PT>
    <START_DATE>11-JUN-09</START_DATE>
    <END_DATE>18-SEP-09</END_DATE>
    <WORK_TYPE>RESURFACING WITH HOT-MIX ASPHALT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT MO 72 W                                                                                          </BEG_REF_PT>
    <END_REF_PT>.09 MILES BEFORE IS 55 S                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>MO 72 W</BEG_REF_PT2>
    <END_REF_PT1>.09 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>IS 55 S</END_REF_PT2>
    <COUNTY>BOLLINGER</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>51</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>.09 MILES AFTER IS 55 S                                                                             </START_PT>
    <END_PT>AT MO 72 W                                                                                          </END_PT>
    <START_DATE>11-JUN-09</START_DATE>
    <END_DATE>18-SEP-09</END_DATE>
    <WORK_TYPE>RESURFACING WITH HOT-MIX ASPHALT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.09 MILES AFTER IS 55 S                                                                             </BEG_REF_PT>
    <END_REF_PT>AT MO 72 W                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.09 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>IS 55 S</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>MO 72 W</END_REF_PT2>
    <COUNTY>PERRY</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>51</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>.7 MILES AFTER RT FF N                                                                              </START_PT>
    <END_PT>AT US 60 E                                                                                          </END_PT>
    <START_DATE>05-MAY-09</START_DATE>
    <END_DATE>01-AUG-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.7 MILES AFTER RT FF N                                                                              </BEG_REF_PT>
    <END_REF_PT>AT US 60 E                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>NONE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.7 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>RT FF N</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>US 60 E</END_REF_PT2>
    <COUNTY>STODDARD</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>58</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>.51 MILES BEFORE MO 291 N                                                                           </START_PT>
    <END_PT>AT MO 291 N                                                                                         </END_PT>
    <START_DATE>02-JUL-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>PAVEMENT REPAIR OF CONCRETE PAVEMENT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0800</START_TIME>
    <END_TIME>1500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.51 MILES BEFORE MO 291 N                                                                           </BEG_REF_PT>
    <END_REF_PT>AT MO 291 N                                                                                         </END_REF_PT>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.51 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>MO 291 N</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>MO 291 N</END_REF_PT2>
    <COUNTY>CASS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>59</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>AT CST COCKRELL DR E                                                                                </START_PT>
    <END_PT>1.13 MILES AFTER BU 71 S                                                                            </END_PT>
    <START_DATE>10-JUN-09</START_DATE>
    <END_DATE>15-AUG-09</END_DATE>
    <WORK_TYPE>PRIVATE / UTILITY CONTRACT WORK IN AREA</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1900</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT CST COCKRELL DR E                                                                                </BEG_REF_PT>
    <END_REF_PT>1.13 MILES AFTER BU 71 S                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>CST COCKRELL DR E</BEG_REF_PT2>
    <END_REF_PT1>1.13 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>BU 71 S</END_REF_PT2>
    <COUNTY>NEWTON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>59</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>AT CST COCKRELL DR E                                                                                </START_PT>
    <END_PT>1.13 MILES AFTER BU 71 S                                                                            </END_PT>
    <START_DATE>10-JUN-09</START_DATE>
    <END_DATE>15-AUG-09</END_DATE>
    <WORK_TYPE>PRIVATE / UTILITY CONTRACT WORK IN AREA</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1900</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT CST COCKRELL DR E                                                                                </BEG_REF_PT>
    <END_REF_PT>1.13 MILES AFTER BU 71 S                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>CST COCKRELL DR E</BEG_REF_PT2>
    <END_REF_PT1>1.13 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>BU 71 S</END_REF_PT2>
    <COUNTY>NEWTON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>6</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT CST FREDERICK BLVD W                                                                             </START_PT>
    <END_PT>.86 MILES AFTER RT P W                                                                              </END_PT>
    <START_DATE>11-FEB-09</START_DATE>
    <END_DATE>31-DEC-09</END_DATE>
    <WORK_TYPE>SWEEPING AND FLUSHING PAVEMENT SURFACE</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1400</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT CST FREDERICK BLVD W                                                                             </BEG_REF_PT>
    <END_REF_PT>.86 MILES AFTER RT P W                                                                              </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>CST FREDERICK BLVD W</BEG_REF_PT2>
    <END_REF_PT1>.86 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT P W</END_REF_PT2>
    <COUNTY>BUCHANAN</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>6</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>.2 MILES AFTER MO 149 N                                                                             </START_PT>
    <END_PT>AT US 63 S                                                                                          </END_PT>
    <START_DATE>30-JUN-09</START_DATE>
    <END_DATE>09-JUL-09</END_DATE>
    <WORK_TYPE>PAVEMENT REPAIR OF CONCRETE PAVEMENT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.2 MILES AFTER MO 149 N                                                                             </BEG_REF_PT>
    <END_REF_PT>AT US 63 S                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.2 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>MO 149 N</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>US 63 S</END_REF_PT2>
    <COUNTY>ADAIR</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>6</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>AT US 63 S                                                                                          </START_PT>
    <END_PT>.2 MILES BEFORE MO 149 S                                                                            </END_PT>
    <START_DATE>30-JUN-09</START_DATE>
    <END_DATE>09-JUL-09</END_DATE>
    <WORK_TYPE>PAVEMENT REPAIR OF CONCRETE PAVEMENT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT US 63 S                                                                                          </BEG_REF_PT>
    <END_REF_PT>.2 MILES BEFORE MO 149 S                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>US 63 S</BEG_REF_PT2>
    <END_REF_PT1>.2 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>MO 149 S</END_REF_PT2>
    <COUNTY>ADAIR</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>6</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>.86 MILES BEFORE RT P E                                                                             </START_PT>
    <END_PT>AT CST FREDERICK BLVD W                                                                             </END_PT>
    <START_DATE>11-FEB-09</START_DATE>
    <END_DATE>31-DEC-09</END_DATE>
    <WORK_TYPE>SWEEPING AND FLUSHING PAVEMENT SURFACE</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1400</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.86 MILES BEFORE RT P E                                                                             </BEG_REF_PT>
    <END_REF_PT>AT CST FREDERICK BLVD W                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.86 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>RT P E</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>CST FREDERICK BLVD W</END_REF_PT2>
    <COUNTY>BUCHANAN</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>68</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>3.08 MILES BEFORE RT F E                                                                            </START_PT>
    <END_PT>2.15 MILES BEFORE RT F E                                                                            </END_PT>
    <START_DATE>29-JUN-09</START_DATE>
    <END_DATE>09-JUL-09</END_DATE>
    <WORK_TYPE>CULVERT REPLACEMENT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>3.08 MILES BEFORE RT F E                                                                            </BEG_REF_PT>
    <END_REF_PT>2.15 MILES BEFORE RT F E                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>3.08 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>RT F E</BEG_REF_PT2>
    <END_REF_PT1>2.15 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>RT F E</END_REF_PT2>
    <COUNTY>PHELPS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>68</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>2.15 MILES AFTER RT F W                                                                             </START_PT>
    <END_PT>3.08 MILES AFTER RT F W                                                                             </END_PT>
    <START_DATE>29-JUN-09</START_DATE>
    <END_DATE>09-JUL-09</END_DATE>
    <WORK_TYPE>CULVERT REPLACEMENT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>2.15 MILES AFTER RT F W                                                                             </BEG_REF_PT>
    <END_REF_PT>3.08 MILES AFTER RT F W                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>2.15 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>RT F W</BEG_REF_PT2>
    <END_REF_PT1>3.08 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT F W</END_REF_PT2>
    <COUNTY>PHELPS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>7</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>AT CRD 163RD ST W                                                                                   </START_PT>
    <END_PT>1.2 MILES AFTER CRD 163RD ST E                                                                      </END_PT>
    <START_DATE>29-JUN-09</START_DATE>
    <END_DATE>07-JUL-09</END_DATE>
    <WORK_TYPE>RESURFACING WITH HOT-MIX ASPHALT</WORK_TYPE>
    <WORK_HOURS>NIGHT</WORK_HOURS>
    <WEEKEND>SATURDAY</WEEKEND>
    <START_TIME>1800</START_TIME>
    <END_TIME>0600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT CRD 163RD ST W                                                                                   </BEG_REF_PT>
    <END_REF_PT>1.2 MILES AFTER CRD 163RD ST E                                                                      </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>CRD 163RD ST W</BEG_REF_PT2>
    <END_REF_PT1>1.2 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>CRD 163RD ST E</END_REF_PT2>
    <COUNTY>CASS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>72</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT RT J E                                                                                           </START_PT>
    <END_PT>.72 MILES AFTER RT J W                                                                              </END_PT>
    <START_DATE>30-APR-09</START_DATE>
    <END_DATE>14-AUG-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>2000</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT RT J E                                                                                           </BEG_REF_PT>
    <END_REF_PT>.72 MILES AFTER RT J W                                                                              </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>RT J E</BEG_REF_PT2>
    <END_REF_PT1>.72 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT J W</END_REF_PT2>
    <COUNTY>MADISON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>72</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>2.29 MILES BEFORE MO 51 N                                                                           </START_PT>
    <END_PT>1.12 MILES BEFORE MO 51 N                                                                           </END_PT>
    <START_DATE>26-JUN-09</START_DATE>
    <END_DATE>01-NOV-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>00</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>2.29 MILES BEFORE MO 51 N                                                                           </BEG_REF_PT>
    <END_REF_PT>1.12 MILES BEFORE MO 51 N                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>NONE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>2.29 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>MO 51 N</BEG_REF_PT2>
    <END_REF_PT1>1.12 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>MO 51 N</END_REF_PT2>
    <COUNTY>BOLLINGER</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>72</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>1.12 MILES AFTER MO 51 S                                                                            </START_PT>
    <END_PT>2.29 MILES AFTER MO 51 S                                                                            </END_PT>
    <START_DATE>26-JUN-09</START_DATE>
    <END_DATE>01-NOV-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>00</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.12 MILES AFTER MO 51 S                                                                            </BEG_REF_PT>
    <END_REF_PT>2.29 MILES AFTER MO 51 S                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>NONE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.12 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>MO 51 S</BEG_REF_PT2>
    <END_REF_PT1>2.29 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>MO 51 S</END_REF_PT2>
    <COUNTY>BOLLINGER</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>72</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>.72 MILES BEFORE RT J E                                                                             </START_PT>
    <END_PT>AT RT J E                                                                                           </END_PT>
    <START_DATE>30-APR-09</START_DATE>
    <END_DATE>14-AUG-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>2000</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.72 MILES BEFORE RT J E                                                                             </BEG_REF_PT>
    <END_REF_PT>AT RT J E                                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.72 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>RT J E</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>RT J E</END_REF_PT2>
    <COUNTY>MADISON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>752</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT US 59 N                                                                                          </START_PT>
    <END_PT>AT IS 229 S                                                                                         </END_PT>
    <START_DATE>11-FEB-09</START_DATE>
    <END_DATE>31-DEC-09</END_DATE>
    <WORK_TYPE>SWEEPING AND FLUSHING PAVEMENT SURFACE</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1400</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT US 59 N                                                                                          </BEG_REF_PT>
    <END_REF_PT>AT IS 229 S                                                                                         </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>US 59 N</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>IS 229 S</END_REF_PT2>
    <COUNTY>BUCHANAN</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>752</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>AT IS 229 N                                                                                         </START_PT>
    <END_PT>AT CST ALABAMA ST W                                                                                 </END_PT>
    <START_DATE>11-FEB-09</START_DATE>
    <END_DATE>31-DEC-09</END_DATE>
    <WORK_TYPE>SWEEPING AND FLUSHING PAVEMENT SURFACE</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1400</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT IS 229 N                                                                                         </BEG_REF_PT>
    <END_REF_PT>AT CST ALABAMA ST W                                                                                 </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>IS 229 N</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>CST ALABAMA ST W</END_REF_PT2>
    <COUNTY>BUCHANAN</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>763</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>.39 MILES BEFORE CST BLUE RIDGE RD W                                                                </START_PT>
    <END_PT>AT US 63 N                                                                                          </END_PT>
    <START_DATE>01-JAN-09</START_DATE>
    <END_DATE>01-AUG-09</END_DATE>
    <WORK_TYPE>SHOULDER WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>00</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.39 MILES BEFORE CST BLUE RIDGE RD W                                                                </BEG_REF_PT>
    <END_REF_PT>AT US 63 N                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.39 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>CST BLUE RIDGE RD W</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>US 63 N</END_REF_PT2>
    <COUNTY>BOONE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>763</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>AT US 63 S                                                                                          </START_PT>
    <END_PT>.39 MILES AFTER CST BLUE RIDGE RD E                                                                 </END_PT>
    <START_DATE>01-JAN-09</START_DATE>
    <END_DATE>01-AUG-09</END_DATE>
    <WORK_TYPE>SHOULDER WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>00</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT US 63 S                                                                                          </BEG_REF_PT>
    <END_REF_PT>.39 MILES AFTER CST BLUE RIDGE RD E                                                                 </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>US 63 S</BEG_REF_PT2>
    <END_REF_PT1>.39 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>CST BLUE RIDGE RD E</END_REF_PT2>
    <COUNTY>BOONE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>86</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT RT P E                                                                                           </START_PT>
    <END_PT>AT US 71 S                                                                                          </END_PT>
    <START_DATE>15-JUN-09</START_DATE>
    <END_DATE>31-JUL-09</END_DATE>
    <WORK_TYPE>RESURFACING WITH HOT-MIX ASPHALT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>2000</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT RT P E                                                                                           </BEG_REF_PT>
    <END_REF_PT>AT US 71 S                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>RT P E</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>US 71 S</END_REF_PT2>
    <COUNTY>NEWTON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>86</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>AT RT P E                                                                                           </START_PT>
    <END_PT>AT US 71 S                                                                                          </END_PT>
    <START_DATE>15-JUN-09</START_DATE>
    <END_DATE>31-JUL-09</END_DATE>
    <WORK_TYPE>RESURFACING WITH HOT-MIX ASPHALT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>2000</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT RT P E                                                                                           </BEG_REF_PT>
    <END_REF_PT>AT US 71 S                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>RT P E</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>US 71 S</END_REF_PT2>
    <COUNTY>NEWTON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>9</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>AT IS 635 N                                                                                         </START_PT>
    <END_PT>1.3 MILES AFTER IS 635 S                                                                            </END_PT>
    <START_DATE>02-SEP-08</START_DATE>
    <END_DATE>16-AUG-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0100</START_TIME>
    <END_TIME>2400</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT IS 635 N                                                                                         </BEG_REF_PT>
    <END_REF_PT>1.3 MILES AFTER IS 635 S                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>IS 635 N</BEG_REF_PT2>
    <END_REF_PT1>1.3 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>IS 635 S</END_REF_PT2>
    <COUNTY>PLATTE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>9</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>1.27 MILES BEFORE IS 635 S                                                                          </START_PT>
    <END_PT>.26 MILES BEFORE IS 635 S                                                                           </END_PT>
    <START_DATE>22-JUN-09</START_DATE>
    <END_DATE>31-JUL-09</END_DATE>
    <WORK_TYPE>MEDIAN OR SHOULDER WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0900</START_TIME>
    <END_TIME>1800</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.27 MILES BEFORE IS 635 S                                                                          </BEG_REF_PT>
    <END_REF_PT>.26 MILES BEFORE IS 635 S                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>LEFT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.27 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>IS 635 S</BEG_REF_PT2>
    <END_REF_PT1>.26 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>IS 635 S</END_REF_PT2>
    <COUNTY>PLATTE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>92</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT RT N N                                                                                           </START_PT>
    <END_PT>AT IS 29 S                                                                                          </END_PT>
    <START_DATE>04-MAY-09</START_DATE>
    <END_DATE>17-JUL-09</END_DATE>
    <WORK_TYPE>RESURFACING WITH HOT-MIX ASPHALT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT RT N N                                                                                           </BEG_REF_PT>
    <END_REF_PT>AT IS 29 S                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>RT N N</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>IS 29 S</END_REF_PT2>
    <COUNTY>PLATTE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>92</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT IS 29 S                                                                                          </START_PT>
    <END_PT>AT RT DD W                                                                                          </END_PT>
    <START_DATE>04-MAY-09</START_DATE>
    <END_DATE>17-JUL-09</END_DATE>
    <WORK_TYPE>RESURFACING WITH HOT-MIX ASPHALT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT IS 29 S                                                                                          </BEG_REF_PT>
    <END_REF_PT>AT RT DD W                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>IS 29 S</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>RT DD W</END_REF_PT2>
    <COUNTY>PLATTE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>92</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>AT RT DD W                                                                                          </START_PT>
    <END_PT>AT IS 29 S                                                                                          </END_PT>
    <START_DATE>04-MAY-09</START_DATE>
    <END_DATE>17-JUL-09</END_DATE>
    <WORK_TYPE>RESURFACING WITH HOT-MIX ASPHALT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT RT DD W                                                                                          </BEG_REF_PT>
    <END_REF_PT>AT IS 29 S                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>RT DD W</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>IS 29 S</END_REF_PT2>
    <COUNTY>CLAY</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>92</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>AT IS 29 S                                                                                          </START_PT>
    <END_PT>AT RT N N                                                                                           </END_PT>
    <START_DATE>04-MAY-09</START_DATE>
    <END_DATE>17-JUL-09</END_DATE>
    <WORK_TYPE>RESURFACING WITH HOT-MIX ASPHALT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT IS 29 S                                                                                          </BEG_REF_PT>
    <END_REF_PT>AT RT N N                                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>IS 29 S</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>RT N N</END_REF_PT2>
    <COUNTY>PLATTE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>94</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>AT OR 94 W                                                                                          </START_PT>
    <END_PT>AT CST HARVESTER RD W                                                                               </END_PT>
    <START_DATE>02-JUL-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>SHOULDER WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0800</START_TIME>
    <END_TIME>1300</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT OR 94 W                                                                                          </BEG_REF_PT>
    <END_REF_PT>AT CST HARVESTER RD W                                                                               </END_REF_PT>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>OR 94 W</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>CST HARVESTER RD W</END_REF_PT2>
    <COUNTY>ST. CHARLES</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>99</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>3.77 MILES AFTER RT T S                                                                             </START_PT>
    <END_PT>3.83 MILES AFTER RT T S                                                                             </END_PT>
    <START_DATE>11-MAY-09</START_DATE>
    <END_DATE>31-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>3.77 MILES AFTER RT T S                                                                             </BEG_REF_PT>
    <END_REF_PT>3.83 MILES AFTER RT T S                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>3.77 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>RT T S</BEG_REF_PT2>
    <END_REF_PT1>3.83 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT T S</END_REF_PT2>
    <COUNTY>SHANNON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>99</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>3.83 MILES BEFORE RT T N                                                                            </START_PT>
    <END_PT>3.77 MILES BEFORE RT T N                                                                            </END_PT>
    <START_DATE>11-MAY-09</START_DATE>
    <END_DATE>31-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>3.83 MILES BEFORE RT T N                                                                            </BEG_REF_PT>
    <END_REF_PT>3.77 MILES BEFORE RT T N                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>3.83 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>RT T N</BEG_REF_PT2>
    <END_REF_PT1>3.77 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>RT T N</END_REF_PT2>
    <COUNTY>SHANNON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>OR</DESIGNATION>
    <TRAVELWAY_NAME>44</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT CST SOUTH HWY DR E                                                                               </START_PT>
    <END_PT>AT CST SOUTH HWY DR E                                                                               </END_PT>
    <START_DATE>29-JUN-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>PAVEMENT MARKING</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT CST SOUTH HWY DR E                                                                               </BEG_REF_PT>
    <END_REF_PT>AT CST SOUTH HWY DR E                                                                               </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>CST SOUTH HWY DR E</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>CST SOUTH HWY DR E</END_REF_PT2>
    <COUNTY>ST. LOUIS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RP</DESIGNATION>
    <TRAVELWAY_NAME>75TH ST TO US71S</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>.13 MILES BEFORE US 71 S                                                                            </START_PT>
    <END_PT>AT US 71 S                                                                                          </END_PT>
    <START_DATE>29-JUN-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>RESURFACING WITH HOT-MIX ASPHALT</WORK_TYPE>
    <WORK_HOURS>NIGHT</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>2100</START_TIME>
    <END_TIME>2400</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.13 MILES BEFORE US 71 S                                                                            </BEG_REF_PT>
    <END_REF_PT>AT US 71 S                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.13 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>US 71 S</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>US 71 S</END_REF_PT2>
    <COUNTY>JACKSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RP</DESIGNATION>
    <TRAVELWAY_NAME>85TH ST TO US71N</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>AT CST 85TH ST E                                                                                    </START_PT>
    <END_PT>AT US 71 N                                                                                          </END_PT>
    <START_DATE>29-JUN-09</START_DATE>
    <END_DATE>03-JUL-09</END_DATE>
    <WORK_TYPE>RESURFACING WITH HOT-MIX ASPHALT</WORK_TYPE>
    <WORK_HOURS>NIGHT</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>2200</START_TIME>
    <END_TIME>0200</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT CST 85TH ST E                                                                                    </BEG_REF_PT>
    <END_REF_PT>AT US 71 N                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>CST 85TH ST E</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>US 71 N</END_REF_PT2>
    <COUNTY>JACKSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RP</DESIGNATION>
    <TRAVELWAY_NAME>BELLEVUE AVE TO IS64W</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT CST BELLEVUE AVE N                                                                               </START_PT>
    <END_PT>AT IS 64 W                                                                                          </END_PT>
    <START_DATE>14-DEC-08</START_DATE>
    <END_DATE>31-DEC-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>1600</START_TIME>
    <END_TIME>0500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT CST BELLEVUE AVE N                                                                               </BEG_REF_PT>
    <END_REF_PT>AT IS 64 W                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>NONE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>CST BELLEVUE AVE N</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>IS 64 W</END_REF_PT2>
    <COUNTY>ST. LOUIS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RP</DESIGNATION>
    <TRAVELWAY_NAME>BIG BEND BLVD N TO IS64E</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT CST N BIG BEND BLVD S                                                                            </START_PT>
    <END_PT>AT IS 64 E                                                                                          </END_PT>
    <START_DATE>14-DEC-08</START_DATE>
    <END_DATE>31-DEC-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>1600</START_TIME>
    <END_TIME>0500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT CST N BIG BEND BLVD S                                                                            </BEG_REF_PT>
    <END_REF_PT>AT IS 64 E                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>NONE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>CST N BIG BEND BLVD S</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>IS 64 E</END_REF_PT2>
    <COUNTY>ST. LOUIS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RP</DESIGNATION>
    <TRAVELWAY_NAME>BIG BEND BLVD S TO IS64E</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT CST N BIG BEND BLVD S                                                                            </START_PT>
    <END_PT>AT IS 64 E                                                                                          </END_PT>
    <START_DATE>14-DEC-08</START_DATE>
    <END_DATE>31-DEC-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>1600</START_TIME>
    <END_TIME>0500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT CST N BIG BEND BLVD S                                                                            </BEG_REF_PT>
    <END_REF_PT>AT IS 64 E                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>NONE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>CST N BIG BEND BLVD S</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>IS 64 E</END_REF_PT2>
    <COUNTY>ST. LOUIS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RP</DESIGNATION>
    <TRAVELWAY_NAME>BLENDON PL TO IS64W</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>AT CST WISE AVE E                                                                                   </START_PT>
    <END_PT>AT IS 64 W                                                                                          </END_PT>
    <START_DATE>14-DEC-08</START_DATE>
    <END_DATE>31-DEC-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>1600</START_TIME>
    <END_TIME>0500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT CST WISE AVE E                                                                                   </BEG_REF_PT>
    <END_REF_PT>AT IS 64 W                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>NONE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>CST WISE AVE E</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>IS 64 W</END_REF_PT2>
    <COUNTY>ST. LOUIS CITY</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RP</DESIGNATION>
    <TRAVELWAY_NAME>BRENTWOOD BLVD TO IS64E</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT CST BRENTWOOD BLVD S                                                                             </START_PT>
    <END_PT>AT IS 64 E                                                                                          </END_PT>
    <START_DATE>01-JAN-08</START_DATE>
    <END_DATE>31-DEC-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>2200</START_TIME>
    <END_TIME>2400</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT CST BRENTWOOD BLVD S                                                                             </BEG_REF_PT>
    <END_REF_PT>AT IS 64 E                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>CST BRENTWOOD BLVD S</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>IS 64 E</END_REF_PT2>
    <COUNTY>ST. LOUIS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RP</DESIGNATION>
    <TRAVELWAY_NAME>HAMPTON CONCOURSE TO IS64E</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT CST HAMPTON CONCOURSE N                                                                          </START_PT>
    <END_PT>AT US 40 E                                                                                          </END_PT>
    <START_DATE>22-SEP-08</START_DATE>
    <END_DATE>31-DEC-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0500</START_TIME>
    <END_TIME>0500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT CST HAMPTON CONCOURSE N                                                                          </BEG_REF_PT>
    <END_REF_PT>AT US 40 E                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>NONE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>CST HAMPTON CONCOURSE N</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>US 40 E</END_REF_PT2>
    <COUNTY>ST. LOUIS CITY</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RP</DESIGNATION>
    <TRAVELWAY_NAME>HAMPTON CONCOURSE TO IS64E</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT CST HAMPTON CONCOURSE N                                                                          </START_PT>
    <END_PT>AT US 40 E                                                                                          </END_PT>
    <START_DATE>22-SEP-08</START_DATE>
    <END_DATE>31-DEC-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0500</START_TIME>
    <END_TIME>0500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT CST HAMPTON CONCOURSE N                                                                          </BEG_REF_PT>
    <END_REF_PT>AT US 40 E                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>NONE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>CST HAMPTON CONCOURSE N</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>US 40 E</END_REF_PT2>
    <COUNTY>ST. LOUIS CITY</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RP</DESIGNATION>
    <TRAVELWAY_NAME>HAMPTON CONCOURSE TO IS64W</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>AT CST HAMPTON CONCOURSE N                                                                          </START_PT>
    <END_PT>AT IS 64 W                                                                                          </END_PT>
    <START_DATE>22-SEP-08</START_DATE>
    <END_DATE>31-DEC-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0500</START_TIME>
    <END_TIME>0500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT CST HAMPTON CONCOURSE N                                                                          </BEG_REF_PT>
    <END_REF_PT>AT IS 64 W                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>NONE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>CST HAMPTON CONCOURSE N</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>IS 64 W</END_REF_PT2>
    <COUNTY>ST. LOUIS CITY</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RP</DESIGNATION>
    <TRAVELWAY_NAME>HAMPTON CONCOURSE TO IS64W</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>AT CST HAMPTON CONCOURSE N                                                                          </START_PT>
    <END_PT>AT IS 64 W                                                                                          </END_PT>
    <START_DATE>22-SEP-08</START_DATE>
    <END_DATE>31-DEC-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0500</START_TIME>
    <END_TIME>0500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT CST HAMPTON CONCOURSE N                                                                          </BEG_REF_PT>
    <END_REF_PT>AT IS 64 W                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>NONE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>CST HAMPTON CONCOURSE N</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>IS 64 W</END_REF_PT2>
    <COUNTY>ST. LOUIS CITY</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RP</DESIGNATION>
    <TRAVELWAY_NAME>HANLEY DR TO IS64W</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>AT CST HANLEY RD S                                                                                  </START_PT>
    <END_PT>AT IS 64 W                                                                                          </END_PT>
    <START_DATE>01-JUN-07</START_DATE>
    <END_DATE>31-DEC-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0100</START_TIME>
    <END_TIME>0100</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT CST HANLEY RD S                                                                                  </BEG_REF_PT>
    <END_REF_PT>AT IS 64 W                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>MIDDLE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>CST HANLEY RD S</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>IS 64 W</END_REF_PT2>
    <COUNTY>ST. LOUIS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RP</DESIGNATION>
    <TRAVELWAY_NAME>HANLEY DR TO US40W</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>AT CST HANLEY RD S                                                                                  </START_PT>
    <END_PT>AT IS 64 W                                                                                          </END_PT>
    <START_DATE>01-JUN-07</START_DATE>
    <END_DATE>31-DEC-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0100</START_TIME>
    <END_TIME>0100</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT CST HANLEY RD S                                                                                  </BEG_REF_PT>
    <END_REF_PT>AT IS 64 W                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>MIDDLE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>CST HANLEY RD S</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>IS 64 W</END_REF_PT2>
    <COUNTY>ST. LOUIS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RP</DESIGNATION>
    <TRAVELWAY_NAME>IS29S TO US24</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>AT IS 35 S                                                                                          </START_PT>
    <END_PT>AT CST THE PASEO S                                                                                  </END_PT>
    <START_DATE>03-JUN-09</START_DATE>
    <END_DATE>04-JUN-10</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0900</START_TIME>
    <END_TIME>1500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT IS 35 S                                                                                          </BEG_REF_PT>
    <END_REF_PT>AT CST THE PASEO S                                                                                  </END_REF_PT>
    <CLOSURE_LOCATION>LEFT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>IS 35 S</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>CST THE PASEO S</END_REF_PT2>
    <COUNTY>JACKSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RP</DESIGNATION>
    <TRAVELWAY_NAME>IS44W TO LP44W</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>AT IS 44 W                                                                                          </START_PT>
    <END_PT>AT LP 44 W                                                                                          </END_PT>
    <START_DATE>01-FEB-09</START_DATE>
    <END_DATE>10-JUL-10</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1900</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT IS 44 W                                                                                          </BEG_REF_PT>
    <END_REF_PT>AT LP 44 W                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>IS 44 W</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>LP 44 W</END_REF_PT2>
    <COUNTY>GREENE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RP</DESIGNATION>
    <TRAVELWAY_NAME>IS55N TO MO84</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT IS 55 N                                                                                          </START_PT>
    <END_PT>AT MO 84 E                                                                                          </END_PT>
    <START_DATE>16-JUN-09</START_DATE>
    <END_DATE>29-JUL-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1900</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT IS 55 N                                                                                          </BEG_REF_PT>
    <END_REF_PT>AT MO 84 E                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>IS 55 N</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>MO 84 E</END_REF_PT2>
    <COUNTY>PEMISCOT</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RP</DESIGNATION>
    <TRAVELWAY_NAME>KINGSHIGHWAY BLVD TO IS64W</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>AT CST KINGSHIGHWAY BLVD S                                                                          </START_PT>
    <END_PT>AT IS 64 W                                                                                          </END_PT>
    <START_DATE>14-DEC-08</START_DATE>
    <END_DATE>31-DEC-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>1600</START_TIME>
    <END_TIME>0500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT CST KINGSHIGHWAY BLVD S                                                                          </BEG_REF_PT>
    <END_REF_PT>AT IS 64 W                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>NONE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>CST KINGSHIGHWAY BLVD S</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>IS 64 W</END_REF_PT2>
    <COUNTY>ST. LOUIS CITY</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RP</DESIGNATION>
    <TRAVELWAY_NAME>MC CAUSLAND AVE TO IS64E</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT CST McCAUSLAND AVE N                                                                             </START_PT>
    <END_PT>AT IS 64 E                                                                                          </END_PT>
    <START_DATE>14-DEC-08</START_DATE>
    <END_DATE>31-DEC-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>1600</START_TIME>
    <END_TIME>0500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT CST McCAUSLAND AVE N                                                                             </BEG_REF_PT>
    <END_REF_PT>AT IS 64 E                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>NONE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>CST McCAUSLAND AVE N</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>IS 64 E</END_REF_PT2>
    <COUNTY>ST. LOUIS CITY</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RP</DESIGNATION>
    <TRAVELWAY_NAME>OAKLAND AVE TO IS64W</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>AT CST OAKLAND AVE W                                                                                </START_PT>
    <END_PT>AT IS 64 W                                                                                          </END_PT>
    <START_DATE>14-DEC-08</START_DATE>
    <END_DATE>31-DEC-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>1600</START_TIME>
    <END_TIME>0500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT CST OAKLAND AVE W                                                                                </BEG_REF_PT>
    <END_REF_PT>AT IS 64 W                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>NONE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>CST OAKLAND AVE W</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>IS 64 W</END_REF_PT2>
    <COUNTY>ST. LOUIS CITY</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RP</DESIGNATION>
    <TRAVELWAY_NAME>SKINKER BLVD TO IS64E</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>AT CST SKINKER BLVD S                                                                               </START_PT>
    <END_PT>AT IS 64 E                                                                                          </END_PT>
    <START_DATE>14-DEC-08</START_DATE>
    <END_DATE>31-DEC-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>1600</START_TIME>
    <END_TIME>0500</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT CST SKINKER BLVD S                                                                               </BEG_REF_PT>
    <END_REF_PT>AT IS 64 E                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>NONE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>CST SKINKER BLVD S</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>IS 64 E</END_REF_PT2>
    <COUNTY>ST. LOUIS CITY</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RP</DESIGNATION>
    <TRAVELWAY_NAME>US24 TO IS29N</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>.23 MILES BEFORE IS 29 N                                                                            </START_PT>
    <END_PT>AT IS 29 N                                                                                          </END_PT>
    <START_DATE>11-AUG-08</START_DATE>
    <END_DATE>31-AUG-10</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0900</START_TIME>
    <END_TIME>0900</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.23 MILES BEFORE IS 29 N                                                                            </BEG_REF_PT>
    <END_REF_PT>AT IS 29 N                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.23 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>IS 29 N</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>IS 29 N</END_REF_PT2>
    <COUNTY>JACKSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RP</DESIGNATION>
    <TRAVELWAY_NAME>US24 TO US65N</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>AT US 24 E                                                                                          </START_PT>
    <END_PT>AT US 65 N                                                                                          </END_PT>
    <START_DATE>29-JUN-09</START_DATE>
    <END_DATE>13-JUL-09</END_DATE>
    <WORK_TYPE>MILLING AND RESURFACING ASPHALT PAVEMENT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>SATURDAY</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1800</END_TIME>
    <NUMBER_LANES_CLOSED>00</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT US 24 E                                                                                          </BEG_REF_PT>
    <END_REF_PT>AT US 65 N                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>US 24 E</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>US 65 N</END_REF_PT2>
    <COUNTY>CARROLL</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RP</DESIGNATION>
    <TRAVELWAY_NAME>US50W TO IS470E</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT US 50 W                                                                                          </START_PT>
    <END_PT>AT IS 470 E                                                                                         </END_PT>
    <START_DATE>10-JUN-09</START_DATE>
    <END_DATE>14-AUG-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0100</START_TIME>
    <END_TIME>0100</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT US 50 W                                                                                          </BEG_REF_PT>
    <END_REF_PT>AT IS 470 E                                                                                         </END_REF_PT>
    <CLOSURE_LOCATION>MIDDLE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>US 50 W</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>IS 470 E</END_REF_PT2>
    <COUNTY>JACKSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RP</DESIGNATION>
    <TRAVELWAY_NAME>US65S TO BU65</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>AT US 65 S                                                                                          </START_PT>
    <END_PT>AT BU 65 N                                                                                          </END_PT>
    <START_DATE>29-JUN-09</START_DATE>
    <END_DATE>13-JUL-09</END_DATE>
    <WORK_TYPE>MILLING AND RESURFACING ASPHALT PAVEMENT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>SATURDAY</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>00</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT US 65 S                                                                                          </BEG_REF_PT>
    <END_REF_PT>AT BU 65 N                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>US 65 S</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>BU 65 N</END_REF_PT2>
    <COUNTY>CARROLL</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RP</DESIGNATION>
    <TRAVELWAY_NAME>US71N TO 75TH ST</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>AT US 71 N                                                                                          </START_PT>
    <END_PT>.18 MILES AFTER US 71 N                                                                             </END_PT>
    <START_DATE>30-JUN-09</START_DATE>
    <END_DATE>03-JUL-09</END_DATE>
    <WORK_TYPE>RESURFACING WITH HOT-MIX ASPHALT</WORK_TYPE>
    <WORK_HOURS>NIGHT</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0200</START_TIME>
    <END_TIME>0500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT US 71 N                                                                                          </BEG_REF_PT>
    <END_REF_PT>.18 MILES AFTER US 71 N                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>US 71 N</BEG_REF_PT2>
    <END_REF_PT1>.18 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>US 71 N</END_REF_PT2>
    <COUNTY>JACKSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RP</DESIGNATION>
    <TRAVELWAY_NAME>US71N TO MACON ST</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>AT IS 29 N                                                                                          </START_PT>
    <END_PT>AT CST BEDFORD AVE E                                                                                </END_PT>
    <START_DATE>01-DEC-08</START_DATE>
    <END_DATE>01-DEC-10</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>1000</START_TIME>
    <END_TIME>1300</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT IS 29 N                                                                                          </BEG_REF_PT>
    <END_REF_PT>AT CST BEDFORD AVE E                                                                                </END_REF_PT>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>IS 29 N</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>CST BEDFORD AVE E</END_REF_PT2>
    <COUNTY>CLAY</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RP</DESIGNATION>
    <TRAVELWAY_NAME>US71S TO 85TH ST</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>AT US 71 S                                                                                          </START_PT>
    <END_PT>AT CST 85TH ST E                                                                                    </END_PT>
    <START_DATE>29-JUN-09</START_DATE>
    <END_DATE>03-JUL-09</END_DATE>
    <WORK_TYPE>RESURFACING WITH HOT-MIX ASPHALT</WORK_TYPE>
    <WORK_HOURS>NIGHT</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>2400</START_TIME>
    <END_TIME>0300</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT US 71 S                                                                                          </BEG_REF_PT>
    <END_REF_PT>AT CST 85TH ST E                                                                                    </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>US 71 S</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>CST 85TH ST E</END_REF_PT2>
    <COUNTY>JACKSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RP</DESIGNATION>
    <TRAVELWAY_NAME>US71S TO MO150</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>AT US 71 S                                                                                          </START_PT>
    <END_PT>AT MO 150 E</END_PT>
    <START_DATE>06-NOV-08</START_DATE>
    <END_DATE>11-SEP-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0100</START_TIME>
    <END_TIME>2400</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT US 71 S                                                                                          </BEG_REF_PT>
    <END_REF_PT>AT MO 150 E</END_REF_PT>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>US 71 S</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>MO 150 E</END_REF_PT2>
    <COUNTY>JACKSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>A</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>3.15 MILES BEFORE US 61 N                                                                           </START_PT>
    <END_PT>2.7 MILES BEFORE US 61 N                                                                            </END_PT>
    <START_DATE>18-MAY-09</START_DATE>
    <END_DATE>19-AUG-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>3.15 MILES BEFORE US 61 N                                                                           </BEG_REF_PT>
    <END_REF_PT>2.7 MILES BEFORE US 61 N                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>3.15 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>US 61 N</BEG_REF_PT2>
    <END_REF_PT1>2.7 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>US 61 N</END_REF_PT2>
    <COUNTY>SCOTT</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>A</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>AT RT A S                                                                                           </START_PT>
    <END_PT>AT RT D N                                                                                           </END_PT>
    <START_DATE>22-JUN-09</START_DATE>
    <END_DATE>10-AUG-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>0700</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT RT A S                                                                                           </BEG_REF_PT>
    <END_REF_PT>AT RT D N                                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>RT A S</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>RT D N</END_REF_PT2>
    <COUNTY>DEKALB</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>A</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>3.15 MILES BEFORE US 61 N                                                                           </START_PT>
    <END_PT>2.7 MILES BEFORE US 61 N                                                                            </END_PT>
    <START_DATE>18-MAY-09</START_DATE>
    <END_DATE>19-AUG-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>3.15 MILES BEFORE US 61 N                                                                           </BEG_REF_PT>
    <END_REF_PT>2.7 MILES BEFORE US 61 N                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>3.15 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>US 61 N</BEG_REF_PT2>
    <END_REF_PT1>2.7 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>US 61 N</END_REF_PT2>
    <COUNTY>SCOTT</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>B</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>1.92 MILES AFTER RT P S                                                                             </START_PT>
    <END_PT>2.27 MILES BEFORE RT H N                                                                            </END_PT>
    <START_DATE>15-JUN-09</START_DATE>
    <END_DATE>01-AUG-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0800</START_TIME>
    <END_TIME>1900</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.92 MILES AFTER RT P S                                                                             </BEG_REF_PT>
    <END_REF_PT>2.27 MILES BEFORE RT H N                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.92 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>RT P S</BEG_REF_PT2>
    <END_REF_PT1>2.27 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>RT H N</END_REF_PT2>
    <COUNTY>ST. CLAIR</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>B</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>2.23 MILES BEFORE MO 72 W                                                                           </START_PT>
    <END_PT>AT MO 72 W                                                                                          </END_PT>
    <START_DATE>29-JUN-09</START_DATE>
    <END_DATE>13-AUG-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>0700</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>2.23 MILES BEFORE MO 72 W                                                                           </BEG_REF_PT>
    <END_REF_PT>AT MO 72 W                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>2.23 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>MO 72 W</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>MO 72 W</END_REF_PT2>
    <COUNTY>BOLLINGER</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>B</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>AT MO 72 W                                                                                          </START_PT>
    <END_PT>2.23 MILES AFTER MO 72 E                                                                            </END_PT>
    <START_DATE>29-JUN-09</START_DATE>
    <END_DATE>13-AUG-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>0700</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT MO 72 W                                                                                          </BEG_REF_PT>
    <END_REF_PT>2.23 MILES AFTER MO 72 E                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>MO 72 W</BEG_REF_PT2>
    <END_REF_PT1>2.23 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>MO 72 E</END_REF_PT2>
    <COUNTY>BOLLINGER</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>B</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>2.27 MILES AFTER RT H S                                                                             </START_PT>
    <END_PT>1.92 MILES BEFORE RT P N                                                                            </END_PT>
    <START_DATE>15-JUN-09</START_DATE>
    <END_DATE>01-AUG-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0800</START_TIME>
    <END_TIME>1900</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>2.27 MILES AFTER RT H S                                                                             </BEG_REF_PT>
    <END_REF_PT>1.92 MILES BEFORE RT P N                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>2.27 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>RT H S</BEG_REF_PT2>
    <END_REF_PT1>1.92 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>RT P N</END_REF_PT2>
    <COUNTY>ST. CLAIR</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>BB</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>2.54 MILES BEFORE US 169 S                                                                          </START_PT>
    <END_PT>AT US 169 S                                                                                         </END_PT>
    <START_DATE>08-JUN-09</START_DATE>
    <END_DATE>14-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>0700</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>2.54 MILES BEFORE US 169 S                                                                          </BEG_REF_PT>
    <END_REF_PT>AT US 169 S                                                                                         </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>2.54 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>US 169 S</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>US 169 S</END_REF_PT2>
    <COUNTY>GENTRY</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>BB</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>AT US 169 S                                                                                         </START_PT>
    <END_PT>2.54 MILES AFTER US 169 N                                                                           </END_PT>
    <START_DATE>08-JUN-09</START_DATE>
    <END_DATE>14-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>0700</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT US 169 S                                                                                         </BEG_REF_PT>
    <END_REF_PT>2.54 MILES AFTER US 169 N                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>US 169 S</BEG_REF_PT2>
    <END_REF_PT1>2.54 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>US 169 N</END_REF_PT2>
    <COUNTY>GENTRY</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>C</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT MO 52 E                                                                                          </START_PT>
    <END_PT>AT RT AA S                                                                                          </END_PT>
    <START_DATE>24-JUN-09</START_DATE>
    <END_DATE>31-JUL-09</END_DATE>
    <WORK_TYPE>RESURFACING WITH HOT-MIX ASPHALT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>2000</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT MO 52 E                                                                                          </BEG_REF_PT>
    <END_REF_PT>AT RT AA S                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>MO 52 E</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>RT AA S</END_REF_PT2>
    <COUNTY>MORGAN</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>C</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>3.97 MILES AFTER RT A W                                                                             </START_PT>
    <END_PT>4.77 MILES AFTER RT A W                                                                             </END_PT>
    <START_DATE>29-JUN-09</START_DATE>
    <END_DATE>08-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>3.97 MILES AFTER RT A W                                                                             </BEG_REF_PT>
    <END_REF_PT>4.77 MILES AFTER RT A W                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>3.97 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>RT A W</BEG_REF_PT2>
    <END_REF_PT1>4.77 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT A W</END_REF_PT2>
    <COUNTY>ST. CLAIR</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>C</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>AT US 24 E                                                                                          </START_PT>
    <END_PT>3.52 MILES BEFORE RT M W                                                                            </END_PT>
    <START_DATE>18-MAY-09</START_DATE>
    <END_DATE>18-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0100</START_TIME>
    <END_TIME>2400</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT US 24 E                                                                                          </BEG_REF_PT>
    <END_REF_PT>3.52 MILES BEFORE RT M W                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>US 24 E</BEG_REF_PT2>
    <END_REF_PT1>3.52 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>RT M W</END_REF_PT2>
    <COUNTY>MONROE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>C</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>AT US 24 E                                                                                          </START_PT>
    <END_PT>3.52 MILES BEFORE RT M W                                                                            </END_PT>
    <START_DATE>18-MAY-09</START_DATE>
    <END_DATE>18-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0100</START_TIME>
    <END_TIME>2400</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT US 24 E                                                                                          </BEG_REF_PT>
    <END_REF_PT>3.52 MILES BEFORE RT M W                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>US 24 E</BEG_REF_PT2>
    <END_REF_PT1>3.52 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>RT M W</END_REF_PT2>
    <COUNTY>MONROE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>C</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>AT RT AA S                                                                                          </START_PT>
    <END_PT>AT MO 52 E                                                                                          </END_PT>
    <START_DATE>24-JUN-09</START_DATE>
    <END_DATE>31-JUL-09</END_DATE>
    <WORK_TYPE>RESURFACING WITH HOT-MIX ASPHALT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>2000</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT RT AA S                                                                                          </BEG_REF_PT>
    <END_REF_PT>AT MO 52 E                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>RT AA S</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>MO 52 E</END_REF_PT2>
    <COUNTY>COLE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>CC</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>1.7 MILES AFTER RT BB W                                                                             </START_PT>
    <END_PT>1.7 MILES AFTER RT BB W                                                                             </END_PT>
    <START_DATE>22-JUN-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>CULVERT REPLACEMENT</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.7 MILES AFTER RT BB W                                                                             </BEG_REF_PT>
    <END_REF_PT>1.7 MILES AFTER RT BB W                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.7 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>RT BB W</BEG_REF_PT2>
    <END_REF_PT1>1.7 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT BB W</END_REF_PT2>
    <COUNTY>GREENE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>CC</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>1.98 MILES BEFORE MO 371 N                                                                          </START_PT>
    <END_PT>1.95 MILES BEFORE MO 371 N                                                                          </END_PT>
    <START_DATE>01-JUN-09</START_DATE>
    <END_DATE>13-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>0700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.98 MILES BEFORE MO 371 N                                                                          </BEG_REF_PT>
    <END_REF_PT>1.95 MILES BEFORE MO 371 N                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.98 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>MO 371 N</BEG_REF_PT2>
    <END_REF_PT1>1.95 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>MO 371 N</END_REF_PT2>
    <COUNTY>BUCHANAN</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>CC</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>1.98 MILES BEFORE MO 371 N                                                                          </START_PT>
    <END_PT>1.95 MILES BEFORE MO 371 N                                                                          </END_PT>
    <START_DATE>01-JUN-09</START_DATE>
    <END_DATE>13-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>0700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.98 MILES BEFORE MO 371 N                                                                          </BEG_REF_PT>
    <END_REF_PT>1.95 MILES BEFORE MO 371 N                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.98 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>MO 371 N</BEG_REF_PT2>
    <END_REF_PT1>1.95 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>MO 371 N</END_REF_PT2>
    <COUNTY>BUCHANAN</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>CC</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>1.7 MILES BEFORE MO 13 N                                                                            </START_PT>
    <END_PT>1.7 MILES BEFORE MO 13 N                                                                            </END_PT>
    <START_DATE>22-JUN-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>CULVERT REPLACEMENT</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.7 MILES BEFORE MO 13 N                                                                            </BEG_REF_PT>
    <END_REF_PT>1.7 MILES BEFORE MO 13 N                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.7 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>MO 13 N</BEG_REF_PT2>
    <END_REF_PT1>1.7 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>MO 13 N</END_REF_PT2>
    <COUNTY>GREENE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>D</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>AT MO 185 S                                                                                         </START_PT>
    <END_PT>.1 MILES BEFORE CST ELMONT RD E                                                                     </END_PT>
    <START_DATE>10-JUN-09</START_DATE>
    <END_DATE>03-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>0700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT MO 185 S                                                                                         </BEG_REF_PT>
    <END_REF_PT>.1 MILES BEFORE CST ELMONT RD E                                                                     </END_REF_PT>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>MO 185 S</BEG_REF_PT2>
    <END_REF_PT1>.1 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>CST ELMONT RD E</END_REF_PT2>
    <COUNTY>FRANKLIN</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>DD</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT MO 17 N                                                                                          </START_PT>
    <END_PT>4.07 MILES AFTER MO 17 S                                                                            </END_PT>
    <START_DATE>22-JUN-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>PATCHING OF ASPHALT PAVEMENT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT MO 17 N                                                                                          </BEG_REF_PT>
    <END_REF_PT>4.07 MILES AFTER MO 17 S                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>MO 17 N</BEG_REF_PT2>
    <END_REF_PT1>4.07 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>MO 17 S</END_REF_PT2>
    <COUNTY>PULASKI</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>DD</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>.28 MILES AFTER RT A N                                                                              </START_PT>
    <END_PT>3.08 MILES AFTER RT A N                                                                             </END_PT>
    <START_DATE>18-MAY-09</START_DATE>
    <END_DATE>02-AUG-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1800</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.28 MILES AFTER RT A N                                                                              </BEG_REF_PT>
    <END_REF_PT>3.08 MILES AFTER RT A N                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.28 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>RT A N</BEG_REF_PT2>
    <END_REF_PT1>3.08 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT A N</END_REF_PT2>
    <COUNTY>MONTGOMERY</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>DD</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>4.07 MILES BEFORE MO 17 N                                                                           </START_PT>
    <END_PT>AT MO 17 N                                                                                          </END_PT>
    <START_DATE>22-JUN-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>PATCHING OF ASPHALT PAVEMENT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>4.07 MILES BEFORE MO 17 N                                                                           </BEG_REF_PT>
    <END_REF_PT>AT MO 17 N                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>4.07 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>MO 17 N</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>MO 17 N</END_REF_PT2>
    <COUNTY>PULASKI</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>DD</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>.28 MILES AFTER RT A S                                                                              </START_PT>
    <END_PT>3.08 MILES AFTER RT A S                                                                             </END_PT>
    <START_DATE>18-MAY-09</START_DATE>
    <END_DATE>02-AUG-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1800</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.28 MILES AFTER RT A S                                                                              </BEG_REF_PT>
    <END_REF_PT>3.08 MILES AFTER RT A S                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.28 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>RT A S</BEG_REF_PT2>
    <END_REF_PT1>3.08 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT A S</END_REF_PT2>
    <COUNTY>LINCOLN</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>E</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>AT RT D N                                                                                           </START_PT>
    <END_PT>AT RT A S                                                                                           </END_PT>
    <START_DATE>22-JUN-09</START_DATE>
    <END_DATE>10-AUG-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>0700</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT RT D N                                                                                           </BEG_REF_PT>
    <END_REF_PT>AT RT A S                                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>RT D N</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>RT A S</END_REF_PT2>
    <COUNTY>DEKALB</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>EE</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>4.2 MILES BEFORE MO 142 W                                                                           </START_PT>
    <END_PT>AT MO 142 W                                                                                         </END_PT>
    <START_DATE>29-JUN-09</START_DATE>
    <END_DATE>09-JUL-09</END_DATE>
    <WORK_TYPE>PATCHING OF ASPHALT PAVEMENT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>4.2 MILES BEFORE MO 142 W                                                                           </BEG_REF_PT>
    <END_REF_PT>AT MO 142 W                                                                                         </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>4.2 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>MO 142 W</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>MO 142 W</END_REF_PT2>
    <COUNTY>RIPLEY</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>EE</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>AT MO 142 W                                                                                         </START_PT>
    <END_PT>4.2 MILES AFTER MO 142 E                                                                            </END_PT>
    <START_DATE>29-JUN-09</START_DATE>
    <END_DATE>09-JUL-09</END_DATE>
    <WORK_TYPE>PATCHING OF ASPHALT PAVEMENT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT MO 142 W                                                                                         </BEG_REF_PT>
    <END_REF_PT>4.2 MILES AFTER MO 142 E                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>MO 142 W</BEG_REF_PT2>
    <END_REF_PT1>4.2 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>MO 142 E</END_REF_PT2>
    <COUNTY>RIPLEY</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>F</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT MO 37 N                                                                                          </START_PT>
    <END_PT>AT RT U S                                                                                           </END_PT>
    <START_DATE>26-MAY-09</START_DATE>
    <END_DATE>11-AUG-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1800</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT MO 37 N                                                                                          </BEG_REF_PT>
    <END_REF_PT>AT RT U S                                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>MO 37 N</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>RT U S</END_REF_PT2>
    <COUNTY>JASPER</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>F</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>.12 MILES AFTER CST 12TH ST W                                                                       </START_PT>
    <END_PT>AT CST FIFTH ST E                                                                                   </END_PT>
    <START_DATE>07-JUL-08</START_DATE>
    <END_DATE>01-AUG-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>2400</START_TIME>
    <END_TIME>2400</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.12 MILES AFTER CST 12TH ST W                                                                       </BEG_REF_PT>
    <END_REF_PT>AT CST FIFTH ST E                                                                                   </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.12 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>CST 12TH ST W</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>CST FIFTH ST E</END_REF_PT2>
    <COUNTY>JACKSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>F</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>AT CST FIFTH ST E                                                                                   </START_PT>
    <END_PT>.12 MILES BEFORE CST 12TH ST E                                                                      </END_PT>
    <START_DATE>07-JUL-08</START_DATE>
    <END_DATE>01-AUG-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>2400</START_TIME>
    <END_TIME>2400</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT CST FIFTH ST E                                                                                   </BEG_REF_PT>
    <END_REF_PT>.12 MILES BEFORE CST 12TH ST E                                                                      </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>CST FIFTH ST E</BEG_REF_PT2>
    <END_REF_PT1>.12 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>CST 12TH ST E</END_REF_PT2>
    <COUNTY>JACKSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>F</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>AT RT U S                                                                                           </START_PT>
    <END_PT>AT MO 37 N                                                                                          </END_PT>
    <START_DATE>26-MAY-09</START_DATE>
    <END_DATE>11-AUG-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1800</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT RT U S                                                                                           </BEG_REF_PT>
    <END_REF_PT>AT MO 37 N                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>RT U S</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>MO 37 N</END_REF_PT2>
    <COUNTY>JASPER</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>H</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>2.98 MILES AFTER RT Y S                                                                             </START_PT>
    <END_PT>AT RT V E                                                                                           </END_PT>
    <START_DATE>23-JUN-09</START_DATE>
    <END_DATE>24-JUL-09</END_DATE>
    <WORK_TYPE>MILLING AND RESURFACING ASPHALT PAVEMENT</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>2000</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>2.98 MILES AFTER RT Y S                                                                             </BEG_REF_PT>
    <END_REF_PT>AT RT V E                                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>2.98 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>RT Y S</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>RT V E</END_REF_PT2>
    <COUNTY>NODAWAY</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>H</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>AT RT V E                                                                                           </START_PT>
    <END_PT>2.98 MILES BEFORE RT Y N                                                                            </END_PT>
    <START_DATE>23-JUN-09</START_DATE>
    <END_DATE>24-JUL-09</END_DATE>
    <WORK_TYPE>MILLING AND RESURFACING ASPHALT PAVEMENT</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>2000</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT RT V E                                                                                           </BEG_REF_PT>
    <END_REF_PT>2.98 MILES BEFORE RT Y N                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>RT V E</BEG_REF_PT2>
    <END_REF_PT1>2.98 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>RT Y N</END_REF_PT2>
    <COUNTY>NODAWAY</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>J</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT US 63 N                                                                                          </START_PT>
    <END_PT>1.7 MILES AFTER RT Y E                                                                              </END_PT>
    <START_DATE>29-JUN-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>PATCHING OF ASPHALT PAVEMENT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT US 63 N                                                                                          </BEG_REF_PT>
    <END_REF_PT>1.7 MILES AFTER RT Y E                                                                              </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>US 63 N</BEG_REF_PT2>
    <END_REF_PT1>1.7 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT Y E</END_REF_PT2>
    <COUNTY>RANDOLPH</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>J</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>1.75 MILES AFTER MO 11 N                                                                            </START_PT>
    <END_PT>1.75 MILES AFTER MO 11 N                                                                            </END_PT>
    <START_DATE>15-JUN-09</START_DATE>
    <END_DATE>30-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0100</START_TIME>
    <END_TIME>2400</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.75 MILES AFTER MO 11 N                                                                            </BEG_REF_PT>
    <END_REF_PT>1.75 MILES AFTER MO 11 N                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.75 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>MO 11 N</BEG_REF_PT2>
    <END_REF_PT1>1.75 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>MO 11 N</END_REF_PT2>
    <COUNTY>ADAIR</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>J</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>10.12 MILES BEFORE US 60 W                                                                          </START_PT>
    <END_PT>AT US 60 W                                                                                          </END_PT>
    <START_DATE>08-JUN-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>RESURFACING WITH HOT-MIX ASPHALT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1800</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>10.12 MILES BEFORE US 60 W                                                                          </BEG_REF_PT>
    <END_REF_PT>AT US 60 W                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>10.12 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>US 60 W</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>US 60 W</END_REF_PT2>
    <COUNTY>CARTER</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>J</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>AT US 60 W                                                                                          </START_PT>
    <END_PT>10.12 MILES AFTER US 60 E                                                                           </END_PT>
    <START_DATE>08-JUN-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>RESURFACING WITH HOT-MIX ASPHALT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1800</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT US 60 W                                                                                          </BEG_REF_PT>
    <END_REF_PT>10.12 MILES AFTER US 60 E                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>US 60 W</BEG_REF_PT2>
    <END_REF_PT1>10.12 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>US 60 E</END_REF_PT2>
    <COUNTY>CARTER</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>J</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>1.75 MILES BEFORE MO 11 S                                                                           </START_PT>
    <END_PT>1.75 MILES BEFORE MO 11 S                                                                           </END_PT>
    <START_DATE>15-JUN-09</START_DATE>
    <END_DATE>30-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0100</START_TIME>
    <END_TIME>2400</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.75 MILES BEFORE MO 11 S                                                                           </BEG_REF_PT>
    <END_REF_PT>1.75 MILES BEFORE MO 11 S                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.75 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>MO 11 S</BEG_REF_PT2>
    <END_REF_PT1>1.75 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>MO 11 S</END_REF_PT2>
    <COUNTY>ADAIR</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>J</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>1.7 MILES BEFORE RT Y W                                                                             </START_PT>
    <END_PT>AT US 63 N                                                                                          </END_PT>
    <START_DATE>29-JUN-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>PATCHING OF ASPHALT PAVEMENT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.7 MILES BEFORE RT Y W                                                                             </BEG_REF_PT>
    <END_REF_PT>AT US 63 N                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.7 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>RT Y W</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>US 63 N</END_REF_PT2>
    <COUNTY>RANDOLPH</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>JJ</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>.14 MILES BEFORE IS 70 E                                                                            </START_PT>
    <END_PT>AT IS 70 E                                                                                          </END_PT>
    <START_DATE>04-JUN-09</START_DATE>
    <END_DATE>11-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.14 MILES BEFORE IS 70 E                                                                            </BEG_REF_PT>
    <END_REF_PT>AT IS 70 E                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.14 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>IS 70 E</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>IS 70 E</END_REF_PT2>
    <COUNTY>CALLAWAY</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>JJ</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>AT IS 70 E                                                                                          </START_PT>
    <END_PT>.14 MILES AFTER IS 70 E                                                                             </END_PT>
    <START_DATE>04-JUN-09</START_DATE>
    <END_DATE>11-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT IS 70 E                                                                                          </BEG_REF_PT>
    <END_REF_PT>.14 MILES AFTER IS 70 E                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>IS 70 E</BEG_REF_PT2>
    <END_REF_PT1>.14 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>IS 70 E</END_REF_PT2>
    <COUNTY>CALLAWAY</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>K</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>3.71 MILES BEFORE US 63 S                                                                           </START_PT>
    <END_PT>3.47 MILES BEFORE US 63 S                                                                           </END_PT>
    <START_DATE>26-MAY-09</START_DATE>
    <END_DATE>17-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>3.71 MILES BEFORE US 63 S                                                                           </BEG_REF_PT>
    <END_REF_PT>3.47 MILES BEFORE US 63 S                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>MIDDLE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>3.71 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>US 63 S</BEG_REF_PT2>
    <END_REF_PT1>3.47 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>US 63 S</END_REF_PT2>
    <COUNTY>PHELPS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>K</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>3.71 MILES BEFORE US 63 S                                                                           </START_PT>
    <END_PT>3.47 MILES BEFORE US 63 S                                                                           </END_PT>
    <START_DATE>26-MAY-09</START_DATE>
    <END_DATE>17-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>3.71 MILES BEFORE US 63 S                                                                           </BEG_REF_PT>
    <END_REF_PT>3.47 MILES BEFORE US 63 S                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>MIDDLE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>3.71 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>US 63 S</BEG_REF_PT2>
    <END_REF_PT1>3.47 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>US 63 S</END_REF_PT2>
    <COUNTY>PHELPS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>K</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>.15 MILES BEFORE US 61 N                                                                            </START_PT>
    <END_PT>AT RT M E                                                                                           </END_PT>
    <START_DATE>12-JUN-09</START_DATE>
    <END_DATE>15-JUL-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0800</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.15 MILES BEFORE US 61 N                                                                            </BEG_REF_PT>
    <END_REF_PT>AT RT M E                                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>LEFT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.15 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>US 61 N</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>RT M E</END_REF_PT2>
    <COUNTY>SCOTT</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>KK</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>1.37 MILES AFTER MO 51 S                                                                            </START_PT>
    <END_PT>AT RT K N                                                                                           </END_PT>
    <START_DATE>01-JUL-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>SHOULDER WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.37 MILES AFTER MO 51 S                                                                            </BEG_REF_PT>
    <END_REF_PT>AT RT K N                                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.37 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>MO 51 S</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>RT K N</END_REF_PT2>
    <COUNTY>BOLLINGER</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>KK</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>AT RT K N                                                                                           </START_PT>
    <END_PT>1.37 MILES BEFORE MO 51 N                                                                           </END_PT>
    <START_DATE>01-JUL-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>SHOULDER WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT RT K N                                                                                           </BEG_REF_PT>
    <END_REF_PT>1.37 MILES BEFORE MO 51 N                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>RT K N</BEG_REF_PT2>
    <END_REF_PT1>1.37 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>MO 51 N</END_REF_PT2>
    <COUNTY>BOLLINGER</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>M</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>.03 MILES AFTER MO 413 N                                                                            </START_PT>
    <END_PT>.75 MILES AFTER RT ZZ N                                                                             </END_PT>
    <START_DATE>06-APR-09</START_DATE>
    <END_DATE>15-AUG-09</END_DATE>
    <WORK_TYPE>TRAFFIC CONTROL SIGNING OR LIGHT SIGNALS</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1800</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.03 MILES AFTER MO 413 N                                                                            </BEG_REF_PT>
    <END_REF_PT>.75 MILES AFTER RT ZZ N                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.03 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>MO 413 N</BEG_REF_PT2>
    <END_REF_PT1>.75 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT ZZ N</END_REF_PT2>
    <COUNTY>GREENE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>M</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>AT RT C N                                                                                           </START_PT>
    <END_PT>LESS THAN .01 MILES AFTER RT C S                                                                    </END_PT>
    <START_DATE>01-JUN-09</START_DATE>
    <END_DATE>01-AUG-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>2400</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT RT C N                                                                                           </BEG_REF_PT>
    <END_REF_PT>LESS THAN .01 MILES AFTER RT C S                                                                    </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>RT C N</BEG_REF_PT2>
    <END_REF_PT1>LESS THAN .01 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT C S</END_REF_PT2>
    <COUNTY>VERNON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>M</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>LESS THAN .01 MILES BEFORE RT C N                                                                   </START_PT>
    <END_PT>AT RT C N                                                                                           </END_PT>
    <START_DATE>01-JUN-09</START_DATE>
    <END_DATE>01-AUG-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>2400</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>LESS THAN .01 MILES BEFORE RT C N                                                                   </BEG_REF_PT>
    <END_REF_PT>AT RT C N                                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>LESS THAN .01 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>RT C N</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>RT C N</END_REF_PT2>
    <COUNTY>VERNON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>M</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>.75 MILES BEFORE RT ZZ N                                                                            </START_PT>
    <END_PT>.03 MILES BEFORE RT MM S                                                                            </END_PT>
    <START_DATE>06-APR-09</START_DATE>
    <END_DATE>15-AUG-09</END_DATE>
    <WORK_TYPE>TRAFFIC CONTROL SIGNING OR LIGHT SIGNALS</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1800</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.75 MILES BEFORE RT ZZ N                                                                            </BEG_REF_PT>
    <END_REF_PT>.03 MILES BEFORE RT MM S                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.75 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>RT ZZ N</BEG_REF_PT2>
    <END_REF_PT1>.03 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>RT MM S</END_REF_PT2>
    <COUNTY>GREENE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>MM</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>.05 MILES AFTER CRD HILLSBORO HOUSE SPRING RD N                                                     </START_PT>
    <END_PT>.58 MILES BEFORE RT M E                                                                             </END_PT>
    <START_DATE>08-JUN-09</START_DATE>
    <END_DATE>01-SEP-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>SATURDAY</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>00</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.05 MILES AFTER CRD HILLSBORO HOUSE SPRING RD N                                                     </BEG_REF_PT>
    <END_REF_PT>.58 MILES BEFORE RT M E                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.05 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>CRD HILLSBORO HOUSE SPRING RD N</BEG_REF_PT2>
    <END_REF_PT1>.58 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>RT M E</END_REF_PT2>
    <COUNTY>JEFFERSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>N</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT MO 87 S                                                                                          </START_PT>
    <END_PT>1.77 MILES BEFORE RT NN N                                                                           </END_PT>
    <START_DATE>15-JUN-09</START_DATE>
    <END_DATE>10-JUL-09</END_DATE>
    <WORK_TYPE>RESURFACING WITH HOT-MIX ASPHALT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0800</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT MO 87 S                                                                                          </BEG_REF_PT>
    <END_REF_PT>1.77 MILES BEFORE RT NN N                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>MO 87 S</BEG_REF_PT2>
    <END_REF_PT1>1.77 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>RT NN N</END_REF_PT2>
    <COUNTY>MONITEAU</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>N</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>3.2 MILES BEFORE RT T E                                                                             </START_PT>
    <END_PT>1.96 MILES BEFORE RT T E                                                                            </END_PT>
    <START_DATE>01-JUN-09</START_DATE>
    <END_DATE>17-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1800</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>3.2 MILES BEFORE RT T E                                                                             </BEG_REF_PT>
    <END_REF_PT>1.96 MILES BEFORE RT T E                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>3.2 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>RT T E</BEG_REF_PT2>
    <END_REF_PT1>1.96 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>RT T E</END_REF_PT2>
    <COUNTY>PERRY</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>N</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>1.41 MILES BEFORE RT Z E                                                                            </START_PT>
    <END_PT>AT RT P W                                                                                           </END_PT>
    <START_DATE>23-JUN-09</START_DATE>
    <END_DATE>07-AUG-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.41 MILES BEFORE RT Z E                                                                            </BEG_REF_PT>
    <END_REF_PT>AT RT P W                                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.41 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>RT Z E</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>RT P W</END_REF_PT2>
    <COUNTY>STE. GENEVIEVE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>N</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>AT RT P W                                                                                           </START_PT>
    <END_PT>1.41 MILES AFTER RT Z W                                                                             </END_PT>
    <START_DATE>23-JUN-09</START_DATE>
    <END_DATE>07-AUG-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT RT P W                                                                                           </BEG_REF_PT>
    <END_REF_PT>1.41 MILES AFTER RT Z W                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>RT P W</BEG_REF_PT2>
    <END_REF_PT1>1.41 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT Z W</END_REF_PT2>
    <COUNTY>STE. GENEVIEVE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>N</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>1.96 MILES AFTER RT T W                                                                             </START_PT>
    <END_PT>3.2 MILES AFTER RT T W                                                                              </END_PT>
    <START_DATE>01-JUN-09</START_DATE>
    <END_DATE>17-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1800</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.96 MILES AFTER RT T W                                                                             </BEG_REF_PT>
    <END_REF_PT>3.2 MILES AFTER RT T W                                                                              </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.96 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>RT T W</BEG_REF_PT2>
    <END_REF_PT1>3.2 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT T W</END_REF_PT2>
    <COUNTY>PERRY</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>N</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>1.77 MILES AFTER RT NN S                                                                            </START_PT>
    <END_PT>AT MO 87 S                                                                                          </END_PT>
    <START_DATE>15-JUN-09</START_DATE>
    <END_DATE>10-JUL-09</END_DATE>
    <WORK_TYPE>RESURFACING WITH HOT-MIX ASPHALT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0800</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.77 MILES AFTER RT NN S                                                                            </BEG_REF_PT>
    <END_REF_PT>AT MO 87 S                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.77 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>RT NN S</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>MO 87 S</END_REF_PT2>
    <COUNTY>MONITEAU</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>O</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>1.75 MILES BEFORE RT D W                                                                            </START_PT>
    <END_PT>1.25 MILES BEFORE RT D W                                                                            </END_PT>
    <START_DATE>15-JUN-09</START_DATE>
    <END_DATE>08-AUG-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.75 MILES BEFORE RT D W                                                                            </BEG_REF_PT>
    <END_REF_PT>1.25 MILES BEFORE RT D W                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.75 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>RT D W</BEG_REF_PT2>
    <END_REF_PT1>1.25 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>RT D W</END_REF_PT2>
    <COUNTY>JASPER</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>O</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>.3 MILES BEFORE MO 2 W                                                                              </START_PT>
    <END_PT>.27 MILES BEFORE MO 2 W                                                                             </END_PT>
    <START_DATE>23-JUN-09</START_DATE>
    <END_DATE>23-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.3 MILES BEFORE MO 2 W                                                                              </BEG_REF_PT>
    <END_REF_PT>.27 MILES BEFORE MO 2 W                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>MIDDLE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.3 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>MO 2 W</BEG_REF_PT2>
    <END_REF_PT1>.27 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>MO 2 W</END_REF_PT2>
    <COUNTY>CASS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>O</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>.27 MILES AFTER MO 2 E                                                                              </START_PT>
    <END_PT>.3 MILES AFTER MO 2 E                                                                               </END_PT>
    <START_DATE>23-JUN-09</START_DATE>
    <END_DATE>23-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.27 MILES AFTER MO 2 E                                                                              </BEG_REF_PT>
    <END_REF_PT>.3 MILES AFTER MO 2 E                                                                               </END_REF_PT>
    <CLOSURE_LOCATION>MIDDLE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.27 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>MO 2 E</BEG_REF_PT2>
    <END_REF_PT1>.3 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>MO 2 E</END_REF_PT2>
    <COUNTY>CASS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>O</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>1.76 MILES BEFORE RT D W                                                                            </START_PT>
    <END_PT>1.66 MILES BEFORE RT D W                                                                            </END_PT>
    <START_DATE>15-JUN-09</START_DATE>
    <END_DATE>08-AUG-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.76 MILES BEFORE RT D W                                                                            </BEG_REF_PT>
    <END_REF_PT>1.66 MILES BEFORE RT D W                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.76 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>RT D W</BEG_REF_PT2>
    <END_REF_PT1>1.66 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>RT D W</END_REF_PT2>
    <COUNTY>JASPER</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>OO</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>AT RT O N                                                                                           </START_PT>
    <END_PT>8.39 MILES AFTER RT O S                                                                             </END_PT>
    <START_DATE>30-JUN-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>PATCHING OF ASPHALT PAVEMENT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0800</START_TIME>
    <END_TIME>1500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT RT O N                                                                                           </BEG_REF_PT>
    <END_REF_PT>8.39 MILES AFTER RT O S                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>RT O N</BEG_REF_PT2>
    <END_REF_PT1>8.39 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT O S</END_REF_PT2>
    <COUNTY>MACON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>OO</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>8.39 MILES BEFORE RT O N                                                                            </START_PT>
    <END_PT>AT RT O N                                                                                           </END_PT>
    <START_DATE>30-JUN-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>PATCHING OF ASPHALT PAVEMENT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0800</START_TIME>
    <END_TIME>1500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>8.39 MILES BEFORE RT O N                                                                            </BEG_REF_PT>
    <END_REF_PT>AT RT O N                                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>8.39 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>RT O N</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>RT O N</END_REF_PT2>
    <COUNTY>MACON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>PP</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>4.54 MILES BEFORE MO 30 W                                                                           </START_PT>
    <END_PT>2.75 MILES BEFORE MO 30 W                                                                           </END_PT>
    <START_DATE>22-JUN-09</START_DATE>
    <END_DATE>14-AUG-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0800</START_TIME>
    <END_TIME>1200</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>4.54 MILES BEFORE MO 30 W                                                                           </BEG_REF_PT>
    <END_REF_PT>2.75 MILES BEFORE MO 30 W                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>4.54 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>MO 30 W</BEG_REF_PT2>
    <END_REF_PT1>2.75 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>MO 30 W</END_REF_PT2>
    <COUNTY>FRANKLIN</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>TT</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>1.43 MILES BEFORE MO 41 S                                                                           </START_PT>
    <END_PT>1.41 MILES BEFORE MO 41 S                                                                           </END_PT>
    <START_DATE>15-JUN-09</START_DATE>
    <END_DATE>14-AUG-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.43 MILES BEFORE MO 41 S                                                                           </BEG_REF_PT>
    <END_REF_PT>1.41 MILES BEFORE MO 41 S                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.43 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>MO 41 S</BEG_REF_PT2>
    <END_REF_PT1>1.41 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>MO 41 S</END_REF_PT2>
    <COUNTY>SALINE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>TT</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>1.41 MILES AFTER CST MAIN ST E                                                                      </START_PT>
    <END_PT>1.43 MILES AFTER CST MAIN ST E                                                                      </END_PT>
    <START_DATE>15-JUN-09</START_DATE>
    <END_DATE>14-AUG-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.41 MILES AFTER CST MAIN ST E                                                                      </BEG_REF_PT>
    <END_REF_PT>1.43 MILES AFTER CST MAIN ST E                                                                      </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.41 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>CST MAIN ST E</BEG_REF_PT2>
    <END_REF_PT1>1.43 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>CST MAIN ST E</END_REF_PT2>
    <COUNTY>SALINE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>U</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>.68 MILES BEFORE US 61 S                                                                            </START_PT>
    <END_PT>AT US 61 N                                                                                          </END_PT>
    <START_DATE>23-MAR-09</START_DATE>
    <END_DATE>06-NOV-09</END_DATE>
    <WORK_TYPE>ROADSIDE MAINTENANCE</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>00</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.68 MILES BEFORE US 61 S                                                                            </BEG_REF_PT>
    <END_REF_PT>AT US 61 N                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>NONE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.68 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>US 61 S</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>US 61 N</END_REF_PT2>
    <COUNTY>LINCOLN</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>U</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>.79 MILES AFTER RT M W                                                                              </START_PT>
    <END_PT>.79 MILES AFTER RT M W                                                                              </END_PT>
    <START_DATE>26-MAY-09</START_DATE>
    <END_DATE>03-AUG-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.79 MILES AFTER RT M W                                                                              </BEG_REF_PT>
    <END_REF_PT>.79 MILES AFTER RT M W                                                                              </END_REF_PT>
    <CLOSURE_LOCATION>MIDDLE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.79 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>RT M W</BEG_REF_PT2>
    <END_REF_PT1>.79 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT M W</END_REF_PT2>
    <COUNTY>WASHINGTON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>U</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>.79 MILES BEFORE RT M E                                                                             </START_PT>
    <END_PT>.79 MILES BEFORE RT M E                                                                             </END_PT>
    <START_DATE>26-MAY-09</START_DATE>
    <END_DATE>03-AUG-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.79 MILES BEFORE RT M E                                                                             </BEG_REF_PT>
    <END_REF_PT>.79 MILES BEFORE RT M E                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>MIDDLE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.79 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>RT M E</BEG_REF_PT2>
    <END_REF_PT1>.79 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>RT M E</END_REF_PT2>
    <COUNTY>WASHINGTON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>U</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>AT US 61 N                                                                                          </START_PT>
    <END_PT>.68 MILES AFTER US 61 S                                                                             </END_PT>
    <START_DATE>23-MAR-09</START_DATE>
    <END_DATE>06-NOV-09</END_DATE>
    <WORK_TYPE>ROADSIDE MAINTENANCE</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>00</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT US 61 N                                                                                          </BEG_REF_PT>
    <END_REF_PT>.68 MILES AFTER US 61 S                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>NONE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>US 61 N</BEG_REF_PT2>
    <END_REF_PT1>.68 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>US 61 S</END_REF_PT2>
    <COUNTY>LINCOLN</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>VV</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>.04 MILES AFTER MO 763 S                                                                            </START_PT>
    <END_PT>2.44 MILES AFTER MO 763 S                                                                           </END_PT>
    <START_DATE>29-JUN-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>PRIVATE / UTILITY CONTRACT WORK IN AREA</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.04 MILES AFTER MO 763 S                                                                            </BEG_REF_PT>
    <END_REF_PT>2.44 MILES AFTER MO 763 S                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.04 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>MO 763 S</BEG_REF_PT2>
    <END_REF_PT1>2.44 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>MO 763 S</END_REF_PT2>
    <COUNTY>BOONE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>VV</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>2.44 MILES BEFORE MO 763 S                                                                          </START_PT>
    <END_PT>.04 MILES BEFORE MO 763 S                                                                           </END_PT>
    <START_DATE>29-JUN-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>PRIVATE / UTILITY CONTRACT WORK IN AREA</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>2.44 MILES BEFORE MO 763 S                                                                          </BEG_REF_PT>
    <END_REF_PT>.04 MILES BEFORE MO 763 S                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>2.44 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>MO 763 S</BEG_REF_PT2>
    <END_REF_PT1>.04 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>MO 763 S</END_REF_PT2>
    <COUNTY>BOONE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>W</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>.23 MILES BEFORE US 169 S                                                                           </START_PT>
    <END_PT>AT US 169 S                                                                                         </END_PT>
    <START_DATE>27-MAY-09</START_DATE>
    <END_DATE>04-SEP-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1800</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.23 MILES BEFORE US 169 S                                                                           </BEG_REF_PT>
    <END_REF_PT>AT US 169 S                                                                                         </END_REF_PT>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.23 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>US 169 S</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>US 169 S</END_REF_PT2>
    <COUNTY>ANDREW</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>W</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>.23 MILES BEFORE US 169 S                                                                           </START_PT>
    <END_PT>AT US 169 S                                                                                         </END_PT>
    <START_DATE>27-MAY-09</START_DATE>
    <END_DATE>04-SEP-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1800</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.23 MILES BEFORE US 169 S                                                                           </BEG_REF_PT>
    <END_REF_PT>AT US 169 S                                                                                         </END_REF_PT>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.23 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>US 169 S</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>US 169 S</END_REF_PT2>
    <COUNTY>ANDREW</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>WW</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>1.41 MILES AFTER RT D W                                                                             </START_PT>
    <END_PT>1.43 MILES AFTER RT D W                                                                             </END_PT>
    <START_DATE>08-JUN-09</START_DATE>
    <END_DATE>15-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.41 MILES AFTER RT D W                                                                             </BEG_REF_PT>
    <END_REF_PT>1.43 MILES AFTER RT D W                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.41 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>RT D W</BEG_REF_PT2>
    <END_REF_PT1>1.43 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT D W</END_REF_PT2>
    <COUNTY>VERNON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>WW</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>1.43 MILES BEFORE RT D E                                                                            </START_PT>
    <END_PT>1.41 MILES BEFORE RT D E                                                                            </END_PT>
    <START_DATE>08-JUN-09</START_DATE>
    <END_DATE>15-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.43 MILES BEFORE RT D E                                                                            </BEG_REF_PT>
    <END_REF_PT>1.41 MILES BEFORE RT D E                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.43 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>RT D E</BEG_REF_PT2>
    <END_REF_PT1>1.41 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>RT D E</END_REF_PT2>
    <COUNTY>VERNON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>Y</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>2.49 MILES BEFORE MO 127 N                                                                          </START_PT>
    <END_PT>1.57 MILES BEFORE MO 127 N                                                                          </END_PT>
    <START_DATE>08-JUN-09</START_DATE>
    <END_DATE>10-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1800</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>2.49 MILES BEFORE MO 127 N                                                                          </BEG_REF_PT>
    <END_REF_PT>1.57 MILES BEFORE MO 127 N                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>2.49 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>MO 127 N</BEG_REF_PT2>
    <END_REF_PT1>1.57 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>MO 127 N</END_REF_PT2>
    <COUNTY>PETTIS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>Y</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>2.49 MILES BEFORE MO 127 N                                                                          </START_PT>
    <END_PT>1.57 MILES BEFORE MO 127 N                                                                          </END_PT>
    <START_DATE>08-JUN-09</START_DATE>
    <END_DATE>10-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1800</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>2.49 MILES BEFORE MO 127 N                                                                          </BEG_REF_PT>
    <END_REF_PT>1.57 MILES BEFORE MO 127 N                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>2.49 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>MO 127 N</BEG_REF_PT2>
    <END_REF_PT1>1.57 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>MO 127 N</END_REF_PT2>
    <COUNTY>PETTIS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>YY</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>.64 MILES BEFORE US 65 N                                                                            </START_PT>
    <END_PT>.62 MILES BEFORE US 65 N                                                                            </END_PT>
    <START_DATE>15-JUN-09</START_DATE>
    <END_DATE>14-AUG-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.64 MILES BEFORE US 65 N                                                                            </BEG_REF_PT>
    <END_REF_PT>.62 MILES BEFORE US 65 N                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.64 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>US 65 N</BEG_REF_PT2>
    <END_REF_PT1>.62 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>US 65 N</END_REF_PT2>
    <COUNTY>SALINE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>YY</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>.62 MILES AFTER US 65 S                                                                             </START_PT>
    <END_PT>.64 MILES AFTER US 65 S                                                                             </END_PT>
    <START_DATE>15-JUN-09</START_DATE>
    <END_DATE>14-AUG-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.62 MILES AFTER US 65 S                                                                             </BEG_REF_PT>
    <END_REF_PT>.64 MILES AFTER US 65 S                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.62 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>US 65 S</BEG_REF_PT2>
    <END_REF_PT1>.64 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>US 65 S</END_REF_PT2>
    <COUNTY>SALINE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>Z</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>1.85 MILES AFTER MO 28 E                                                                            </START_PT>
    <END_PT>1.94 MILES AFTER MO 28 E                                                                            </END_PT>
    <START_DATE>22-JUN-09</START_DATE>
    <END_DATE>09-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.85 MILES AFTER MO 28 E                                                                            </BEG_REF_PT>
    <END_REF_PT>1.94 MILES AFTER MO 28 E                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.85 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>MO 28 E</BEG_REF_PT2>
    <END_REF_PT1>1.94 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>MO 28 E</END_REF_PT2>
    <COUNTY>PULASKI</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>Z</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>1.94 MILES BEFORE MO 28 W                                                                           </START_PT>
    <END_PT>1.85 MILES BEFORE MO 28 W                                                                           </END_PT>
    <START_DATE>22-JUN-09</START_DATE>
    <END_DATE>09-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.94 MILES BEFORE MO 28 W                                                                           </BEG_REF_PT>
    <END_REF_PT>1.85 MILES BEFORE MO 28 W                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.94 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>MO 28 W</BEG_REF_PT2>
    <END_REF_PT1>1.85 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>MO 28 W</END_REF_PT2>
    <COUNTY>PULASKI</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>ZZ</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>AT CRD 178 W                                                                                        </START_PT>
    <END_PT>AT RT M W                                                                                           </END_PT>
    <START_DATE>06-APR-09</START_DATE>
    <END_DATE>15-AUG-09</END_DATE>
    <WORK_TYPE>TRAFFIC CONTROL SIGNING OR LIGHT SIGNALS</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1800</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT CRD 178 W                                                                                        </BEG_REF_PT>
    <END_REF_PT>AT RT M W                                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>CRD 178 W</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>RT M W</END_REF_PT2>
    <COUNTY>GREENE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>ZZ</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>AT RT M W                                                                                           </START_PT>
    <END_PT>AT CRD 178 W                                                                                        </END_PT>
    <START_DATE>06-APR-09</START_DATE>
    <END_DATE>15-AUG-09</END_DATE>
    <WORK_TYPE>TRAFFIC CONTROL SIGNING OR LIGHT SIGNALS</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1800</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT RT M W                                                                                           </BEG_REF_PT>
    <END_REF_PT>AT CRD 178 W                                                                                        </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>RT M W</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>CRD 178 W</END_REF_PT2>
    <COUNTY>GREENE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>136</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>1.09 MILES BEFORE RT EE N                                                                           </START_PT>
    <END_PT>AT MO 13 N                                                                                          </END_PT>
    <START_DATE>15-JUN-09</START_DATE>
    <END_DATE>10-JUL-09</END_DATE>
    <WORK_TYPE>RESURFACING WITH HOT-MIX ASPHALT</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>2000</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.09 MILES BEFORE RT EE N                                                                           </BEG_REF_PT>
    <END_REF_PT>AT MO 13 N                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.09 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>RT EE N</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>MO 13 N</END_REF_PT2>
    <COUNTY>HARRISON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>160</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>.45 MILES AFTER RT Y S                                                                              </START_PT>
    <END_PT>1.03 MILES BEFORE MO 176 E                                                                          </END_PT>
    <START_DATE>26-MAY-09</START_DATE>
    <END_DATE>29-AUG-09</END_DATE>
    <WORK_TYPE>SHOULDER WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>SATURDAY</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>2000</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.45 MILES AFTER RT Y S                                                                              </BEG_REF_PT>
    <END_REF_PT>1.03 MILES BEFORE MO 176 E                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.45 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>RT Y S</BEG_REF_PT2>
    <END_REF_PT1>1.03 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>MO 176 E</END_REF_PT2>
    <COUNTY>TANEY</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>169</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>.77 MILES AFTER RT T W                                                                              </START_PT>
    <END_PT>.08 MILES AFTER US 71 N                                                                             </END_PT>
    <START_DATE>11-FEB-09</START_DATE>
    <END_DATE>31-DEC-09</END_DATE>
    <WORK_TYPE>SWEEPING AND FLUSHING PAVEMENT SURFACE</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1400</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.77 MILES AFTER RT T W                                                                              </BEG_REF_PT>
    <END_REF_PT>.08 MILES AFTER US 71 N                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.77 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>RT T W</BEG_REF_PT2>
    <END_REF_PT1>.08 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>US 71 N</END_REF_PT2>
    <COUNTY>BUCHANAN</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>169</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>.57 MILES AFTER IS 29 N                                                                             </START_PT>
    <END_PT>AT RT W N                                                                                           </END_PT>
    <START_DATE>01-JUL-09</START_DATE>
    <END_DATE>06-JUL-09</END_DATE>
    <WORK_TYPE>SHOULDER WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.57 MILES AFTER IS 29 N                                                                             </BEG_REF_PT>
    <END_REF_PT>AT RT W N                                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.57 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>IS 29 N</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>RT W N</END_REF_PT2>
    <COUNTY>ANDREW</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>169</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>AT RT W N                                                                                           </START_PT>
    <END_PT>.57 MILES BEFORE US 71 N                                                                            </END_PT>
    <START_DATE>01-JUL-09</START_DATE>
    <END_DATE>06-JUL-09</END_DATE>
    <WORK_TYPE>SHOULDER WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT RT W N                                                                                           </BEG_REF_PT>
    <END_REF_PT>.57 MILES BEFORE US 71 N                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>RT W N</BEG_REF_PT2>
    <END_REF_PT1>.57 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>US 71 N</END_REF_PT2>
    <COUNTY>ANDREW</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>169</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>.08 MILES BEFORE IS 29 N                                                                            </START_PT>
    <END_PT>.77 MILES BEFORE RT T E                                                                             </END_PT>
    <START_DATE>11-FEB-09</START_DATE>
    <END_DATE>31-DEC-09</END_DATE>
    <WORK_TYPE>SWEEPING AND FLUSHING PAVEMENT SURFACE</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1400</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.08 MILES BEFORE IS 29 N                                                                            </BEG_REF_PT>
    <END_REF_PT>.77 MILES BEFORE RT T E                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.08 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>IS 29 N</BEG_REF_PT2>
    <END_REF_PT1>.77 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>RT T E</END_REF_PT2>
    <COUNTY>BUCHANAN</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>24</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>.1 MILES BEFORE CST WINCHESTER AVE S                                                                </START_PT>
    <END_PT>.14 MILES AFTER CST WINCHESTER AVE N                                                                </END_PT>
    <START_DATE>26-MAY-09</START_DATE>
    <END_DATE>11-SEP-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0900</START_TIME>
    <END_TIME>1200</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.1 MILES BEFORE CST WINCHESTER AVE S                                                                </BEG_REF_PT>
    <END_REF_PT>.14 MILES AFTER CST WINCHESTER AVE N                                                                </END_REF_PT>
    <CLOSURE_LOCATION>LEFT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.1 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>CST WINCHESTER AVE S</BEG_REF_PT2>
    <END_REF_PT1>.14 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>CST WINCHESTER AVE N</END_REF_PT2>
    <COUNTY>JACKSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>24</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>.24 MILES AFTER CST WINNER RD E                                                                     </START_PT>
    <END_PT>.51 MILES BEFORE CST STERLING AVE S                                                                 </END_PT>
    <START_DATE>28-JAN-09</START_DATE>
    <END_DATE>15-DEC-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.24 MILES AFTER CST WINNER RD E                                                                     </BEG_REF_PT>
    <END_REF_PT>.51 MILES BEFORE CST STERLING AVE S                                                                 </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.24 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>CST WINNER RD E</BEG_REF_PT2>
    <END_REF_PT1>.51 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>CST STERLING AVE S</END_REF_PT2>
    <COUNTY>JACKSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>24</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT MO 7 N                                                                                           </START_PT>
    <END_PT>1.25 MILES BEFORE MO 224 E                                                                          </END_PT>
    <START_DATE>23-JUN-09</START_DATE>
    <END_DATE>03-JUL-09</END_DATE>
    <WORK_TYPE>PAVEMENT STRIPING</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0100</START_TIME>
    <END_TIME>2400</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT MO 7 N                                                                                           </BEG_REF_PT>
    <END_REF_PT>1.25 MILES BEFORE MO 224 E                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>MO 7 N</BEG_REF_PT2>
    <END_REF_PT1>1.25 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>MO 224 E</END_REF_PT2>
    <COUNTY>JACKSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>24</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT US 24 E                                                                                          </START_PT>
    <END_PT>AT MO 10 E                                                                                          </END_PT>
    <START_DATE>23-JUN-09</START_DATE>
    <END_DATE>03-JUL-09</END_DATE>
    <WORK_TYPE>PAVEMENT STRIPING</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0100</START_TIME>
    <END_TIME>2400</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT US 24 E                                                                                          </BEG_REF_PT>
    <END_REF_PT>AT MO 10 E                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>US 24 E</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>MO 10 E</END_REF_PT2>
    <COUNTY>LAFAYETTE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>24</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT US 65 N                                                                                          </START_PT>
    <END_PT>AT US 24 E                                                                                          </END_PT>
    <START_DATE>29-JUN-09</START_DATE>
    <END_DATE>13-JUL-09</END_DATE>
    <WORK_TYPE>MILLING AND RESURFACING ASPHALT PAVEMENT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>SATURDAY</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>00</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT US 65 N                                                                                          </BEG_REF_PT>
    <END_REF_PT>AT US 24 E                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>US 65 N</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>US 24 E</END_REF_PT2>
    <COUNTY>CARROLL</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>24</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT MO 154 E                                                                                         </START_PT>
    <END_PT>1.2 MILES BEFORE MO 15 N                                                                            </END_PT>
    <START_DATE>26-MAY-09</START_DATE>
    <END_DATE>20-JUL-09</END_DATE>
    <WORK_TYPE>SHOULDER WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1800</END_TIME>
    <NUMBER_LANES_CLOSED>00</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT MO 154 E                                                                                         </BEG_REF_PT>
    <END_REF_PT>1.2 MILES BEFORE MO 15 N                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>NONE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>MO 154 E</BEG_REF_PT2>
    <END_REF_PT1>1.2 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>MO 15 N</END_REF_PT2>
    <COUNTY>MONROE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>24</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT MO 15 N                                                                                          </START_PT>
    <END_PT>AT SP 15 S                                                                                          </END_PT>
    <START_DATE>04-MAY-09</START_DATE>
    <END_DATE>20-JUL-09</END_DATE>
    <WORK_TYPE>SHOULDER WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1800</END_TIME>
    <NUMBER_LANES_CLOSED>00</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT MO 15 N                                                                                          </BEG_REF_PT>
    <END_REF_PT>AT SP 15 S                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>NONE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>MO 15 N</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>SP 15 S</END_REF_PT2>
    <COUNTY>MONROE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>24</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>.17 MILES AFTER US 36 E                                                                             </START_PT>
    <END_PT>.52 MILES BEFORE US 36 E                                                                            </END_PT>
    <START_DATE>23-APR-09</START_DATE>
    <END_DATE>10-JUL-09</END_DATE>
    <WORK_TYPE>MILLING AND RESURFACING ASPHALT PAVEMENT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>SATURDAY</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1900</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.17 MILES AFTER US 36 E                                                                             </BEG_REF_PT>
    <END_REF_PT>.52 MILES BEFORE US 36 E                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.17 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>US 36 E</BEG_REF_PT2>
    <END_REF_PT1>.52 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>US 36 E</END_REF_PT2>
    <COUNTY>RALLS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>24</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>.51 MILES BEFORE MO 6 W                                                                             </START_PT>
    <END_PT>.74 MILES AFTER US 61 N                                                                             </END_PT>
    <START_DATE>01-JUN-09</START_DATE>
    <END_DATE>25-SEP-09</END_DATE>
    <WORK_TYPE>RESURFACING WITH HOT-MIX ASPHALT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>SATURDAY</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1900</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.51 MILES BEFORE MO 6 W                                                                             </BEG_REF_PT>
    <END_REF_PT>.74 MILES AFTER US 61 N                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.51 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>MO 6 W</BEG_REF_PT2>
    <END_REF_PT1>.74 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>US 61 N</END_REF_PT2>
    <COUNTY>MARION</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>24</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>.51 MILES BEFORE MO 6 W                                                                             </START_PT>
    <END_PT>AT BU 61 S                                                                                          </END_PT>
    <START_DATE>01-JUN-09</START_DATE>
    <END_DATE>25-SEP-09</END_DATE>
    <WORK_TYPE>RESURFACING WITH HOT-MIX ASPHALT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>SATURDAY</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1900</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.51 MILES BEFORE MO 6 W                                                                             </BEG_REF_PT>
    <END_REF_PT>AT BU 61 S                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.51 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>MO 6 W</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>BU 61 S</END_REF_PT2>
    <COUNTY>MARION</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>24</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>.74 MILES BEFORE US 61 N                                                                            </START_PT>
    <END_PT>.51 MILES AFTER MO 6 E                                                                              </END_PT>
    <START_DATE>01-JUN-09</START_DATE>
    <END_DATE>25-SEP-09</END_DATE>
    <WORK_TYPE>RESURFACING WITH HOT-MIX ASPHALT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>SATURDAY</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1900</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.74 MILES BEFORE US 61 N                                                                            </BEG_REF_PT>
    <END_REF_PT>.51 MILES AFTER MO 6 E                                                                              </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.74 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>US 61 N</BEG_REF_PT2>
    <END_REF_PT1>.51 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>MO 6 E</END_REF_PT2>
    <COUNTY>MARION</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>24</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>1.2 MILES AFTER MO 15 S                                                                             </START_PT>
    <END_PT>AT MO 154 E                                                                                         </END_PT>
    <START_DATE>26-MAY-09</START_DATE>
    <END_DATE>20-JUL-09</END_DATE>
    <WORK_TYPE>SHOULDER WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1800</END_TIME>
    <NUMBER_LANES_CLOSED>00</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.2 MILES AFTER MO 15 S                                                                             </BEG_REF_PT>
    <END_REF_PT>AT MO 154 E                                                                                         </END_REF_PT>
    <CLOSURE_LOCATION>NONE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.2 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>MO 15 S</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>MO 154 E</END_REF_PT2>
    <COUNTY>MONROE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>24</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>AT BU 65 N                                                                                          </START_PT>
    <END_PT>AT US 65 S                                                                                          </END_PT>
    <START_DATE>29-JUN-09</START_DATE>
    <END_DATE>13-JUL-09</END_DATE>
    <WORK_TYPE>MILLING AND RESURFACING ASPHALT PAVEMENT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>SATURDAY</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>00</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT BU 65 N                                                                                          </BEG_REF_PT>
    <END_REF_PT>AT US 65 S                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>BU 65 N</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>US 65 S</END_REF_PT2>
    <COUNTY>CARROLL</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>24</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>1.25 MILES AFTER MO 224 W                                                                           </START_PT>
    <END_PT>AT MO 7 N                                                                                           </END_PT>
    <START_DATE>23-JUN-09</START_DATE>
    <END_DATE>03-JUL-09</END_DATE>
    <WORK_TYPE>PAVEMENT STRIPING</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0100</START_TIME>
    <END_TIME>2400</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.25 MILES AFTER MO 224 W                                                                           </BEG_REF_PT>
    <END_REF_PT>AT MO 7 N                                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.25 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>MO 224 W</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>MO 7 N</END_REF_PT2>
    <COUNTY>JACKSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>24</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>.52 MILES AFTER CST STERLING AVE N                                                                  </START_PT>
    <END_PT>.24 MILES BEFORE CST WINNER RD W                                                                    </END_PT>
    <START_DATE>28-JAN-09</START_DATE>
    <END_DATE>15-DEC-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.52 MILES AFTER CST STERLING AVE N                                                                  </BEG_REF_PT>
    <END_REF_PT>.24 MILES BEFORE CST WINNER RD W                                                                    </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.52 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>CST STERLING AVE N</BEG_REF_PT2>
    <END_REF_PT1>.24 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>CST WINNER RD W</END_REF_PT2>
    <COUNTY>JACKSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>24</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>.14 MILES BEFORE CST WINCHESTER AVE S                                                               </START_PT>
    <END_PT>.1 MILES AFTER CST WINCHESTER AVE N                                                                 </END_PT>
    <START_DATE>26-MAY-09</START_DATE>
    <END_DATE>11-SEP-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0900</START_TIME>
    <END_TIME>1200</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.14 MILES BEFORE CST WINCHESTER AVE S                                                               </BEG_REF_PT>
    <END_REF_PT>.1 MILES AFTER CST WINCHESTER AVE N                                                                 </END_REF_PT>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.14 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>CST WINCHESTER AVE S</BEG_REF_PT2>
    <END_REF_PT1>.1 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>CST WINCHESTER AVE N</END_REF_PT2>
    <COUNTY>JACKSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>24</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>.05 MILES BEFORE US 71 N                                                                            </START_PT>
    <END_PT>AT US 71 N                                                                                          </END_PT>
    <START_DATE>20-MAY-09</START_DATE>
    <END_DATE>31-JUL-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0900</START_TIME>
    <END_TIME>1500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.05 MILES BEFORE US 71 N                                                                            </BEG_REF_PT>
    <END_REF_PT>AT US 71 N                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.05 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>US 71 N</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>US 71 N</END_REF_PT2>
    <COUNTY>JACKSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>275</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>AT US 136 W                                                                                         </START_PT>
    <END_PT>8.01 MILES AFTER RT T S                                                                             </END_PT>
    <START_DATE>01-JUN-09</START_DATE>
    <END_DATE>31-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>2000</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT US 136 W                                                                                         </BEG_REF_PT>
    <END_REF_PT>8.01 MILES AFTER RT T S                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>US 136 W</BEG_REF_PT2>
    <END_REF_PT1>8.01 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT T S</END_REF_PT2>
    <COUNTY>ATCHISON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>275</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>AT US 136 W                                                                                         </START_PT>
    <END_PT>8.01 MILES AFTER RT T S                                                                             </END_PT>
    <START_DATE>01-JUN-09</START_DATE>
    <END_DATE>31-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>2000</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT US 136 W                                                                                         </BEG_REF_PT>
    <END_REF_PT>8.01 MILES AFTER RT T S                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>US 136 W</BEG_REF_PT2>
    <END_REF_PT1>8.01 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT T S</END_REF_PT2>
    <COUNTY>ATCHISON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>36</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>.2 MILES BEFORE MO 759 S                                                                            </START_PT>
    <END_PT>1.53 MILES BEFORE RT Z S                                                                            </END_PT>
    <START_DATE>11-FEB-09</START_DATE>
    <END_DATE>31-DEC-09</END_DATE>
    <WORK_TYPE>SWEEPING AND FLUSHING PAVEMENT SURFACE</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1400</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.2 MILES BEFORE MO 759 S                                                                            </BEG_REF_PT>
    <END_REF_PT>1.53 MILES BEFORE RT Z S                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.2 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>MO 759 S</BEG_REF_PT2>
    <END_REF_PT1>1.53 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>RT Z S</END_REF_PT2>
    <COUNTY>BUCHANAN</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>36</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT CST RIVERSIDE RD N                                                                               </START_PT>
    <END_PT>2.13 MILES AFTER RT AC S                                                                            </END_PT>
    <START_DATE>23-JUN-09</START_DATE>
    <END_DATE>16-JUL-09</END_DATE>
    <WORK_TYPE>PAVEMENT REPAIR OF CONCRETE PAVEMENT</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT CST RIVERSIDE RD N                                                                               </BEG_REF_PT>
    <END_REF_PT>2.13 MILES AFTER RT AC S                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>CST RIVERSIDE RD N</BEG_REF_PT2>
    <END_REF_PT1>2.13 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT AC S</END_REF_PT2>
    <COUNTY>BUCHANAN</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>36</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>.99 MILES AFTER RT C N                                                                              </START_PT>
    <END_PT>.97 MILES BEFORE MO 31 S                                                                            </END_PT>
    <START_DATE>23-MAR-09</START_DATE>
    <END_DATE>30-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0800</START_TIME>
    <END_TIME>0800</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.99 MILES AFTER RT C N                                                                              </BEG_REF_PT>
    <END_REF_PT>.97 MILES BEFORE MO 31 S                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>LEFT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.99 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>RT C N</BEG_REF_PT2>
    <END_REF_PT1>.97 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>MO 31 S</END_REF_PT2>
    <COUNTY>BUCHANAN</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>36</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>.09 MILES AFTER CRD KELLOGG AVE S                                                                   </START_PT>
    <END_PT>.35 MILES AFTER BU 36 W                                                                             </END_PT>
    <START_DATE>01-JAN-09</START_DATE>
    <END_DATE>31-DEC-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0100</START_TIME>
    <END_TIME>2400</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.09 MILES AFTER CRD KELLOGG AVE S                                                                   </BEG_REF_PT>
    <END_REF_PT>.35 MILES AFTER BU 36 W                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.09 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>CRD KELLOGG AVE S</BEG_REF_PT2>
    <END_REF_PT1>.35 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>BU 36 W</END_REF_PT2>
    <COUNTY>MACON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>36</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>LESS THAN .01 MILES BEFORE BU 36 W                                                                  </START_PT>
    <END_PT>AT BU 36 W                                                                                          </END_PT>
    <START_DATE>23-JUN-09</START_DATE>
    <END_DATE>21-JUL-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0100</START_TIME>
    <END_TIME>2400</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>LESS THAN .01 MILES BEFORE BU 36 W                                                                  </BEG_REF_PT>
    <END_REF_PT>AT BU 36 W                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>LESS THAN .01 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>BU 36 W</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>BU 36 W</END_REF_PT2>
    <COUNTY>MACON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>36</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>.87 MILES BEFORE BU 36 W                                                                            </START_PT>
    <END_PT>.24 MILES BEFORE US 24 W                                                                            </END_PT>
    <START_DATE>29-OCT-08</START_DATE>
    <END_DATE>16-NOV-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>SATURDAY</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1900</END_TIME>
    <NUMBER_LANES_CLOSED>00</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.87 MILES BEFORE BU 36 W                                                                            </BEG_REF_PT>
    <END_REF_PT>.24 MILES BEFORE US 24 W                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>NONE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.87 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>BU 36 W</BEG_REF_PT2>
    <END_REF_PT1>.24 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>US 24 W</END_REF_PT2>
    <COUNTY>SHELBY</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>36</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>.24 MILES AFTER RT Z N                                                                              </START_PT>
    <END_PT>.87 MILES AFTER BU 36 E                                                                             </END_PT>
    <START_DATE>29-OCT-08</START_DATE>
    <END_DATE>16-NOV-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>SATURDAY</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1900</END_TIME>
    <NUMBER_LANES_CLOSED>00</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.24 MILES AFTER RT Z N                                                                              </BEG_REF_PT>
    <END_REF_PT>.87 MILES AFTER BU 36 E                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>NONE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.24 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>RT Z N</BEG_REF_PT2>
    <END_REF_PT1>.87 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>BU 36 E</END_REF_PT2>
    <COUNTY>MARION</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>36</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>.35 MILES BEFORE BU 36 W                                                                            </START_PT>
    <END_PT>.09 MILES BEFORE CRD KELLOGG AVE N                                                                  </END_PT>
    <START_DATE>01-JAN-09</START_DATE>
    <END_DATE>31-DEC-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0100</START_TIME>
    <END_TIME>2400</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.35 MILES BEFORE BU 36 W                                                                            </BEG_REF_PT>
    <END_REF_PT>.09 MILES BEFORE CRD KELLOGG AVE N                                                                  </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.35 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>BU 36 W</BEG_REF_PT2>
    <END_REF_PT1>.09 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>CRD KELLOGG AVE N</END_REF_PT2>
    <COUNTY>SHELBY</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>36</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>.96 MILES AFTER MO 31 S                                                                             </START_PT>
    <END_PT>.98 MILES BEFORE RT C S                                                                             </END_PT>
    <START_DATE>23-MAR-09</START_DATE>
    <END_DATE>30-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0800</START_TIME>
    <END_TIME>0800</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.96 MILES AFTER MO 31 S                                                                             </BEG_REF_PT>
    <END_REF_PT>.98 MILES BEFORE RT C S                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>LEFT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.96 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>MO 31 S</BEG_REF_PT2>
    <END_REF_PT1>.98 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>RT C S</END_REF_PT2>
    <COUNTY>BUCHANAN</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>36</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>1.54 MILES AFTER RT C S                                                                             </START_PT>
    <END_PT>.21 MILES AFTER MO 759 S                                                                            </END_PT>
    <START_DATE>11-FEB-09</START_DATE>
    <END_DATE>31-DEC-09</END_DATE>
    <WORK_TYPE>SWEEPING AND FLUSHING PAVEMENT SURFACE</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1400</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.54 MILES AFTER RT C S                                                                             </BEG_REF_PT>
    <END_REF_PT>.21 MILES AFTER MO 759 S                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.54 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>RT C S</BEG_REF_PT2>
    <END_REF_PT1>.21 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>MO 759 S</END_REF_PT2>
    <COUNTY>BUCHANAN</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>40</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT CST NOLAND RD N                                                                                  </START_PT>
    <END_PT>.49 MILES AFTER CST LITTLE BLUE PKWY S                                                              </END_PT>
    <START_DATE>01-JUL-09</START_DATE>
    <END_DATE>06-JUL-09</END_DATE>
    <WORK_TYPE>ROADSIDE MAINTENANCE</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0900</START_TIME>
    <END_TIME>1500</END_TIME>
    <NUMBER_LANES_CLOSED>00</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT CST NOLAND RD N                                                                                  </BEG_REF_PT>
    <END_REF_PT>.49 MILES AFTER CST LITTLE BLUE PKWY S                                                              </END_REF_PT>
    <CLOSURE_LOCATION>NONE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>CST NOLAND RD N</BEG_REF_PT2>
    <END_REF_PT1>.49 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>CST LITTLE BLUE PKWY S</END_REF_PT2>
    <COUNTY>JACKSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>40</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT US 40 E                                                                                          </START_PT>
    <END_PT>LESS THAN .01 MILES BEFORE IS 70 W                                                                  </END_PT>
    <START_DATE>02-JUN-09</START_DATE>
    <END_DATE>07-AUG-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1800</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT US 40 E                                                                                          </BEG_REF_PT>
    <END_REF_PT>LESS THAN .01 MILES BEFORE IS 70 W                                                                  </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>US 40 E</BEG_REF_PT2>
    <END_REF_PT1>LESS THAN .01 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>IS 70 W</END_REF_PT2>
    <COUNTY>COOPER</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>40</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>.48 MILES BEFORE CST LITTLE BLUE PKWY N                                                             </START_PT>
    <END_PT>AT CST NOLAND RD N                                                                                  </END_PT>
    <START_DATE>01-JUL-09</START_DATE>
    <END_DATE>06-JUL-09</END_DATE>
    <WORK_TYPE>ROADSIDE MAINTENANCE</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0900</START_TIME>
    <END_TIME>1500</END_TIME>
    <NUMBER_LANES_CLOSED>00</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.48 MILES BEFORE CST LITTLE BLUE PKWY N                                                             </BEG_REF_PT>
    <END_REF_PT>AT CST NOLAND RD N                                                                                  </END_REF_PT>
    <CLOSURE_LOCATION>NONE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.48 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>CST LITTLE BLUE PKWY N</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>CST NOLAND RD N</END_REF_PT2>
    <COUNTY>JACKSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>50</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>.14 MILES BEFORE MO 150 E                                                                           </START_PT>
    <END_PT>AT RT F S                                                                                           </END_PT>
    <START_DATE>01-JUL-09</START_DATE>
    <END_DATE>06-JUL-09</END_DATE>
    <WORK_TYPE>ROADSIDE MAINTENANCE</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0800</START_TIME>
    <END_TIME>1500</END_TIME>
    <NUMBER_LANES_CLOSED>00</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.14 MILES BEFORE MO 150 E                                                                           </BEG_REF_PT>
    <END_REF_PT>AT RT F S                                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>NONE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.14 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>MO 150 E</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>RT F S</END_REF_PT2>
    <COUNTY>JACKSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>50</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>1.79 MILES BEFORE MO 131 S                                                                          </START_PT>
    <END_PT>AT MO 13 N                                                                                          </END_PT>
    <START_DATE>01-JUL-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>PAVEMENT REPAIR OF CONCRETE PAVEMENT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>1200</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.79 MILES BEFORE MO 131 S                                                                          </BEG_REF_PT>
    <END_REF_PT>AT MO 13 N                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.79 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>MO 131 S</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>MO 13 N</END_REF_PT2>
    <COUNTY>JOHNSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>50</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>1.41 MILES AFTER BU 50 E                                                                            </START_PT>
    <END_PT>3.41 MILES AFTER BU 50 E                                                                            </END_PT>
    <START_DATE>03-JUN-09</START_DATE>
    <END_DATE>01-DEC-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.41 MILES AFTER BU 50 E                                                                            </BEG_REF_PT>
    <END_REF_PT>3.41 MILES AFTER BU 50 E                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.41 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>BU 50 E</BEG_REF_PT2>
    <END_REF_PT1>3.41 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>BU 50 E</END_REF_PT2>
    <COUNTY>JOHNSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>50</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT MO 19 S                                                                                          </START_PT>
    <END_PT>.14 MILES AFTER RT T N                                                                              </END_PT>
    <START_DATE>15-JUN-09</START_DATE>
    <END_DATE>17-JUL-09</END_DATE>
    <WORK_TYPE>RESURFACING WITH HOT-MIX ASPHALT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1900</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT MO 19 S                                                                                          </BEG_REF_PT>
    <END_REF_PT>.14 MILES AFTER RT T N                                                                              </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>MO 19 S</BEG_REF_PT2>
    <END_REF_PT1>.14 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT T N</END_REF_PT2>
    <COUNTY>GASCONADE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>50</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>.07 MILES AFTER RT AT E                                                                             </START_PT>
    <END_PT>AT IS 44 E                                                                                          </END_PT>
    <START_DATE>13-MAY-09</START_DATE>
    <END_DATE>31-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0100</START_TIME>
    <END_TIME>2400</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.07 MILES AFTER RT AT E                                                                             </BEG_REF_PT>
    <END_REF_PT>AT IS 44 E                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.07 MILES AFTER RT AT E</BEG_REF_PT1>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>IS 44 E</END_REF_PT2>
    <COUNTY>FRANKLIN</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>50</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>.14 MILES BEFORE RT T S                                                                             </START_PT>
    <END_PT>AT MO 19 S                                                                                          </END_PT>
    <START_DATE>15-JUN-09</START_DATE>
    <END_DATE>17-JUL-09</END_DATE>
    <WORK_TYPE>RESURFACING WITH HOT-MIX ASPHALT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1900</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.14 MILES BEFORE RT T S                                                                             </BEG_REF_PT>
    <END_REF_PT>AT MO 19 S                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.14 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>RT T S</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>MO 19 S</END_REF_PT2>
    <COUNTY>GASCONADE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>50</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>3.14 MILES BEFORE BU 50 W                                                                           </START_PT>
    <END_PT>1.13 MILES BEFORE BU 50 W                                                                           </END_PT>
    <START_DATE>03-JUN-09</START_DATE>
    <END_DATE>01-DEC-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>3.14 MILES BEFORE BU 50 W                                                                           </BEG_REF_PT>
    <END_REF_PT>1.13 MILES BEFORE BU 50 W                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>NONE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>3.14 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>BU 50 W</BEG_REF_PT2>
    <END_REF_PT1>1.13 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>BU 50 W</END_REF_PT2>
    <COUNTY>JOHNSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>50</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>AT RT F S                                                                                           </START_PT>
    <END_PT>.14 MILES AFTER MO 150 W                                                                            </END_PT>
    <START_DATE>01-JUL-09</START_DATE>
    <END_DATE>06-JUL-09</END_DATE>
    <WORK_TYPE>ROADSIDE MAINTENANCE</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0800</START_TIME>
    <END_TIME>1500</END_TIME>
    <NUMBER_LANES_CLOSED>00</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT RT F S                                                                                           </BEG_REF_PT>
    <END_REF_PT>.14 MILES AFTER MO 150 W                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>NONE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>RT F S</BEG_REF_PT2>
    <END_REF_PT1>.14 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>MO 150 W</END_REF_PT2>
    <COUNTY>JACKSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>54</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT BU 54 W                                                                                          </START_PT>
    <END_PT>1.52 MILES AFTER BU 54 E                                                                            </END_PT>
    <START_DATE>01-JUN-09</START_DATE>
    <END_DATE>31-JUL-09</END_DATE>
    <WORK_TYPE>ROADSIDE MAINTENANCE</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0800</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT BU 54 W                                                                                          </BEG_REF_PT>
    <END_REF_PT>1.52 MILES AFTER BU 54 E                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>BU 54 W</BEG_REF_PT2>
    <END_REF_PT1>1.52 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>BU 54 E</END_REF_PT2>
    <COUNTY>MILLER</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>54</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>1.4 MILES AFTER RT BB S                                                                             </START_PT>
    <END_PT>LESS THAN .01 MILES BEFORE BU 54 E                                                                  </END_PT>
    <START_DATE>11-JUN-09</START_DATE>
    <END_DATE>01-DEC-09</END_DATE>
    <WORK_TYPE>SHOULDER WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.4 MILES AFTER RT BB S                                                                             </BEG_REF_PT>
    <END_REF_PT>LESS THAN .01 MILES BEFORE BU 54 E                                                                  </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.4 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>RT BB S</BEG_REF_PT2>
    <END_REF_PT1>LESS THAN .01 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>BU 54 E</END_REF_PT2>
    <COUNTY>CALLAWAY</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>54</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>1.71 MILES AFTER BU 54 E                                                                            </START_PT>
    <END_PT>.88 MILES BEFORE IS 70 E                                                                            </END_PT>
    <START_DATE>01-JUL-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>SHOULDER WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.71 MILES AFTER BU 54 E                                                                            </BEG_REF_PT>
    <END_REF_PT>.88 MILES BEFORE IS 70 E                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.71 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>BU 54 E</BEG_REF_PT2>
    <END_REF_PT1>.88 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>IS 70 E</END_REF_PT2>
    <COUNTY>CALLAWAY</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>54</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>.7 MILES BEFORE MO 19 S                                                                             </START_PT>
    <END_PT>1.01 MILES AFTER RT BB W                                                                            </END_PT>
    <START_DATE>08-JUN-09</START_DATE>
    <END_DATE>14-AUG-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>00</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.7 MILES BEFORE MO 19 S                                                                             </BEG_REF_PT>
    <END_REF_PT>1.01 MILES AFTER RT BB W                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>NONE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.7 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>MO 19 S</BEG_REF_PT2>
    <END_REF_PT1>1.01 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT BB W</END_REF_PT2>
    <COUNTY>AUDRAIN</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>54</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>1.01 MILES BEFORE MO 19 S                                                                           </START_PT>
    <END_PT>.7 MILES AFTER RT BB W                                                                              </END_PT>
    <START_DATE>08-JUN-09</START_DATE>
    <END_DATE>14-AUG-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>00</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.01 MILES BEFORE MO 19 S                                                                           </BEG_REF_PT>
    <END_REF_PT>.7 MILES AFTER RT BB W                                                                              </END_REF_PT>
    <CLOSURE_LOCATION>NONE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.01 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>MO 19 S</BEG_REF_PT2>
    <END_REF_PT1>.7 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT BB W</END_REF_PT2>
    <COUNTY>AUDRAIN</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>54</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>1.1 MILES AFTER RT H E                                                                              </START_PT>
    <END_PT>AT CST CENTER ST E                                                                                  </END_PT>
    <START_DATE>28-MAY-09</START_DATE>
    <END_DATE>01-DEC-09</END_DATE>
    <WORK_TYPE>SHOULDER WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.1 MILES AFTER RT H E                                                                              </BEG_REF_PT>
    <END_REF_PT>AT CST CENTER ST E                                                                                  </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.1 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>RT H E</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>CST CENTER ST E</END_REF_PT2>
    <COUNTY>CALLAWAY</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>54</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>1.51 MILES BEFORE BU 54 W                                                                           </START_PT>
    <END_PT>LESS THAN .01 MILES BEFORE BU 54 W                                                                  </END_PT>
    <START_DATE>01-JUN-09</START_DATE>
    <END_DATE>31-JUL-09</END_DATE>
    <WORK_TYPE>ROADSIDE MAINTENANCE</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0800</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.51 MILES BEFORE BU 54 W                                                                           </BEG_REF_PT>
    <END_REF_PT>LESS THAN .01 MILES BEFORE BU 54 W                                                                  </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.51 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>BU 54 W</BEG_REF_PT2>
    <END_REF_PT1>LESS THAN .01 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>BU 54 W</END_REF_PT2>
    <COUNTY>MILLER</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>54</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>1.82 MILES AFTER MO 42 E                                                                            </START_PT>
    <END_PT>1.99 MILES AFTER MO 42 E                                                                            </END_PT>
    <START_DATE>30-JUN-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>TRAFFIC CONTROL SIGNING OR LIGHT SIGNALS</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0800</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.82 MILES AFTER MO 42 E                                                                            </BEG_REF_PT>
    <END_REF_PT>1.99 MILES AFTER MO 42 E                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.82 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>MO 42 E</BEG_REF_PT2>
    <END_REF_PT1>1.99 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>MO 42 E</END_REF_PT2>
    <COUNTY>CAMDEN</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>60</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT MO 43 N                                                                                          </START_PT>
    <END_PT>AT US 71 S                                                                                          </END_PT>
    <START_DATE>07-JUN-09</START_DATE>
    <END_DATE>11-JUL-09</END_DATE>
    <WORK_TYPE>MILLING AND RESURFACING ASPHALT PAVEMENT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0500</START_TIME>
    <END_TIME>2100</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT MO 43 N                                                                                          </BEG_REF_PT>
    <END_REF_PT>AT US 71 S                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>MO 43 N</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>US 71 S</END_REF_PT2>
    <COUNTY>NEWTON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>60</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT RT Z S                                                                                           </START_PT>
    <END_PT>2.72 MILES BEFORE RT C N                                                                            </END_PT>
    <START_DATE>01-JUL-09</START_DATE>
    <END_DATE>31-JUL-09</END_DATE>
    <WORK_TYPE>PATCHING OF ASPHALT PAVEMENT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT RT Z S                                                                                           </BEG_REF_PT>
    <END_REF_PT>2.72 MILES BEFORE RT C N                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>RT Z S</BEG_REF_PT2>
    <END_REF_PT1>2.72 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>RT C N</END_REF_PT2>
    <COUNTY>WEBSTER</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>60</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>3.72 MILES AFTER RT T S                                                                             </START_PT>
    <END_PT>AT MO 99 N                                                                                          </END_PT>
    <START_DATE>29-JUN-09</START_DATE>
    <END_DATE>09-JUL-09</END_DATE>
    <WORK_TYPE>UNBONDED CONCRETE OVERLAY</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>3.72 MILES AFTER RT T S                                                                             </BEG_REF_PT>
    <END_REF_PT>AT MO 99 N                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>3.72 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>RT T S</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>MO 99 N</END_REF_PT2>
    <COUNTY>SHANNON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>60</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>3.67 MILES BEFORE RT J N                                                                            </START_PT>
    <END_PT>1.06 MILES BEFORE RT J N                                                                            </END_PT>
    <START_DATE>12-MAR-09</START_DATE>
    <END_DATE>23-JUL-09</END_DATE>
    <WORK_TYPE>PAVEMENT STRIPING</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>3.67 MILES BEFORE RT J N                                                                            </BEG_REF_PT>
    <END_REF_PT>1.06 MILES BEFORE RT J N                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>3.67 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>RT J N</BEG_REF_PT2>
    <END_REF_PT1>1.06 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>RT J N</END_REF_PT2>
    <COUNTY>CARTER</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>60</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>.51 MILES BEFORE RT J N                                                                             </START_PT>
    <END_PT>AT RT J N                                                                                           </END_PT>
    <START_DATE>04-MAY-09</START_DATE>
    <END_DATE>17-JUL-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.51 MILES BEFORE RT J N                                                                             </BEG_REF_PT>
    <END_REF_PT>AT RT J N                                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.51 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>RT J N</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>RT J N</END_REF_PT2>
    <COUNTY>CARTER</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>60</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>AT RT J N                                                                                           </START_PT>
    <END_PT>.52 MILES AFTER RT J S                                                                              </END_PT>
    <START_DATE>04-MAY-09</START_DATE>
    <END_DATE>17-JUL-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT RT J N                                                                                           </BEG_REF_PT>
    <END_REF_PT>.52 MILES AFTER RT J S                                                                              </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>RT J N</BEG_REF_PT2>
    <END_REF_PT1>.52 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT J S</END_REF_PT2>
    <COUNTY>CARTER</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>60</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>AT MO 99 N                                                                                          </START_PT>
    <END_PT>3.72 MILES BEFORE RT T N                                                                            </END_PT>
    <START_DATE>29-JUN-09</START_DATE>
    <END_DATE>09-JUL-09</END_DATE>
    <WORK_TYPE>UNBONDED CONCRETE OVERLAY</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT MO 99 N                                                                                          </BEG_REF_PT>
    <END_REF_PT>3.72 MILES BEFORE RT T N                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>MO 99 N</BEG_REF_PT2>
    <END_REF_PT1>3.72 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>RT T N</END_REF_PT2>
    <COUNTY>SHANNON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>60</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>AT US 71 S                                                                                          </START_PT>
    <END_PT>AT MO 43 N                                                                                          </END_PT>
    <START_DATE>07-JUN-09</START_DATE>
    <END_DATE>11-JUL-09</END_DATE>
    <WORK_TYPE>MILLING AND RESURFACING ASPHALT PAVEMENT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0500</START_TIME>
    <END_TIME>2100</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT US 71 S                                                                                          </BEG_REF_PT>
    <END_REF_PT>AT MO 43 N                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>US 71 S</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>MO 43 N</END_REF_PT2>
    <COUNTY>NEWTON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>61</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>AT RT HH W                                                                                          </START_PT>
    <END_PT>1.37 MILES AFTER RT ZZ W                                                                            </END_PT>
    <START_DATE>23-JUN-09</START_DATE>
    <END_DATE>01-AUG-09</END_DATE>
    <WORK_TYPE>SHOULDER WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT RT HH W                                                                                          </BEG_REF_PT>
    <END_REF_PT>1.37 MILES AFTER RT ZZ W                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>RT HH W</BEG_REF_PT2>
    <END_REF_PT1>1.37 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT ZZ W</END_REF_PT2>
    <COUNTY>SCOTT</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>61</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>AT RT M E                                                                                           </START_PT>
    <END_PT>.15 MILES AFTER US 61 N                                                                             </END_PT>
    <START_DATE>12-JUN-09</START_DATE>
    <END_DATE>15-JUL-09</END_DATE>
    <WORK_TYPE>NEW PAVEMENT CONSTRUCTION</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0800</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT RT M E                                                                                           </BEG_REF_PT>
    <END_REF_PT>.15 MILES AFTER US 61 N                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>LEFT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>RT M E</BEG_REF_PT2>
    <END_REF_PT1>.15 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>US 61 N</END_REF_PT2>
    <COUNTY>SCOTT</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>61</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>AT MO 25 N                                                                                          </START_PT>
    <END_PT>1.37 MILES BEFORE RT Y W                                                                            </END_PT>
    <START_DATE>02-JUN-09</START_DATE>
    <END_DATE>11-SEP-09</END_DATE>
    <WORK_TYPE>SHOULDER WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1900</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT MO 25 N                                                                                          </BEG_REF_PT>
    <END_REF_PT>1.37 MILES BEFORE RT Y W                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>MO 25 N</BEG_REF_PT2>
    <END_REF_PT1>1.37 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>RT Y W</END_REF_PT2>
    <COUNTY>CAPE GIRARDEAU</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>61</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>1.37 MILES BEFORE RT Y W                                                                            </START_PT>
    <END_PT>.88 MILES BEFORE RT Y W                                                                             </END_PT>
    <START_DATE>04-MAY-09</START_DATE>
    <END_DATE>14-AUG-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1500</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.37 MILES BEFORE RT Y W                                                                            </BEG_REF_PT>
    <END_REF_PT>.88 MILES BEFORE RT Y W                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>LEFT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.37 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>RT Y W</BEG_REF_PT2>
    <END_REF_PT1>.88 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>RT Y W</END_REF_PT2>
    <COUNTY>STE. GENEVIEVE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>61</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>.18 MILES BEFORE RT OO W                                                                            </START_PT>
    <END_PT>.36 MILES BEFORE RT TT S                                                                            </END_PT>
    <START_DATE>27-JUN-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>UNBONDED CONCRETE OVERLAY</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>SATURDAY</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.18 MILES BEFORE RT OO W                                                                            </BEG_REF_PT>
    <END_REF_PT>.36 MILES BEFORE RT TT S                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.18 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>RT OO W</BEG_REF_PT2>
    <END_REF_PT1>.36 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>RT TT S</END_REF_PT2>
    <COUNTY>STE. GENEVIEVE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>61</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>2.6 MILES AFTER RT TT N                                                                             </START_PT>
    <END_PT>1.57 MILES BEFORE IS 55 N                                                                           </END_PT>
    <START_DATE>15-JUN-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>SHOULDER WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>2.6 MILES AFTER RT TT N                                                                             </BEG_REF_PT>
    <END_REF_PT>1.57 MILES BEFORE IS 55 N                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>2.6 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>RT TT N</BEG_REF_PT2>
    <END_REF_PT1>1.57 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>IS 55 N</END_REF_PT2>
    <COUNTY>JEFFERSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>61</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>.5 MILES BEFORE CST CLAYTON RD E                                                                    </START_PT>
    <END_PT>AT IS 64 E                                                                                          </END_PT>
    <START_DATE>02-JUL-09</START_DATE>
    <END_DATE>07-JUL-09</END_DATE>
    <WORK_TYPE>SHOULDER WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0900</START_TIME>
    <END_TIME>1500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.5 MILES BEFORE CST CLAYTON RD E                                                                    </BEG_REF_PT>
    <END_REF_PT>AT IS 64 E                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.5 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>CST CLAYTON RD E</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>IS 64 E</END_REF_PT2>
    <COUNTY>ST. LOUIS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>61</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>.78 MILES BEFORE RT U E                                                                             </START_PT>
    <END_PT>.62 MILES AFTER RT U W                                                                              </END_PT>
    <START_DATE>23-MAR-09</START_DATE>
    <END_DATE>06-NOV-09</END_DATE>
    <WORK_TYPE>ROADSIDE MAINTENANCE</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>00</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.78 MILES BEFORE RT U E                                                                             </BEG_REF_PT>
    <END_REF_PT>.62 MILES AFTER RT U W                                                                              </END_REF_PT>
    <CLOSURE_LOCATION>NONE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.78 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>RT U E</BEG_REF_PT2>
    <END_REF_PT1>.62 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT U W</END_REF_PT2>
    <COUNTY>LINCOLN</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>61</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>AT BU 61 S                                                                                          </START_PT>
    <END_PT>.51 MILES AFTER MO 6 E                                                                              </END_PT>
    <START_DATE>01-JUN-09</START_DATE>
    <END_DATE>25-SEP-09</END_DATE>
    <WORK_TYPE>RESURFACING WITH HOT-MIX ASPHALT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>SATURDAY</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1900</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT BU 61 S                                                                                          </BEG_REF_PT>
    <END_REF_PT>.51 MILES AFTER MO 6 E                                                                              </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>BU 61 S</BEG_REF_PT2>
    <END_REF_PT1>.51 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>MO 6 E</END_REF_PT2>
    <COUNTY>LEWIS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>61</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>.62 MILES BEFORE RT U W                                                                             </START_PT>
    <END_PT>.78 MILES AFTER RT U E                                                                              </END_PT>
    <START_DATE>23-MAR-09</START_DATE>
    <END_DATE>06-NOV-09</END_DATE>
    <WORK_TYPE>ROADSIDE MAINTENANCE</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>00</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.62 MILES BEFORE RT U W                                                                             </BEG_REF_PT>
    <END_REF_PT>.78 MILES AFTER RT U E                                                                              </END_REF_PT>
    <CLOSURE_LOCATION>NONE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.62 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>RT U W</BEG_REF_PT2>
    <END_REF_PT1>.78 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT U E</END_REF_PT2>
    <COUNTY>LINCOLN</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>61</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>1.57 MILES AFTER IS 55 N                                                                            </START_PT>
    <END_PT>2.6 MILES BEFORE RT TT S                                                                            </END_PT>
    <START_DATE>15-JUN-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>SHOULDER WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.57 MILES AFTER IS 55 N                                                                            </BEG_REF_PT>
    <END_REF_PT>2.6 MILES BEFORE RT TT S                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.57 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>IS 55 N</BEG_REF_PT2>
    <END_REF_PT1>2.6 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>RT TT S</END_REF_PT2>
    <COUNTY>JEFFERSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>61</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>.36 MILES AFTER RT TT N                                                                             </START_PT>
    <END_PT>.18 MILES AFTER RT OO E                                                                             </END_PT>
    <START_DATE>27-JUN-09</START_DATE>
    <END_DATE>03-JUL-09</END_DATE>
    <WORK_TYPE>UNBONDED CONCRETE OVERLAY</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>SATURDAY</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>0300</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.36 MILES AFTER RT TT N                                                                             </BEG_REF_PT>
    <END_REF_PT>.18 MILES AFTER RT OO E                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.36 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>RT TT N</BEG_REF_PT2>
    <END_REF_PT1>.18 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT OO E</END_REF_PT2>
    <COUNTY>STE. GENEVIEVE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>61</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>.88 MILES AFTER RT Y E                                                                              </START_PT>
    <END_PT>1.37 MILES AFTER RT Y E                                                                             </END_PT>
    <START_DATE>04-MAY-09</START_DATE>
    <END_DATE>14-AUG-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1500</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.88 MILES AFTER RT Y E                                                                              </BEG_REF_PT>
    <END_REF_PT>1.37 MILES AFTER RT Y E                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>LEFT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.88 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>RT Y E</BEG_REF_PT2>
    <END_REF_PT1>1.37 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT Y E</END_REF_PT2>
    <COUNTY>STE. GENEVIEVE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>61</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>AT MO 25 N                                                                                          </START_PT>
    <END_PT>1.37 MILES BEFORE RT Y W                                                                            </END_PT>
    <START_DATE>02-JUN-09</START_DATE>
    <END_DATE>11-SEP-09</END_DATE>
    <WORK_TYPE>SHOULDER WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1900</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT MO 25 N                                                                                          </BEG_REF_PT>
    <END_REF_PT>1.37 MILES BEFORE RT Y W                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>MO 25 N</BEG_REF_PT2>
    <END_REF_PT1>1.37 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>RT Y W</END_REF_PT2>
    <COUNTY>STE. GENEVIEVE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>61</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>1.37 MILES BEFORE RT HH W                                                                           </START_PT>
    <END_PT>AT RT HH W                                                                                          </END_PT>
    <START_DATE>23-JUN-09</START_DATE>
    <END_DATE>01-AUG-09</END_DATE>
    <WORK_TYPE>SHOULDER WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.37 MILES BEFORE RT HH W                                                                           </BEG_REF_PT>
    <END_REF_PT>AT RT HH W                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.37 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>RT HH W</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>RT HH W</END_REF_PT2>
    <COUNTY>SCOTT</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>62</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT RT B S                                                                                           </START_PT>
    <END_PT>AT CST MAIN ST S                                                                                    </END_PT>
    <START_DATE>29-JUN-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>RESURFACING WITH HOT-MIX ASPHALT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1800</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT RT B S                                                                                           </BEG_REF_PT>
    <END_REF_PT>AT CST MAIN ST S                                                                                    </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>RT B S</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>CST MAIN ST S</END_REF_PT2>
    <COUNTY>MISSISSIPPI</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>62</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>AT CST MAIN ST S                                                                                    </START_PT>
    <END_PT>AT RT B S                                                                                           </END_PT>
    <START_DATE>29-JUN-09</START_DATE>
    <END_DATE>02-JUL-09</END_DATE>
    <WORK_TYPE>RESURFACING WITH HOT-MIX ASPHALT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1800</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT CST MAIN ST S                                                                                    </BEG_REF_PT>
    <END_REF_PT>AT RT B S                                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>CST MAIN ST S</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>RT B S</END_REF_PT2>
    <COUNTY>MISSISSIPPI</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>65</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>.24 MILES AFTER MO 83 N                                                                             </START_PT>
    <END_PT>.53 MILES BEFORE MO 7 N                                                                             </END_PT>
    <START_DATE>22-JUN-09</START_DATE>
    <END_DATE>17-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1800</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.24 MILES AFTER MO 83 N                                                                             </BEG_REF_PT>
    <END_REF_PT>.53 MILES BEFORE MO 7 N                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.24 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>MO 83 N</BEG_REF_PT2>
    <END_REF_PT1>.53 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>MO 7 N</END_REF_PT2>
    <COUNTY>BENTON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>65</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>AT BU 65 S                                                                                          </START_PT>
    <END_PT>1.75 MILES AFTER BU 65 S                                                                            </END_PT>
    <START_DATE>29-JUN-09</START_DATE>
    <END_DATE>02-NOV-09</END_DATE>
    <WORK_TYPE>MILLING AND RESURFACING ASPHALT PAVEMENT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>SATURDAY</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT BU 65 S                                                                                          </BEG_REF_PT>
    <END_REF_PT>1.75 MILES AFTER BU 65 S                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>BU 65 S</BEG_REF_PT2>
    <END_REF_PT1>1.75 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>BU 65 S</END_REF_PT2>
    <COUNTY>SALINE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>65</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>1.75 MILES BEFORE BU 65 N                                                                           </START_PT>
    <END_PT>AT BU 65 S                                                                                          </END_PT>
    <START_DATE>29-JUN-09</START_DATE>
    <END_DATE>02-NOV-09</END_DATE>
    <WORK_TYPE>MILLING AND RESURFACING ASPHALT PAVEMENT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>SATURDAY</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.75 MILES BEFORE BU 65 N                                                                           </BEG_REF_PT>
    <END_REF_PT>AT BU 65 S                                                                                          </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.75 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>BU 65 N</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>BU 65 S</END_REF_PT2>
    <COUNTY>CARROLL</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>65</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>.54 MILES AFTER MO 7 S                                                                              </START_PT>
    <END_PT>.24 MILES BEFORE MO 83 S                                                                            </END_PT>
    <START_DATE>22-JUN-09</START_DATE>
    <END_DATE>17-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1800</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.54 MILES AFTER MO 7 S                                                                              </BEG_REF_PT>
    <END_REF_PT>.24 MILES BEFORE MO 83 S                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.54 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>MO 7 S</BEG_REF_PT2>
    <END_REF_PT1>.24 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>MO 83 S</END_REF_PT2>
    <COUNTY>BENTON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>67</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>1.61 MILES BEFORE RT FF S                                                                           </START_PT>
    <END_PT>1.3 MILES BEFORE RT FF S                                                                            </END_PT>
    <START_DATE>27-AUG-08</START_DATE>
    <END_DATE>15-AUG-09</END_DATE>
    <WORK_TYPE>TRAFFIC CONTROL SIGNING OR LIGHT SIGNALS</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1900</END_TIME>
    <NUMBER_LANES_CLOSED>00</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.61 MILES BEFORE RT FF S                                                                           </BEG_REF_PT>
    <END_REF_PT>1.3 MILES BEFORE RT FF S                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>NONE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.61 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>RT FF S</BEG_REF_PT2>
    <END_REF_PT1>1.3 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>RT FF S</END_REF_PT2>
    <COUNTY>WAYNE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>67</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>2.78 MILES BEFORE RT N E                                                                            </START_PT>
    <END_PT>.54 MILES BEFORE RT E E                                                                             </END_PT>
    <START_DATE>07-JUN-08</START_DATE>
    <END_DATE>01-OCT-10</END_DATE>
    <WORK_TYPE>ROADSIDE MAINTENANCE</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1900</END_TIME>
    <NUMBER_LANES_CLOSED>00</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>2.78 MILES BEFORE RT N E                                                                            </BEG_REF_PT>
    <END_REF_PT>.54 MILES BEFORE RT E E                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>NONE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>2.78 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>RT N E</BEG_REF_PT2>
    <END_REF_PT1>.54 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>RT E E</END_REF_PT2>
    <COUNTY>MADISON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>67</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>1 MILE AFTER RT N W                                                                                 </START_PT>
    <END_PT>2.21 MILES AFTER RT N W                                                                             </END_PT>
    <START_DATE>18-MAY-09</START_DATE>
    <END_DATE>31-DEC-09</END_DATE>
    <WORK_TYPE>SHOULDER WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1900</END_TIME>
    <NUMBER_LANES_CLOSED>00</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1 MILE AFTER RT N W                                                                                 </BEG_REF_PT>
    <END_REF_PT>2.21 MILES AFTER RT N W                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>NONE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1 MILE AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>RT N W</BEG_REF_PT2>
    <END_REF_PT1>2.21 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT N W</END_REF_PT2>
    <COUNTY>MADISON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>67</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>AT CST DOUBET RD W                                                                                  </START_PT>
    <END_PT>AT CST LIBERTY ST W                                                                                 </END_PT>
    <START_DATE>27-MAY-09</START_DATE>
    <END_DATE>28-AUG-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>2000</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT CST DOUBET RD W                                                                                  </BEG_REF_PT>
    <END_REF_PT>AT CST LIBERTY ST W                                                                                 </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>CST DOUBET RD W</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>CST LIBERTY ST W</END_REF_PT2>
    <COUNTY>ST. FRANCOIS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>67</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>AT CST CEDAR FALLS RD W                                                                             </START_PT>
    <END_PT>.8 MILES BEFORE MO 47 N                                                                             </END_PT>
    <START_DATE>23-JUN-09</START_DATE>
    <END_DATE>09-JUL-09</END_DATE>
    <WORK_TYPE>SHOULDER WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>2000</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT CST CEDAR FALLS RD W                                                                             </BEG_REF_PT>
    <END_REF_PT>.8 MILES BEFORE MO 47 N                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>CST CEDAR FALLS RD W</BEG_REF_PT2>
    <END_REF_PT1>.8 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>MO 47 N</END_REF_PT2>
    <COUNTY>ST. FRANCOIS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>67</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>.2 MILES AFTER MO 47 S                                                                              </START_PT>
    <END_PT>1.57 MILES BEFORE CST CEDAR FALLS RD W                                                              </END_PT>
    <START_DATE>07-JUN-08</START_DATE>
    <END_DATE>31-AUG-09</END_DATE>
    <WORK_TYPE>ROADSIDE MAINTENANCE</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1900</END_TIME>
    <NUMBER_LANES_CLOSED>00</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.2 MILES AFTER MO 47 S                                                                              </BEG_REF_PT>
    <END_REF_PT>1.57 MILES BEFORE CST CEDAR FALLS RD W                                                              </END_REF_PT>
    <CLOSURE_LOCATION>NONE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.2 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>MO 47 S</BEG_REF_PT2>
    <END_REF_PT1>1.57 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>CST CEDAR FALLS RD W</END_REF_PT2>
    <COUNTY>ST. FRANCOIS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>67</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>.81 MILES AFTER MO 47 S                                                                             </START_PT>
    <END_PT>AT CST CEDAR FALLS RD W                                                                             </END_PT>
    <START_DATE>23-JUN-09</START_DATE>
    <END_DATE>09-JUL-09</END_DATE>
    <WORK_TYPE>SHOULDER WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>2000</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.81 MILES AFTER MO 47 S                                                                             </BEG_REF_PT>
    <END_REF_PT>AT CST CEDAR FALLS RD W                                                                             </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.81 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>MO 47 S</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>CST CEDAR FALLS RD W</END_REF_PT2>
    <COUNTY>ST. FRANCOIS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>67</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>AT CST LIBERTY ST W                                                                                 </START_PT>
    <END_PT>AT CST DOUBET RD W                                                                                  </END_PT>
    <START_DATE>27-MAY-09</START_DATE>
    <END_DATE>28-AUG-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>2000</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT CST LIBERTY ST W                                                                                 </BEG_REF_PT>
    <END_REF_PT>AT CST DOUBET RD W                                                                                  </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>CST LIBERTY ST W</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>CST DOUBET RD W</END_REF_PT2>
    <COUNTY>ST. FRANCOIS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>67</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>2.21 MILES BEFORE RT N E                                                                            </START_PT>
    <END_PT>1 MILE BEFORE RT N E                                                                                </END_PT>
    <START_DATE>18-MAY-09</START_DATE>
    <END_DATE>31-DEC-09</END_DATE>
    <WORK_TYPE>SHOULDER WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1900</END_TIME>
    <NUMBER_LANES_CLOSED>00</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>2.21 MILES BEFORE RT N E                                                                            </BEG_REF_PT>
    <END_REF_PT>1 MILE BEFORE RT N E                                                                                </END_REF_PT>
    <CLOSURE_LOCATION>NONE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>2.21 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>RT N E</BEG_REF_PT2>
    <END_REF_PT1>1 MILE BEFORE</END_REF_PT1>
    <END_REF_PT2>RT N E</END_REF_PT2>
    <COUNTY>MADISON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>67</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>1.3 MILES AFTER RT FF N                                                                             </START_PT>
    <END_PT>1.61 MILES AFTER RT FF N                                                                            </END_PT>
    <START_DATE>27-AUG-08</START_DATE>
    <END_DATE>15-AUG-09</END_DATE>
    <WORK_TYPE>TRAFFIC CONTROL SIGNING OR LIGHT SIGNALS</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1900</END_TIME>
    <NUMBER_LANES_CLOSED>00</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>1.3 MILES AFTER RT FF N                                                                             </BEG_REF_PT>
    <END_REF_PT>1.61 MILES AFTER RT FF N                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>NONE</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>1.3 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>RT FF N</BEG_REF_PT2>
    <END_REF_PT1>1.61 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT FF N</END_REF_PT2>
    <COUNTY>WAYNE</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>69</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>AT MO 13 N                                                                                          </START_PT>
    <END_PT>1.09 MILES AFTER RT EE S                                                                            </END_PT>
    <START_DATE>15-JUN-09</START_DATE>
    <END_DATE>10-JUL-09</END_DATE>
    <WORK_TYPE>RESURFACING WITH HOT-MIX ASPHALT</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>2000</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT MO 13 N                                                                                          </BEG_REF_PT>
    <END_REF_PT>1.09 MILES AFTER RT EE S                                                                            </END_REF_PT>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>MO 13 N</BEG_REF_PT2>
    <END_REF_PT1>1.09 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT EE S</END_REF_PT2>
    <COUNTY>HARRISON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>71</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>.98 MILES BEFORE MO 7 S                                                                             </START_PT>
    <END_PT>2.32 MILES AFTER MO 291 S                                                                           </END_PT>
    <START_DATE>29-JUN-09</START_DATE>
    <END_DATE>08-JUL-09</END_DATE>
    <WORK_TYPE>PAVEMENT STRIPING</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0100</START_TIME>
    <END_TIME>2400</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.98 MILES BEFORE MO 7 S                                                                             </BEG_REF_PT>
    <END_REF_PT>2.32 MILES AFTER MO 291 S                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.98 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>MO 7 S</BEG_REF_PT2>
    <END_REF_PT1>2.32 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>MO 291 S</END_REF_PT2>
    <COUNTY>CASS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>71</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>.24 MILES BEFORE CST BANNISTER RD E                                                                 </START_PT>
    <END_PT>.54 MILES BEFORE CST GREGORY BLVD W                                                                 </END_PT>
    <START_DATE>08-JUN-09</START_DATE>
    <END_DATE>11-JUL-09</END_DATE>
    <WORK_TYPE>JOINT AND CRACK SEALING</WORK_TYPE>
    <WORK_HOURS>NIGHT</WORK_HOURS>
    <WEEKEND>SATURDAY</WEEKEND>
    <START_TIME>1900</START_TIME>
    <END_TIME>0500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.24 MILES BEFORE CST BANNISTER RD E                                                                 </BEG_REF_PT>
    <END_REF_PT>.54 MILES BEFORE CST GREGORY BLVD W                                                                 </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.24 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>CST BANNISTER RD E</BEG_REF_PT2>
    <END_REF_PT1>.54 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>CST GREGORY BLVD W</END_REF_PT2>
    <COUNTY>JACKSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>71</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>.56 MILES AFTER CST GREGORY BLVD E                                                                  </START_PT>
    <END_PT>.24 MILES AFTER RT W E                                                                              </END_PT>
    <START_DATE>01-JUN-09</START_DATE>
    <END_DATE>11-JUL-09</END_DATE>
    <WORK_TYPE>JOINT AND CRACK SEALING</WORK_TYPE>
    <WORK_HOURS>NIGHT</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>2100</START_TIME>
    <END_TIME>0600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>.56 MILES AFTER CST GREGORY BLVD E                                                                  </BEG_REF_PT>
    <END_REF_PT>.24 MILES AFTER RT W E                                                                              </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>.56 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>CST GREGORY BLVD E</BEG_REF_PT2>
    <END_REF_PT1>.24 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT W E</END_REF_PT2>
    <COUNTY>JACKSON</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>71</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>2.32 MILES BEFORE MO 291 N                                                                          </START_PT>
    <END_PT>.98 MILES AFTER MO 7 S                                                                              </END_PT>
    <START_DATE>29-JUN-09</START_DATE>
    <END_DATE>08-JUL-09</END_DATE>
    <WORK_TYPE>PAVEMENT STRIPING</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0100</START_TIME>
    <END_TIME>2400</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>2.32 MILES BEFORE MO 291 N                                                                          </BEG_REF_PT>
    <END_REF_PT>.98 MILES AFTER MO 7 S                                                                              </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>2.32 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>MO 291 N</BEG_REF_PT2>
    <END_REF_PT1>.98 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>MO 7 S</END_REF_PT2>
    <COUNTY>CASS</COUNTY>
  </workzones>
  <workzones>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>71</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>AT RT A W                                                                                           </START_PT>
    <END_PT>AT RT A E                                                                                           </END_PT>
    <START_DATE>01-JUL-09</START_DATE>
    <END_DATE>01-AUG-09</END_DATE>
    <WORK_TYPE>RESURFACING WITH HOT-MIX ASPHALT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>BOTH</WEEKEND>
    <START_TIME>0500</START_TIME>
    <END_TIME>1900</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <BEG_REF_PT>AT RT A W                                                                                           </BEG_REF_PT>
    <END_REF_PT>AT RT A E                                                                                           </END_REF_PT>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>RT A W</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>RT A E</END_REF_PT2>
    <COUNTY>CASS</COUNTY>
  </workzones>
  <workzones_future>
    <GOOGLE_POINT>38.849573542,-94.174454245</GOOGLE_POINT>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>E</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>AT MO 150 E                                                                                         </START_PT>
    <END_PT>.95 MILES BEFORE RT VV E                                                                            </END_PT>
    <START_DATE>06-JUL-09</START_DATE>
    <END_DATE>10-JUL-09</END_DATE>
    <WORK_TYPE>RESURFACING WITH HOT-MIX ASPHALT</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0500</START_TIME>
    <END_TIME>2100</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <MIN_MBR>38.8348081871788,-94.175277860614</MIN_MBR>
    <MAX_MBR>38.8643316700629,-94.1736277508678</MAX_MBR>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>MO 150 E</BEG_REF_PT2>
    <END_REF_PT1>.95 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>RT VV E</END_REF_PT2>
    <COUNTY>JACKSON</COUNTY>
  </workzones_future>
  <workzones_future>
    <GOOGLE_POINT>40.018528778,-92.717166623</GOOGLE_POINT>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>156</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT MO 149 S                                                                                         </START_PT>
    <END_PT>4.35 MILES AFTER MO 149 N                                                                           </END_PT>
    <START_DATE>07-JUL-09</START_DATE>
    <END_DATE>08-JUL-09</END_DATE>
    <WORK_TYPE>CHIP SEAL</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <MIN_MBR>40.018040347257,-92.7576347604732</MIN_MBR>
    <MAX_MBR>40.027673093334,-92.6907536202603</MAX_MBR>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>MO 149 S</BEG_REF_PT2>
    <END_REF_PT1>4.35 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>MO 149 N</END_REF_PT2>
    <COUNTY>MACON</COUNTY>
  </workzones_future>
  <workzones_future>
    <GOOGLE_POINT>38.849573542,-94.174454245</GOOGLE_POINT>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>E</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>.95 MILES AFTER RT VV W                                                                             </START_PT>
    <END_PT>AT MO 150 E                                                                                         </END_PT>
    <START_DATE>06-JUL-09</START_DATE>
    <END_DATE>10-JUL-09</END_DATE>
    <WORK_TYPE>RESURFACING WITH HOT-MIX ASPHALT</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0500</START_TIME>
    <END_TIME>0900</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <MIN_MBR>38.8348081871788,-94.175277860614</MIN_MBR>
    <MAX_MBR>38.8643316700629,-94.1736277508678</MAX_MBR>
    <BEG_REF_PT1>.95 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>RT VV W</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>MO 150 E</END_REF_PT2>
    <COUNTY>JACKSON</COUNTY>
  </workzones_future>
  <workzones_future>
    <GOOGLE_POINT>40.018528778,-92.717166622</GOOGLE_POINT>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>156</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>4.35 MILES BEFORE MO 149 S                                                                          </START_PT>
    <END_PT>AT MO 149 S                                                                                         </END_PT>
    <START_DATE>06-JUL-09</START_DATE>
    <END_DATE>06-JUL-09</END_DATE>
    <WORK_TYPE>CHIP SEAL</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <MIN_MBR>40.018040347257,-92.7576347604732</MIN_MBR>
    <MAX_MBR>40.027673093334,-92.6907536205208</MAX_MBR>
    <BEG_REF_PT1>4.35 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>MO 149 S</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>MO 149 S</END_REF_PT2>
    <COUNTY>MACON</COUNTY>
  </workzones_future>
  <workzones_future>
    <GOOGLE_POINT>40.310087898,-93.341527098</GOOGLE_POINT>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>E</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>.33 MILES AFTER MO 139 N                                                                            </START_PT>
    <END_PT>.34 MILES AFTER MO 139 N                                                                            </END_PT>
    <START_DATE>06-JUL-09</START_DATE>
    <END_DATE>06-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0800</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <MIN_MBR>40.3100768032517,-93.3415620963933</MIN_MBR>
    <MAX_MBR>40.3100989919526,-93.3414920998918</MAX_MBR>
    <BEG_REF_PT1>.33 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>MO 139 N</BEG_REF_PT2>
    <END_REF_PT1>.34 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>MO 139 N</END_REF_PT2>
    <COUNTY>SULLIVAN</COUNTY>
  </workzones_future>
  <workzones_future>
    <GOOGLE_POINT>40.310087898,-93.341527098</GOOGLE_POINT>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>E</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>.34 MILES BEFORE MO 139 S                                                                           </START_PT>
    <END_PT>.33 MILES BEFORE MO 139 S                                                                           </END_PT>
    <START_DATE>06-JUL-09</START_DATE>
    <END_DATE>06-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0800</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <MIN_MBR>40.3100768031858,-93.3415620961857</MIN_MBR>
    <MAX_MBR>40.3100989918868,-93.3414920996841</MAX_MBR>
    <BEG_REF_PT1>.34 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>MO 139 S</BEG_REF_PT2>
    <END_REF_PT1>.33 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>MO 139 S</END_REF_PT2>
    <COUNTY>SULLIVAN</COUNTY>
  </workzones_future>
  <workzones_future>
    <GOOGLE_POINT>36.690846005,-90.281796781</GOOGLE_POINT>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>AA</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>2 MILES BEFORE MO 51 N                                                                              </START_PT>
    <END_PT>1.98 MILES BEFORE MO 51 N                                                                           </END_PT>
    <START_DATE>09-JUL-09</START_DATE>
    <END_DATE>09-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <MIN_MBR>36.6908429172167,-90.2819138222912</MIN_MBR>
    <MAX_MBR>36.690848847909,-90.2816797814963</MAX_MBR>
    <BEG_REF_PT1>2 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>MO 51 N</BEG_REF_PT2>
    <END_REF_PT1>1.98 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>MO 51 N</END_REF_PT2>
    <COUNTY>BUTLER</COUNTY>
  </workzones_future>
  <workzones_future>
    <GOOGLE_POINT>38.799294168,-90.328598446</GOOGLE_POINT>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>67</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>.23 MILES AFTER CST TAYLOR RD E                                                                     </START_PT>
    <END_PT>AT RT AC S                                                                                          </END_PT>
    <START_DATE>06-JUL-09</START_DATE>
    <END_DATE>15-JUL-09</END_DATE>
    <WORK_TYPE>RESURFACING WITH HOT-MIX ASPHALT</WORK_TYPE>
    <WORK_HOURS>NIGHT</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>1900</START_TIME>
    <END_TIME>0500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>HIGH</LEVEL_OF_IMPACT>
    <MIN_MBR>38.784298060519,-90.3543335592868</MIN_MBR>
    <MAX_MBR>38.8092339316248,-90.2989481376885</MAX_MBR>
    <BEG_REF_PT1>.23 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>CST TAYLOR RD E</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>RT AC S</END_REF_PT2>
    <COUNTY>ST. LOUIS</COUNTY>
  </workzones_future>
  <workzones_future>
    <GOOGLE_POINT>40.342678836,-94.011296269</GOOGLE_POINT>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>35</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>1.83 MILES AFTER RT A E                                                                             </START_PT>
    <END_PT>2.63 MILES AFTER RT A E                                                                             </END_PT>
    <START_DATE>06-JUL-09</START_DATE>
    <END_DATE>09-JUL-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <MIN_MBR>40.3368807291766,-94.0114149795149</MIN_MBR>
    <MAX_MBR>40.3484054559951,-94.0102571074169</MAX_MBR>
    <BEG_REF_PT1>1.83 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>RT A E</BEG_REF_PT2>
    <END_REF_PT1>2.63 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT A E</END_REF_PT2>
    <COUNTY>HARRISON</COUNTY>
  </workzones_future>
  <workzones_future>
    <GOOGLE_POINT>37.334366449,-93.832511944</GOOGLE_POINT>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>39</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>1.66 MILES AFTER US 160 W                                                                           </START_PT>
    <END_PT>1.89 MILES AFTER RT Z E                                                                             </END_PT>
    <START_DATE>06-JUL-09</START_DATE>
    <END_DATE>07-JUL-09</END_DATE>
    <WORK_TYPE>CHIP SEAL</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1700</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <MIN_MBR>37.3009986338356,-93.8421835151875</MIN_MBR>
    <MAX_MBR>37.3664147646713,-93.832166844323</MAX_MBR>
    <BEG_REF_PT1>1.66 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>US 160 W</BEG_REF_PT2>
    <END_REF_PT1>1.89 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT Z E</END_REF_PT2>
    <COUNTY>DADE</COUNTY>
  </workzones_future>
  <workzones_future>
    <GOOGLE_POINT>36.743523188,-90.411451327</GOOGLE_POINT>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>53</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>.13 MILES AFTER CST ELEVENTH ST N                                                                   </START_PT>
    <END_PT>AT BU 67 S                                                                                          </END_PT>
    <START_DATE>06-JUL-09</START_DATE>
    <END_DATE>06-JUL-09</END_DATE>
    <WORK_TYPE>PAVEMENT REPAIR OF CONCRETE PAVEMENT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <MIN_MBR>36.7424749392173,-90.4134375981097</MIN_MBR>
    <MAX_MBR>36.7446039259767,-90.4094365198057</MAX_MBR>
    <BEG_REF_PT1>.13 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>CST ELEVENTH ST N</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>BU 67 S</END_REF_PT2>
    <COUNTY>BUTLER</COUNTY>
  </workzones_future>
  <workzones_future>
    <GOOGLE_POINT>37.752222705,-91.72228839</GOOGLE_POINT>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>O</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>4.96 MILES BEFORE RT C N                                                                            </START_PT>
    <END_PT>AT RT C N                                                                                           </END_PT>
    <START_DATE>06-JUL-09</START_DATE>
    <END_DATE>09-JUL-09</END_DATE>
    <WORK_TYPE>JOINT AND CRACK SEALING</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1800</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <MIN_MBR>37.7165271801657,-91.7308732964794</MIN_MBR>
    <MAX_MBR>37.7871483012087,-91.7199155544707</MAX_MBR>
    <BEG_REF_PT1>4.96 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>RT C N</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>RT C N</END_REF_PT2>
    <COUNTY>DENT</COUNTY>
  </workzones_future>
  <workzones_future>
    <GOOGLE_POINT>37.752222705,-91.72228839</GOOGLE_POINT>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>O</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>AT RT C N                                                                                           </START_PT>
    <END_PT>4.96 MILES AFTER RT C S                                                                             </END_PT>
    <START_DATE>06-JUL-09</START_DATE>
    <END_DATE>09-JUL-09</END_DATE>
    <WORK_TYPE>JOINT AND CRACK SEALING</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0600</START_TIME>
    <END_TIME>1800</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <MIN_MBR>37.7165271801657,-91.7308732964794</MIN_MBR>
    <MAX_MBR>37.7871483012087,-91.7199155544707</MAX_MBR>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>RT C N</BEG_REF_PT2>
    <END_REF_PT1>4.96 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT C S</END_REF_PT2>
    <COUNTY>DENT</COUNTY>
  </workzones_future>
  <workzones_future>
    <GOOGLE_POINT>38.755467481,-90.45802638</GOOGLE_POINT>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>70</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>.03 MILES BEFORE CST EARTH CITY EXPY N                                                              </START_PT>
    <END_PT>.03 MILES BEFORE CST EARTH CITY EXPY N                                                              </END_PT>
    <START_DATE>06-JUL-09</START_DATE>
    <END_DATE>07-JUL-09</END_DATE>
    <WORK_TYPE>PAVEMENT REPAIR OF CONCRETE PAVEMENT</WORK_TYPE>
    <WORK_HOURS>NIGHT</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>1900</START_TIME>
    <END_TIME>0500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <MIN_MBR>38.7554643120895,-90.4580345195711</MIN_MBR>
    <MAX_MBR>38.7554706493219,-90.4580182394985</MAX_MBR>
    <BEG_REF_PT1>.03 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>CST EARTH CITY EXPY N</BEG_REF_PT2>
    <END_REF_PT1>.03 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>CST EARTH CITY EXPY N</END_REF_PT2>
    <COUNTY>ST. LOUIS</COUNTY>
  </workzones_future>
  <workzones_future>
    <GOOGLE_POINT>38.808545444,-90.840256616</GOOGLE_POINT>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>61</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>AT CST PITMAN AVE W                                                                                 </START_PT>
    <END_PT>.17 MILES AFTER US 40 E                                                                             </END_PT>
    <START_DATE>06-JUL-09</START_DATE>
    <END_DATE>06-JUL-09</END_DATE>
    <WORK_TYPE>PAVEMENT REPAIR OF CONCRETE PAVEMENT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0900</START_TIME>
    <END_TIME>1500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <MIN_MBR>38.8052774551369,-90.8417156631381</MIN_MBR>
    <MAX_MBR>38.8125052370288,-90.8374898777258</MAX_MBR>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>CST PITMAN AVE W</BEG_REF_PT2>
    <END_REF_PT1>.17 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>US 40 E</END_REF_PT2>
    <COUNTY>ST. CHARLES</COUNTY>
  </workzones_future>
  <workzones_future>
    <GOOGLE_POINT>38.808545444,-90.840256616</GOOGLE_POINT>
    <DESIGNATION>US</DESIGNATION>
    <TRAVELWAY_NAME>61</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>AT CST PITMAN AVE W                                                                                 </START_PT>
    <END_PT>.24 MILES AFTER US 40 E                                                                             </END_PT>
    <START_DATE>08-JUL-09</START_DATE>
    <END_DATE>08-JUL-09</END_DATE>
    <WORK_TYPE>PAVEMENT REPAIR OF CONCRETE PAVEMENT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0900</START_TIME>
    <END_TIME>1500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <CLOSURE_LOCATION>LEFT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <MIN_MBR>38.8052774551369,-90.8417156631381</MIN_MBR>
    <MAX_MBR>38.8125052370288,-90.8374898777258</MAX_MBR>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>CST PITMAN AVE W</BEG_REF_PT2>
    <END_REF_PT1>.24 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>US 40 E</END_REF_PT2>
    <COUNTY>ST. CHARLES</COUNTY>
  </workzones_future>
  <workzones_future>
    <GOOGLE_POINT>38.52039017,-90.327291742</GOOGLE_POINT>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>55</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>.31 MILES AFTER US 67 N                                                                             </START_PT>
    <END_PT>AT CST GREEN PARK RD W                                                                              </END_PT>
    <START_DATE>06-JUL-09</START_DATE>
    <END_DATE>06-JUL-09</END_DATE>
    <WORK_TYPE>SHOULDER WORK</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0900</START_TIME>
    <END_TIME>1500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <MIN_MBR>38.5157138093747,-90.3342143566473</MIN_MBR>
    <MAX_MBR>38.5245105794134,-90.3196836319182</MAX_MBR>
    <BEG_REF_PT1>.31 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>US 67 N</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>CST GREEN PARK RD W</END_REF_PT2>
    <COUNTY>ST. LOUIS</COUNTY>
  </workzones_future>
  <workzones_future>
    <GOOGLE_POINT>38.999072754,-91.647155782</GOOGLE_POINT>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>B</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>3.05 MILES AFTER RT N N                                                                             </START_PT>
    <END_PT>4.22 MILES AFTER RT N N                                                                             </END_PT>
    <START_DATE>07-JUL-09</START_DATE>
    <END_DATE>07-JUL-09</END_DATE>
    <WORK_TYPE>CULVERT REPLACEMENT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0800</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <MIN_MBR>38.9972337058345,-91.6563435139961</MIN_MBR>
    <MAX_MBR>38.9994570925619,-91.6363101654566</MAX_MBR>
    <BEG_REF_PT1>3.05 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>RT N N</BEG_REF_PT2>
    <END_REF_PT1>4.22 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT N N</END_REF_PT2>
    <COUNTY>CALLAWAY</COUNTY>
  </workzones_future>
  <workzones_future>
    <GOOGLE_POINT>38.977583658,-91.703492879</GOOGLE_POINT>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>EE</TRAVELWAY_NAME>
    <DIRECTION>N</DIRECTION>
    <START_PT>3.85 MILES BEFORE RT B W                                                                            </START_PT>
    <END_PT>1.84 MILES BEFORE RT B W                                                                            </END_PT>
    <START_DATE>08-JUL-09</START_DATE>
    <END_DATE>08-JUL-09</END_DATE>
    <WORK_TYPE>CULVERT REPLACEMENT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0800</START_TIME>
    <END_TIME>1600</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <MIN_MBR>38.9705784009689,-91.7133069808392</MIN_MBR>
    <MAX_MBR>38.9849959352952,-91.6899823752372</MAX_MBR>
    <BEG_REF_PT1>3.85 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>RT B W</BEG_REF_PT2>
    <END_REF_PT1>1.84 MILES BEFORE</END_REF_PT1>
    <END_REF_PT2>RT B W</END_REF_PT2>
    <COUNTY>CALLAWAY</COUNTY>
  </workzones_future>
  <workzones_future>
    <GOOGLE_POINT>37.911042245,-92.253710989</GOOGLE_POINT>
    <DESIGNATION>MO</DESIGNATION>
    <TRAVELWAY_NAME>17</TRAVELWAY_NAME>
    <DIRECTION>S</DIRECTION>
    <START_PT>3.91 MILES BEFORE MO 133 S                                                                          </START_PT>
    <END_PT>AT LP 44 W                                                                                          </END_PT>
    <START_DATE>06-JUL-09</START_DATE>
    <END_DATE>31-JUL-09</END_DATE>
    <WORK_TYPE>MILLING AND RESURFACING ASPHALT PAVEMENT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>2000</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <CLOSURE_LOCATION>VARIOUS</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <MIN_MBR>37.8284647529803,-92.2726510000752</MIN_MBR>
    <MAX_MBR>38.0181318375217,-92.193936839411</MAX_MBR>
    <BEG_REF_PT1>3.91 MILES BEFORE</BEG_REF_PT1>
    <BEG_REF_PT2>MO 133 S</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>LP 44 W</END_REF_PT2>
    <COUNTY>PULASKI</COUNTY>
  </workzones_future>
  <workzones_future>
    <GOOGLE_POINT>39.448351823,-94.396132755</GOOGLE_POINT>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>CC</TRAVELWAY_NAME>
    <DIRECTION>W</DIRECTION>
    <START_PT>AT MO 33 N                                                                                          </START_PT>
    <END_PT>AT RT C S                                                                                           </END_PT>
    <START_DATE>07-JUL-09</START_DATE>
    <END_DATE>08-AUG-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>SATURDAY</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1900</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <MIN_MBR>39.4482688084689,-94.4254316998143</MIN_MBR>
    <MAX_MBR>39.4483787409277,-94.3668269940672</MAX_MBR>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>MO 33 N</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>RT C S</END_REF_PT2>
    <COUNTY>CLAY</COUNTY>
  </workzones_future>
  <workzones_future>
    <GOOGLE_POINT>39.448351823,-94.396132755</GOOGLE_POINT>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>CC</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT RT C S                                                                                           </START_PT>
    <END_PT>AT MO 33 N                                                                                          </END_PT>
    <START_DATE>07-JUL-09</START_DATE>
    <END_DATE>08-AUG-09</END_DATE>
    <WORK_TYPE>BRIDGE WORK</WORK_TYPE>
    <WORK_HOURS>24 HOUR</WORK_HOURS>
    <WEEKEND>SATURDAY</WEEKEND>
    <START_TIME>0700</START_TIME>
    <END_TIME>1900</END_TIME>
    <NUMBER_LANES_CLOSED>02</NUMBER_LANES_CLOSED>
    <CLOSURE_LOCATION>ALL</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>CLOSED</LEVEL_OF_IMPACT>
    <MIN_MBR>39.4482688084689,-94.4254316998143</MIN_MBR>
    <MAX_MBR>39.4483787409277,-94.3668269940672</MAX_MBR>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>RT C S</BEG_REF_PT2>
    <END_REF_PT1>AT</END_REF_PT1>
    <END_REF_PT2>MO 33 N</END_REF_PT2>
    <COUNTY>CLAY</COUNTY>
  </workzones_future>
  <workzones_future>
    <GOOGLE_POINT>38.772115049,-91.896387748</GOOGLE_POINT>
    <DESIGNATION>RT</DESIGNATION>
    <TRAVELWAY_NAME>AD</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>AT RT C S                                                                                           </START_PT>
    <END_PT>2.64 MILES AFTER RT C N                                                                             </END_PT>
    <START_DATE>06-JUL-09</START_DATE>
    <END_DATE>10-JUL-09</END_DATE>
    <WORK_TYPE>PATCHING OF ASPHALT PAVEMENT</WORK_TYPE>
    <WORK_HOURS>DAY</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>0800</START_TIME>
    <END_TIME>1500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <MIN_MBR>38.7668330185357,-91.9183681639202</MIN_MBR>
    <MAX_MBR>38.7723892870525,-91.8740762746652</MAX_MBR>
    <BEG_REF_PT1>AT</BEG_REF_PT1>
    <BEG_REF_PT2>RT C S</BEG_REF_PT2>
    <END_REF_PT1>2.64 MILES AFTER</END_REF_PT1>
    <END_REF_PT2>RT C N</END_REF_PT2>
    <COUNTY>CALLAWAY</COUNTY>
  </workzones_future>
  <workzones_future>
    <GOOGLE_POINT>38.542894052,-90.464582884</GOOGLE_POINT>
    <DESIGNATION>IS</DESIGNATION>
    <TRAVELWAY_NAME>44</TRAVELWAY_NAME>
    <DIRECTION>E</DIRECTION>
    <START_PT>.18 MILES AFTER MO 141 N                                                                            </START_PT>
    <END_PT>.1 MILES BEFORE CST YARNELL RD N                                                                    </END_PT>
    <START_DATE>07-JUL-09</START_DATE>
    <END_DATE>08-JUL-09</END_DATE>
    <WORK_TYPE>PAVEMENT REPAIR OF CONCRETE PAVEMENT</WORK_TYPE>
    <WORK_HOURS>NIGHT</WORK_HOURS>
    <WEEKEND>NONE</WEEKEND>
    <START_TIME>1800</START_TIME>
    <END_TIME>0500</END_TIME>
    <NUMBER_LANES_CLOSED>01</NUMBER_LANES_CLOSED>
    <CLOSURE_LOCATION>RIGHT</CLOSURE_LOCATION>
    <LEVEL_OF_IMPACT>MEDIUM</LEVEL_OF_IMPACT>
    <MIN_MBR>38.5394044443539,-90.4923207064902</MIN_MBR>
    <MAX_MBR>38.5428839534287,-90.4362572310664</MAX_MBR>
    <BEG_REF_PT1>.18 MILES AFTER</BEG_REF_PT1>
    <BEG_REF_PT2>MO 141 N</BEG_REF_PT2>
    <END_REF_PT1>.1 MILES BEFORE</END_R